I. INTRODUCTION
This test plan describes the use of Doble F2000 test instruments to perform the manufacturers’acceptance tests. Relay
settings and test connections are included.
Additional references:
The Type CO series of protective relays are used to sense the current level in an A.C. line, the relay operates (trips) when the
current exceeds the relay setting. The operating time is inversely proportional to the current , as a multiple of the set value.
The current setting is selected by a tap screw and the operating time can be scaled by a time dial which offsets the disc from
the maximum time position. The relay uses an induction disc current element. Different models (e.g. CO---9, CO---11) have
different current---time curves. Other options include Instantaneous unit (normal or high dropout) for high speed tripping
on heavy overcurrents, torque control input to allow remote enabling from another relay, and contact opening action for
A.C. tripping duty. The CO---4 includes an auxiliary timer for use with air circuit breakers.
CO =Inverse element
IIT =Indicating instantaneous trip ICS
(if fitted)
ICS =Indicating contactor switch
TC =OC Torque control winding IIT ICS CO
(not always brought out) CO
SS =Case C.T. shorting switch TC
IIT
*.N.B. The connection from CO/IIT
is not made through the test switch SS *
to the case terminals.
10 9 8 7 6 5 4 3 2 1
Always turn the source output OFF before connecting , removing or touching any output terminal or cable, use extreme
caution when turning on or using any Doble F2000 Test Instrument.
NOTE:
ALWAYS TEST THIS RELAY IN ITS CASE AND IN A VERTICAL POSITION. USE LOWEST PRACTICAL
SOURCE RANGE FOR BEST RESOLUTION AND MAXIMIZED TEST POWER.
V.A. Assemble the sources required and connect all timing, control, and supply cables.
V.B. If relay has torque control option connect terminals 5 and 6 together.
V.C.2. Connect source outputs to relay inputs as shown in preset column. (input of slave D.C. source must be con-
nected to output of A.C. source only when V/I DC is specified).
PHASOR DIAGRAM
H1 (ACTION)
IX.A. Connect control cable between F2410 D.C. slave and F2410 socket on A.C. source. Assign source H1 as DI. Connect
output of A.C. source to input of D.C. slave.
ACTION
PRESET CONDITIONS
PULSED RAMP IDC
SRC CONNECT TST VALUE FREQ
ASS SRC AMPL MAXIMUM ON TIME = 1 SECOND
HI LO PHASE HZ
EXPECTED = SET VALUE ± 10%
VA
VB X.A. Initially set DI current to 50% of ICS setting.
VC
I1 X.B. Close CO unit contact by hand.
I2
I3 X.C. Pulse D.C. output on/off using source DI on/
BAT off control.
VDC
DI 1 10 IDC ACTION --- --- --- --- -- --- --- ---
Increment current 5% of setting and repeat till
ICS operating point is found.
XI. CONCLUSION
XI.B. If terminals 5 and 6 were connected together in section 5.2 remove this temporary connection. Ensure relay has been
restored to normal service condition.