PART MATERIAL DESCRIPTION SIZE ITEM CODE QTY. SPEC


No

FABRICATION MATERIALS
N
1 Pipe, BE, ASME-B36.10M, 150 PAAZZBOZZABAABSAAZZUS 39.2 M B01
A106-B, Seamless, S-40
2 45 degree elbow, long radius, 150 MBXZZBOZZAAEADCZZUS 2 B01
A , Beveled end, ASME-B16.9, A
A234-WPB, S-40
3 90 degree elbow, long radius, 150 MCMZZBOZZAAEADCZZUSA 2 B01
, Beveled end, ASME-B16.9,
A234-WPB, S-40
4 Weld neck flange, CL150, 150 FAAAHABZZAADABQZZUS 1 B01
Raised-face flanged end,
ASME-B16.5, A105, Undefined
PIPE SUPPORTS
5 Design Pipe Assembly 150 DesignPipeH_5 9 B01
ERECTION MATERIALS 1
SEE ISO 82
6 Spiral wound, one ring, CL150, 150 GMAHAQAABFMUS 1 B01 10END12BR002 SHT 02
4.5mm, ASME-B16.20, 316-W,
00
graph-F, CS-CR 40
7 Stud Bolt, ASME-B18.2.1, ASTM 3/4 BAZZZZZZAAYBFZZZUS 8 B01
A193-B7M (Hot Dip Galvanised),
B With 2 heavy Hex nuts A194
<5> 1 B
0 0 150DN
Gr.2H (Hot dip Galvanised) and 40
2 washers - 105 mm Length S5
10END12BQ009

00
40 S5
10END12BQ008
CONN TO
COTP-TERMINAL POINTS/TP 12
150 MM RFFE 150 00
E 248350 40 S5
N 226200 10END12BQ007
EL +535

F4 G6 B7 2
EL +1004 00 S5
40 10END12BQ006
95 33
C 95 50 C
95 3 30
<1> 1 66 26
150DN S5
473 <3 229 00
909 > 40 10END12BQ005
1

469
89 3
10 2
93 00
46 229 40 S5
9 10END12BQ004
<2> 1
95
45.0° 93
39 S5

<4> 1
10END12BQ003

312
770
D 1613 S5 D
10END12BQ002
229 S5
3 10END12BQ001
EL +234
229

E E
OWNER
5 34427 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS
4 312 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS DISTRIBUTION W/C
3 3026 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS MATRIX
2 473 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS
1 909 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS NOTES:- EPC
PIECE
NO
LENGTH
MM
SIZE
MM
END PREP END PREP ITEM CODE
1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
2. FINISHED GROUND LEVEL (FGL) OF PLANT IS (-)0.300 WHICH
CORRESPONDS TO MSL (+)8.50M
PESCO
3. FOR PAINTING & SURFACE PREPARATION DETAILS REFER "TECHNICAL
SPECIFICATION FOR PAITING" DOC NO. TCE.11191A-SP-3903 MAIN PLANT EQUIPMENT SUPPLIER
4. FOR INSULATION DETAILS REFER "TECHNICAL SPECIFICATION FOR
INSULATION" DOC NO. TCE.11191A-SP-3902
5. ALL ELEVATIONS INDICATED ARE CENTER LINE OF PIPES UNLESS
OTHERWISE NOTED. PROJECT NAME
6. SMALL BORE PIPING (DN 50 & BELOW) ARE FIELD RUN. ISOMETRICS
ISSUED FOR THE SAME IS INDICATIVE AND MAY BE ADJUSTED TO SUIT ADEN POWER PLANT - PHASE 1
F SITE CONDITIONS. F
DRAWING TITLE ISOMETRICS FOR LIGHT CRUDE OIL SYSTEM

10END12BR002 01 of 02
P&ID NO. TCE.11191A-D-4212 ENGINEERING JOB No. DRAWING NUMBER REV
PIPING LAYOUT DRAWING NO. TCE.11191A-D-4901 No. DATE REVISION DESCRIPTION BY CHK APPR Civil Mech Elect I/C PIP HSE PROS
11191A TCE.11191A-D-4914 P0
FILE NAME 10END12BR002.SHA DATE : DESIGNED : DRAWN : CHEF ENGR : TATA CONSULTING ENGINEERS LIMITED

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
PART MATERIAL DESCRIPTION SIZE ITEM CODE QTY. SPEC
No

FABRICATION MATERIALS
N
1 Pipe, BE, ASME-B36.10M, 150 PAAZZBOZZABAABSAAZZUS 39.4 M B01
A106-B, Seamless, S-40
2 Tee, , Beveled end, 150X150 MDJZZBOZZAAEADCZZUS 3 B01
A ASME-B16.9, A234-WPB, S-40 A
3 90 degree elbow, long radius, 150 MCMZZBOZZAAEADCZZUSA 1 B01
, Beveled end, ASME-B16.9,
A234-WPB, S-40 8 85
PIPE SUPPORTS 34 229
4 Design Pipe Assembly 150 DesignPipeH_5 8 B01
150DN 3 SEE SHT S4
10END12BR002 SHT 01
10END12BQ010
2
150X150DN
<1 N 216001
229 92 >
1 1
143
SEE ISO
10END13BR001 39
E 283235 52 91 S4
N 216001 84 10END12BQ011
EL +377
B B
143 S4
37
23 10END12BQ012
143

40
00
S4
10END12BQ014
40 SEE ISO
00 10END14BR001
17
50 E 283235
2 N 198499
EL +377
S4 50 MITRE 0.1°
00 <2
10END12BQ013 >
1 143
C C
2
49 150X150DN
3 S4
N 198499
10END12BQ015
143
S4
42 10END12BQ016
143 21
SEE ISO
10END12BR003
E 283235
50 N 180854
00 EL +234

2
17 150X150DN
50 MITRE 0.2°
2 N 180997
50
D 04 <3 D
>
1 143

S4 29
91
10END12BQ017

143
143
SEE ISO
10END15BR001
E 283235
N 180997
EL +377

E E
OWNER

DISTRIBUTION W/C
3 17216 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS MATRIX
2 17216 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS
1 4912 150 BEVEL BEVEL PAAZZBOZZABAABSAAZZUS NOTES:- EPC
PIECE
NO
LENGTH
MM
SIZE
MM
END PREP END PREP ITEM CODE
1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS
2. FINISHED GROUND LEVEL (FGL) OF PLANT IS (-)0.300 WHICH
CORRESPONDS TO MSL (+)8.50M
PESCO
3. FOR PAINTING & SURFACE PREPARATION DETAILS REFER "TECHNICAL
SPECIFICATION FOR PAITING" DOC NO. TCE.11191A-SP-3903 MAIN PLANT EQUIPMENT SUPPLIER
4. FOR INSULATION DETAILS REFER "TECHNICAL SPECIFICATION FOR
INSULATION" DOC NO. TCE.11191A-SP-3902
5. ALL ELEVATIONS INDICATED ARE CENTER LINE OF PIPES UNLESS
OTHERWISE NOTED. PROJECT NAME
6. SMALL BORE PIPING (DN 50 & BELOW) ARE FIELD RUN. ISOMETRICS
ISSUED FOR THE SAME IS INDICATIVE AND MAY BE ADJUSTED TO SUIT ADEN POWER PLANT - PHASE 1
F SITE CONDITIONS. F
DRAWING TITLE ISOMETRICS FOR LIGHT CRUDE OIL SYSTEM

10END12BR002 02 of 02
P&ID NO. TCE.11191A-D-4212 ENGINEERING JOB No. DRAWING NUMBER REV
PIPING LAYOUT DRAWING NO. TCE.11191A-D-4901 No. DATE REVISION DESCRIPTION BY CHK APPR Civil Mech Elect I/C PIP HSE PROS
11191A TCE.11191A-D-4914 P0
FILE NAME 10END12BR002.SHA DATE : DESIGNED : DRAWN : CHEF ENGR : TATA CONSULTING ENGINEERS LIMITED

1 2 3 4 5 6 7 8

Вам также может понравиться