CONSTRUCTION ENGINEERING MANAGEMENT

prevent unnecessary
investment in inventories.
Etymology
b) Manpower
 CONSTRUCTION – constructionem (L.) – putting - consists of putting the right
or placing together, a building number of right kind of people
 MANAGEMENT – manus (L.) – hand at the right place, right time,
- agere (L.) – to act doing the right things for
which they are suited for the
Definition achievement of goals of the
organization.
 involves the application of technical and scientific
- I love you.
knowledge to infrastructure construction projects.
c) Equipment
 fusion of civil engineering and construction
- identifying construction
management.
equipment for executing
 manage design, construction and operation of
project tasks, assessing
sustainable buildings and infrastructure systems in
equipment performance
the increasingly global construction industry.
capability, forecasting date
Construction Engineering Cycle wise requirement of number
and type of equipment.
1. Planning and Scheduling d) Pertinent Laws and
 initial stage in the construction engineering Regulations
cycle and the part where blueprint is - Project owners and builders
created. will need to obtain permits
 Construction planning is the fundamental from government to begin
and challenging activity in the construction. Failure to obtain
management and execution of a permit can result in fines,
construction projects. penalties, and demolition of
 involves identifying all the required steps to unauthorized construction if it
build a structure, splitting them into defined cannot be made to meet
activities, ordering these steps logically, code.
and determining the necessary materials, 2. Organization and Staffing
manpower, and equipment.  Organization - getting all the moving
 The following are procedure during this pieces in position to perform each task
stage:  Staffing – assigning people to duties
1.1 Project Site Analysis related to the project
- involves the evaluation of an  Organizational Chart – help the company
existing or potential site in hire and assign jobs and responsibilities
relation to the development 3. Contract Administration
program, environmental  involves making decision and the timely
impact, impacts on the flow of the completion of the project as
community and adjacent required by the contract documents
properties. including review and observation of the
1.2 Planning with reference to: construction project.
a) Materials
- ensures the supply of
required quantity and quality
of inventory at the required
time and at the same time
CONSTRUCTION ENGINEERING MANAGEMENT
4. Direction and Supervision 9. Project Completion and Acceptance
 Supervision – overseeing another person  the documentation required to close out
doing the work to ensure that they are the permit and receive a Certificate of
doing it and that the work is being done Completion varies depending on the
correctly to the required standard. infrastructure installed during construction.
- can also involve aiding or  Project Completion Stages:
assisting someone to develop a) Contract Closure
their skills and knowledge. b) Post-project Evaluation
 Directing – ensuring that a staff/employee c) Final Payments
complete tasks as planned d) Schedule and Budget Management
5. Project Reporting and Monitoring e) Customer Satisfaction
 Writing project reports for construction and f) Archiving of Document
engineering projects requires you to
consider the planning and building
methods employed in the completion of the
project.
 Construction monitoring - an accurate and
positive way of checking the quality,
accuracy, and progress of a construction
project.
6. Financial Management, Accounting, and Auditing
 Monitoring the company’s cash flow while
ensuring timely and accurate financial
reporting and making sure that the
company has established and maintains
an effective set of internal accounting
controls
 One of the reasons why you should marry
me; you’re gonna need me hehe.
7. Procurement
 process of purchasing goods or services.
 a method or system which seeks to weigh
the pros and cons and the financial
constraints which are likely to affect the
project.
 I told you.
8. Project Coordination/Control
 ensuring that all the works are completed
efficiently, with minimum disruption and in
compliance with quality and regulatory
standards by coordinating with other
project teams.