Вы находитесь на странице: 1из 4

Home » HOME » SOFTWARE » GRAPHIC SOFTWARE » GEOVIA Minex v6.5.293.

0
x64 Software Download

GEOVIA Minex v6.5.293.0 x64 Software


Download
Posted by: sh-admin in GRAPHIC SOFTWARE, HOME, SOFTWARE 0 785 Views

Keywords: 3D, GEOVIA Minex, Minex, Dassault Systemes, mine scheduling, mining,
CAD, engineering, modeling, mine, software, software engineering, software, mining,
professional, design, mine design, mine planning, Mynks, Maynks, download software and
open pit design, mine planning software download, download software planning, mining,
geology, mining geology, download specialized software engineering, mine, mine production
scheduling, download Maynsayt, download Mykrvmayn, download GEOVIA Minex

Mining operations, including projects that need to spend money, time and extensive resources
to achieve the best and most favorable results and the process is so painstaking and difficult
career, including 10 engineering and mining professionals known in the world hard be.
Because of this sensitivity and hard work of engineers and researchers in this field to
software and specialized resources to manage and improve your performance needs.
GEOVIA Minex one of the best and most well-known applications in the field of geology
and planning, and mining operations and especially coal mining projects is extensive and
special tools for resource management and project process puts at the disposal of its users.
Using this software, you can simulate a variety of geological structure and manage all aspects
of the operation of mines.

A key feature of the software GEOVIA Minex:


– Advanced and powerful 3D modeling environment
– Modeling triangular facets and network and calculate the volume
– Ability to build and calculate data point and linear
– Loading boreholes files ASCII, ODBC and acQuire
– Advanced tools for modeling fault
– Process management and transportation of waste disposal
– Use of standard algorithms for the simulation Grossman holes and cavities
– Careful management of resources and time spent for project
– Create a detailed plan for underground and surface mines
– And …

Minex is the recognized world leader of integrated geology and mine planning solutions for
coal and other stratified deposits. Minex ensures resources are evaluated accurately and
mined efficiently from exploration to rehabilitation. As a single integrated solution, data and
skills can be readily moved between teams at significant time and cost savings.

Here are some key features of “Minex”:


Graphics: Sophisticated and powerful 3D modelling environment.
Plotting: Create, preview, annotate and print user-defined plan and section plots from grids,
triangles and boreholes.
Surface Modelling: Create triangles and grids and calculate volumes.
CAD Tools: Create and work with point and line data.
Seam Modelling: Load boreholes from ASCII, ODBC or acQuire ™. Interpolate missing data
and automatic generation of multiple seam grids. Resource classification and calculations
(quality, depth, thickness and distance).
Coal Washability: Store coal wash data based on wash density and particle sizing.
Accumulate data
Fault Modelling: Comprehensive fault modelling tool that handles reverse and normal
faulting.
Dump Scheduling and Haulage Planning: Design waste dumps and haul roads, schedule the
dumping of waste, calculate haulage cycle times, and report on all aspects of the waste
removal and haulage process.
Reserves: Design pits with strip and block divisions and generate reserves from a seam
model. Adjust the reserves for mining dilution, seam combining and seam wasting by
thickness.
Pit Optimizer: Use industry standard Lerchs Grossmann algorithm to generate optimum pits
from an unfaulted or faulted Minex geological model.
Open Pit Drill and Blast: Layout blasthole patterns.
Open Pit Surveying: Connect to survey instruments to collect and manage topography data.
Open Pit Earth Works: Design dumps and roads and rehabilitate dumps using cross sections.
Spoil Reshaper: Reshape dump surfaces to minimize dozer push distance.
Open Pit Scheduling: Schedule an open pit mine using simple targeting or detailed equipment
scheduling.
Underground Engineering: Create detailed underground mine designs and schedule using a
set of rich and interactive tools that provide instant visualization of your design as it unfolds.
Enhanced underground mine scheduling using a set of tools that are integrated with the mine
design and reserves database.

More info (open / close)

required system
Operating System: Microsoft Windows 10 (64-bit version), Microsoft Windows 8.1 (32-bit
and 64-bit versions), Microsoft Windows 7 (32-bit and 64-bit versions)
Microsoft Office: Microsoft Office 2013 and Microsoft Office 2016
Memory: Minimum 4GB RAM recommended
Processor: Intel Core i5 2.3Ghz quad core or higher
Disk Drives:
HDD 80GB or higher
DVD drive required for DVD installation
Graphics Adaptor:
High-end OpenGL card with minimum of 512MB dedicated memory, version 1.2 or greater
nVidia GeForce and nVidia Quadro Series (high-end models) or equivalent cards
Monitor:
19-23 “LED wide aspect flat panel Or 19-23” LED flat panel high resolution (minimum 1280
x 1024)
Network: Standard 100/1000 Mbps
Plotter: Any Windows supported device that supports LPD
USB Ports: 2 to 4 USB 2.0 ports

Specifications

Manufacturer: Dassault Systemes


File size: 572.03 MB
Published: 13:00 – 95/7/9
Source: PC Download
Points:

Installation guide

1. Install the software.


2. Do not run the software and if next time the state was running close it.
3. Patch folder contents in place, install software, copy files, execute Patch.exe * Patch
operations do. (Note: If you use Windows 7, 8, or 10 Patch.exe would have to run on it, right
click and select Run as administrator Patch to work correctly)
4. Run the application.

* Software installation folder is installed, usually drive in Windows and Program Files folder
is located. Also, this method can not find the installation location:
– In Windows XP: After the installation, right-click on the Shortcut application on the Start
menu and click Properties and then click on Find Target option.
– In Windows 7: After the installation, right-click on the Shortcut Software and click on the
Start menu, click Open file location.
– In Windows 8: After the installation, right-click on the Start Screen Shortcut Software
screen and click on Open file location options, in the lightweight window that opens, right-
click again on the Shortcut Software and click Open file location click.
– In Windows 10: After the installation, right-click on the Shortcut application on the Start
menu and click on Open file location options, in the lightweight window that opens, right-
click again on the Shortcut Software and click on Open file location options do.

download links
Size: 572.03 MB
Download – Part One
Download – Part II

Download crack (alone)

File Password

www.p30download.com
Click here to get File Password

Recent search terms:

 geovia download
 minex full crack
 minimum spec computer to run geovia minex

Вам также может понравиться