Вы находитесь на странице: 1из 4

MDR PGE

MASTER DOCUMENT REGI

PEKERJAAN INFRASTRUKTUR TAPPING JALUR REINJEKSI D-F KE

PEMILIK PROYEK : PT PERTAMINA GEOTHERMAL ENERGY


KONTRAKTOR UTAMA : PT BINA RASANO ENGINEERING
NO. KONTRAK / PENUGASAN: :
No. Document No. Discipline
1. INSPECTION AND TEST PLAN
1 001/ITP-BRE/X/2019 ITP
2. DESIGN BASIS
1 UBL-PRS-DB-001 PIP
2 UBL-PRS-DB-002 PIP
3 UBL-PRS-DB-003 PIP
4 UBL-PRS-DB-004 PIP
5 UBL-PRS-DB-005 PIP
6 UBL-PRS-DB-006 PIP
7 UBL-PRS-DB-007 PIP
8 UBL-PRS-DB-008 CIV
9 UBL-PRS-DB-009 CIV

3. PROCEDURE
1 UBL-TEC-PSD-001 CIV
2 UBL-TEC-PSD-002 CIV
3 UBL-TEC-PSD-003 PIP
4 UBL-TEC-PSD-004 PIP
5 UBL-TEC-PSD-005 PIP
6 UBL-TEC-PSD-006 PIP
7 UBL-TEC-PSD-007 PIP
8 UBL-TEC-PSD-008 PIP
9 UBL-TEC-PSD-009 PIP
10 UBL-TEC-PSD-010 PIP

4. WPS/PQR, Welder Certificate, Welder List


1 UBL-WT-CRT-001 PIP
2 UBL-WT-CRT-002 PIP
3 UBL-WT-CRT-003 PIP

Page 1
MDR PGE

5. CIVIL WORK INSPECTION REPORT for Bore Pile and Pedestal (Coo
1 UBL-CVL-RPT-001 CIV
2 UBL-CVL-RPT-002 CIV
3 UBL-CVL-RPT-003 CIV

6. MATERIAL REPORT
1 UBL-CIV-RPT-001 CIV

7. PIPING REPORT
1 UBL-PIP-RPT-002 PIP
1 UBL-PIP-RPT-003 PIP

8. TEST PACKAGE
1 UBL-TP-RPT-001 PIP
2 UBL-TP-RPT-002 PIP
3 UBL-TP-RPT-003 PIP
4 UBL-TP-DWG-004 PIP
5 UBL-TP-RPT-005 PIP
6 UBL-TP-RPT-006 PIP
7 UBL-TP-RPT-007 PIP

9. DRAWING APPROVAL
1 BR-UB-PIP-DRW-001 PIP
2 BR-UB-PIP-DRW-002 PIP
3 BR-UB-PIP-DRW-003 PIP
4 BR-UB-PIP-DRW-004 PIP
1 BR-UB-PIP-DRW-005 PIP
5 BR-UB-CIV-DRW-006 CIV
6 BR-UB-CIV-DRW-007 CIV
7 BR-UB-PS-DRW-008 PIP
8 BR-UB-PS-DRW-009 PIP

Page 2
MDR PGE

ER DOCUMENT REGISTER

KTUR TAPPING JALUR REINJEKSI D-F KE JALUR REINJEKSI SS-R1

MINA GEOTHERMAL ENERGY


ASANO ENGINEERING

Document Title

Inspection and Test Plan

Wall Thickness Calculation


Pipeline Design Basis
Process Design Basis
Span and Expansion Loop Calculation
Stress Analysis and Flexibility Pipeline
Insulation Calculation
Analysis Support and Detail
Civil Design Basis
AMDAL, UKL & UPL

Procedure for Bore Pile


Procedure for Civil Work
Procedure for Fabrication and Erection (Construction and Repair)
Procedure for Lifting
Procedure for NDT (Non Destructive Testing)
Procedure for Blasting and Painting
Procedure for Flushing and Initial Service Testing
Procedure for Insulation
Procedure for Pre-Commissioning and Commissioning
Procedure for Operation and Maintenance

List
WPS and PQR
Welder List
Welder Certificate

Page 3
MDR PGE

ore Pile and Pedestal (Coordinat, Dimensional Check, Concrete Test)


Coordinate Report
Dimensional Check Report
Concrete Test Report

Material Report

Fit-Up and Welding Report


NDT Report (Pnetrant Test and Radiography Test)

Cleaning and Flushing Report


Pressure and Service Test Report
NDE Clearence
Drawing Test Block
Material and Welding Treacebility
Material Certificate
Line Check and Punch List Report

PFD Drawing Approval


P&ID Drawing Approval
Piping Layout Drawing Approval
Pipeline Alignment Sheet Drawing Approval
Isometric Drawing Approval (Spool and Welding Map)
Foundation Plan Drawing Approval
Plot Plan Drawing Approval
Standard Support Drawing Approval
Type Support and Detail Drawing Approval