KHURAIS AL CRUDE INCREMENT-300MBCD


MCC

RESIDENTIAL & INDUSTRIAL COMPLEX

BI-10-01506
ISSUED FOR CONSTRUCTION
DESCRIPTION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL


BUILDINGS AT RIC - KHURAIS

TECHNICAL SPECIFICATION FOR


JO/EWO
10-01506-
0007 06/26/16
DATE

FIRE WATER SYSTEMS


NO.
REV

00

DISCIPLINE
ENGINEER
MARTE COMETA

DATE:
06/26/16
PROJECT
ENGINEER
GEORGE JACOB

DATE:
CERTIFIED
06/26/16
ISSUED FOR CONSTRUCTION
GEORGE JACOB

06/26/16
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL

06/26/16
JUNE 2016
DATE:
OPERATIONS
AYMAN ABDULLATIF AL-NAMI

DATE:
06/26/16
CONTROL NUMBER
VERIFICATION

PREPARED BY:
EDSD

MUSTANG-HDP
DATE:

Al-Khobar, Saudi Arabia


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. 10-01506-0007-001


_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 1
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB

TABLE OF CONTENTS
ENGG CERT

Title Sheet No.


GJB
MCC

1.0 GENERAL ....................................................................................................................................................... 3


1.1 Description of Work .......................................................................................................................................... 3
1.2 Submittals .......................................................................................................................................................... 3
1.3 Quality Assurance ............................................................................................................................................. 5
1.4 Project Conditions ............................................................................................................................................. 6
ISSUED FOR CONSTRUCTION

2.0 DRAWINGS .................................................................................................................................................... 6


2.1 Project Drawings ............................................................................................................................................... 6
DESCRIPTION

3.0 PRODUCTS ..................................................................................................................................................... 6


3.1 General .............................................................................................................................................................. 6
3.2 Underground Piping Material ............................................................................................................................ 7
3.3 Aboveground Piping Material ........................................................................................................................... 7
3.4 Piping Specialties .............................................................................................................................................. 8
3.5 Sprinkler System: .............................................................................................................................................. 8
3.6 Fire Extinguishers: .......................................................................................................................................... 11
3.7 Fire Hydrant – UL 264 .................................................................................................................................... 11
3.8 Post Indicator Valve ........................................................................................................................................ 11
4.0 EXECUTION ................................................................................................................................................. 12
JO/EWO
10-01506-
0007

4.1 General ............................................................................................................................................................ 12


4.2 Examination .................................................................................................................................................... 12
06/26/16
DATE

4.3 Piping Installation............................................................................................................................................ 12


4.4 Post Indicator Valve Installation ..................................................................................................................... 13
4.5 Fire Hydrant Installation ................................................................................................................................. 13
NO.
REV

00

4.6 Connections ..................................................................................................................................................... 13


DISCIPLINE 4.7 Labeling and Identification.............................................................................................................................. 14
ENGINEER
MARTE COMETA 4.8 Field Quality Control....................................................................................................................................... 14
DATE: 06/26/16
4.9 Cleaning and Protection .................................................................................................................................. 14
PROJECT 4.10 Field Painting ................................................................................................................................................ 14
ENGINEER
GEORGE JACOB
4.11 Inspection and Testing .................................................................................................................................. 14
4.12 Demonstration ............................................................................................................................................... 15
06/26/16
DATE:
CERTIFIED
GEORGE JACOB

06/26/16
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL

DATE:
06/26/16
OPERATIONS
AYMAN ABDULLATIF AL-NAMI

DATE:
06/26/16
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. 10-01506-0007-001


_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 2
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB

1.0 GENERAL
ENGG CERT
GJB

1.1 Description of Work


MCC

A. Provide all labor, material, tools, and equipment; fabricate, furnish and
install all fire protection systems complete and in place, including all
associated hardware as specified herein, and as indicated on drawings for
a complete and proper installation. Items required for this work include, but
are not necessarily limited to:
ISSUED FOR CONSTRUCTION
DESCRIPTION

1. Installation of combined firewater and raw water mains.

2. Automatic wet fire sprinkler system where indicated on drawings.

3. Sprinkler, heads, risers, valves, fire department connections, and


accessories.

4. Wet barrel fire hydrant.

5. Preparations of complete shop drawings for the entire protection systems


JO/EWO
10-01506-

and approvals.
0007

6. All required patent rights satisfaction; and inspections.


06/26/16
DATE

7. Connection to site fire and raw water main at designated locations outside
NO.
REV

the building.
00

DISCIPLINE
ENGINEER
MARTE COMETA 8. Protection of materials and protective coatings.
DATE: 06/26/16
PROJECT 9. Cleaning, testing, and adjusting.
ENGINEER
GEORGE JACOB
06/26/16
10. Record Drawings of work installed.
DATE:
CERTIFIED
GEORGE JACOB

06/26/16
1.2 Submittals
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
A. General: In compliance with Saudi Aramco Requirements, submit
06/26/16
followings items for Company Representative’s review and
DATE:
OPERATIONS
approval.
AYMAN ABDULLATIF AL-NAMI

B. Manufacturer’s Data:
DATE:
06/26/16
CONTROL NUMBER

1. Complete material list of items proposed to be furnished and installed under


VERIFICATION

this Specification.
EDSD

2. Manufacturer’s specifications and other data required to demonstrate


DATE:
BY:

compliance with the specified requirements including: catalog numbers,


REVISIONCERTIFICATION

trade names, illustrations, and descriptive data for each article proposed. All
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

pertinent data for each article shall be underlined in each copy of each
00

catalog or brochure in which it is described. Data shall include valves,


(DCC) NO. 10-01506-0007-001
_____________________

gauges, risers, trim, sprinkler heads, and auxiliary equipment.

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 3
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB

3. Names and addresses of the service and maintenance organizations


nearest the WORK Sites that readily stocks repair parts.
ENGG CERT
GJB

4. Manufacturer’s recommended installation procedures which, when approved


MCC

by SAUDI ARAMCO, shall become the basis for inspecting and accepting or
rejecting actual installation procedures used on the work.

5. All fire protection equipment shall be approved from FrPD. Fire protection
equipment shall be from regulated vendor list which is available in SAES-U-
ISSUED FOR CONSTRUCTION

101. In case the equipment are not listed in the SAES-U-101, then separate
submittal material shall be submitted to FrPD for approval purpose.
DESCRIPTION

6. All fire protection equipment shall be listed for its intended use and
application.

C. Fire Systems Shop Drawings:

Submit complete and accurate construction shop drawings, to scale, of all


fire systems, as follows:

1. Dimensioned locations of fire and raw water mains and fire hydrant locations
JO/EWO
10-01506-

in accordance with NFPA 24.


0007 06/26/16

2. Dimensioned locations of sprinkler piping and sprinkler heads.


DATE

3. Firewater riser assembly details and locations.


NO.
REV

00

DISCIPLINE 4. Valves, gauges, trim, and other required parts.


ENGINEER
MARTE COMETA

DATE: 06/26/16
5. Hangers and equipment supports.
PROJECT
ENGINEER
GEORGE JACOB
6. Working drawings for the entire sprinkler installation in accordance with
06/26/16
NFPA 13 and NFPA 13R.
DATE:
CERTIFIED
GEORGE JACOB 7. Verify job conditions by examining all contract documents so as to be fully
06/26/16 aware of all work required under this Specification, and examine the work of
DATE:
CONSTRUCTION
other Divisions or Sections for interferences and conditions affecting the
AGENCY
ALI HASSAN AL-BAGGAL
work of this Specification.
06/26/16
DATE: 8. Drawings shall show other major piping, ductwork, lighting fixtures, structural
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
elements, and equipment that shall be coordinated with the fire system(s)
arrangement(s).
DATE:
06/26/16
CONTROL NUMBER

9. Coordinate locations of all exposed piping and sprinkler heads other


VERIFICATION

elements of the building. Do not locate piping and heads directly under light
EDSD

fixtures. Arrange piping to maintain headroom and conceal all piping in


areas with ceilings.
DATE:
BY:

10. System hydraulic calculations shall be included with the shop drawing
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

submittals.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. 10-01506-0007-001


_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 4
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.3 Quality Assurance
AHB

A. Industry Codes and Standards: Comply with all applicable codes and standards
ENGG CERT
GJB

including, but not limited to, those listed below:


MCC

1. Saudi Aramco Engineering Procedures (SAEP)

SAEP-1154 Guidelines for Contractor's Quality Plan


ISSUED FOR CONSTRUCTION

2. Saudi Aramco Engineering Standards (SAES)


DESCRIPTION

SAES-M-100 Saudi Aramco Building Code

SAES-S-050 Sprinkler and Standpipe Systems in Buildings

SAES-U-101 Regulated Vendors List for Fire Protection


Equipment

3. International Codes and Standard


JO/EWO
10-01506-

NFPA 10 Standard for Portable Fire Extinguishers


0007

NFPA 13 Installations of Sprinkler Systems


06/26/16
DATE

NFPA 13R Standard for Installation of Sprinkler Systems


NO.
REV

00

in Low-Rise Residential Occupancies


DISCIPLINE
ENGINEER
MARTE COMETA NFPA 20 Standard for the Installation of Stationary
DATE: 06/26/16 Pumps for Fire Protection
PROJECT
ENGINEER
GEORGE JACOB NFPA 22 Standard for Water Tanks for Private Fire
DATE:
06/26/16 Protection
CERTIFIED
GEORGE JACOB
NFPA 24 Standards for the Installation of Private
06/26/16 Service Mains and Their Appurtenances
DATE:
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
NFPA 291 Recommended Practice for Fire Flow Testing
DATE:
06/26/16 and Marking of Hydrants
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
ANSI American National Standards Institute, INC.
DATE:
06/26/16
ASME American Society of Mechanical Engineers
CONTROL NUMBER
VERIFICATION
EDSD

ASTM American Society for Testing and Materials


DATE:
BY:

IFC International Fire Code 2009 Edition


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

IBC International Building Code 2009 Edition


00

(DCC) NO. 10-01506-0007-001


_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 5
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. General Instructions & Miscellaneous Standards
AHB

G.I.2.100 Work Permit System


ENGG CERT
GJB

G.I.2.102 Pressure Testing Safety


MCC

G.I.2.102.1 Check List for Pressure Testing Safety

G.I.1781.001 Testing Inspection and Maintenance of Fixed


Fire Protection Systems
ISSUED FOR CONSTRUCTION

SAEP-1023 Contractor Quality Assurance and Quality


DESCRIPTION

Control Requirements

SAUDI ARAMCO Construction Safety Manual

B. Piping material shall bear label, stamp, or other markings of special testing agency.

C. Comply with FMG’s “Approval Guide” or UL’s “Fire Protection Equipment Directory”
for fire service main products.
JO/EWO
10-01506-
0007

1.4 Project Conditions


06/26/16
DATE

A. Field Measurements: Verify existing condition and dimensions prior to commence


NO.
REV

00

the work.
DISCIPLINE
ENGINEER
MARTE COMETA

DATE: 06/26/16
2.0 DRAWINGS
PROJECT
ENGINEER
GEORGE JACOB 2.1 Project Drawings
06/26/16
DATE:
CERTIFIED All the project drawings are listed on the drawing control sheet DD-178177. The
GEORGE JACOB
Contractor shall refer to Construction Scope of Work DE-178178 for understanding
DATE:
06/26/16 and execution of work as per this and Construction Specifications. The Contractor
CONSTRUCTION
AGENCY
shall refer & construct in conformance to the IFC drawings and documents.
ALI HASSAN AL-BAGGAL

DATE:
06/26/16
OPERATIONS 3.0 PRODUCTS
AYMAN ABDULLATIF AL-NAMI

DATE:
06/26/16 3.1 General
CONTROL NUMBER
VERIFICATION

A. All products shall be delivered in manufacturer's original, protective packaging.


EDSD

B. All products shall be inspected at time of delivery for damage and for compliance
DATE:
BY:

with specifications.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

C. Any products that are damaged or found not to be in accordance with the
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

specifications shall be immediately repaired or replaced.


(DCC) NO. 10-01506-0007-001
_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 6
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D. All products shall be handled and stored as recommended by the manufacturer to
AHB

prevent damage and deterioration.


ENGG CERT
GJB

E. Pipes, fittings, valves, fire hydrants and fire hose reels shall be stored with ends
sealed until ready for installation.
MCC

F. All other materials used which have not been specified by SAUDI ARAMCO, must
be approved by SAUDI ARAMCO Representative prior to use.

G. All the Fire Protection Sub Systems shall be supplied as Packages to avoid
ISSUED FOR CONSTRUCTION

incompatibility risks.
DESCRIPTION

H. List of Materials or Material Take-Off sheets are prepared for the project and are
included in the design package for reference only and the items or quantities listed
therein are not exact. Exact quantities will be provided by the Contractor to
complete the work. The fact that one or more items are not listed in the take-off
lists or if the quantities are not exactly listed does not relieve the contractor of his
responsibility to provide all necessary material to complete the project without any
extra cost to Saudi Aramco. Wherever the material specifications in Construction
specifications and the material take-off list do not match, the construction
specifications shall be considered correct over the material take-off lists.
JO/EWO
10-01506-
0007

3.2 Underground Piping Material


06/26/16
DATE

All non-metallic underground pipes and pipe fittings shall be Reinforced


Thermosetting Resin (RTR). All metallic underground pipes like sprinkler risers
NO.
REV

00

shall be ASTM A106 or API 5L Grade B carbon steel, 2” and larger shall be
DISCIPLINE externally and internally coated with fusion bonded epoxy (FBE).
ENGINEER
MARTE COMETA

DATE: 06/26/16
3.3 Aboveground Piping Material
PROJECT
ENGINEER
GEORGE JACOB A. Pipes
06/26/16
DATE:
CERTIFIED 1. Piping Material Specification for above ground fire water mains and risers
GEORGE JACOB
shall be fusion bonded epoxy (FBE) carbon steel.
06/26/16
DATE:
CONSTRUCTION
AGENCY
2. For above ground pipes intended for Sprinkler systems, pipes shall be in
ALI HASSAN AL-BAGGAL
accordance with NFPA 13 Table 6.3.1.1, NFPA 13R Table 5.2.1 and SAES-
DATE:
06/26/16 S-050.
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
a. Steel Pipe: ASTM A53 for Sprinkler System piping below 8” and API
DATE:
06/26/16 STD 5L Grade B for 8” and above. Sprinkler System piping shall be
Schedule 40 Galvanized Steel Pipe.
CONTROL NUMBER
VERIFICATION
EDSD

B. Fittings
DATE:
BY:

1. For above ground pipe fittings intended for Sprinkler systems, pipefittings
shall be in accordance with NFPA 13 Table 6.4.1, NFPA 13R Table 5.2.9
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

and SAES-S-050.
BY DRAWING COMPLETION CERTIFICATE
00

(DCC) NO. 10-01506-0007-001


_____________________

a. Steel Fittings: ASME B16.9 wrought steel, butt welded, ASME B16.25

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 7
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
butt weld ends, ASTM A234 wrought carbon steel and alloy steel,
AHB

ASME B16.5 steel flanges and fittings, ASME B16.11 forged steel
socket welded and threaded.
ENGG CERT
GJB

b. Cast Iron Fittings: ASME B16.1.


c. Malleable Iron Fittings: ASME B16.3, screwed type. ASTM A47.
MCC

3.4 Piping Specialties

A. Transition Fittings: Manufactured fitting or coupling same size as, with pressure
rating at least equal to and ends compatible with, piping to be joined.
ISSUED FOR CONSTRUCTION

B. Dissimilar metals shall be electrically insulated from each other.


DESCRIPTION

3.5 Sprinkler System:

A. Sprinkler Heads

1. Provide concealed chrome-plated spray type pendent sprinkler heads with


escutcheons in all areas with false ceilings. Escutcheons shall match the
ceiling color, and shall be flush with false ceiling.
JO/EWO
10-01506-

2. Provide rough brass upright heads in all areas without ceilings.


0007

3. Pendent type, actuated by heat response element ½” orifice size ½” NPT


06/26/16
DATE

brass polished chrome. 154oF temperature rating corrosion resistance lead


coating, Standard Spray, Quick response, UL, FM approved.
NO.
REV

00

DISCIPLINE
ENGINEER
4. Pendent type, actuated by heat response element ½” orifice size ½” NPT
MARTE COMETA brass polished chrome. 175oF temperature rating corrosion resistance lead
DATE: 06/26/16 coating, Standard Spray, Quick response, UL, FM approved.
PROJECT
ENGINEER
GEORGE JACOB 5. Upright type, actuated by heat response element ½” orifice size ½” NPT
DATE:
06/26/16 brass polished chrome. 154oF temperature rating corrosion resistance lead
CERTIFIED coating, Standard Spray, Quick response, UL, FM approved.
GEORGE JACOB

06/26/16
DATE: 6. Upright type, actuated by heat response element ½” orifice size ½” NPT
CONSTRUCTION
AGENCY
brass polished chrome. 175oF temperature rating corrosion resistance lead
ALI HASSAN AL-BAGGAL
coating, Standard Spray, Quick response, UL, FM approved.
DATE:
06/26/16
OPERATIONS 7. Side-wall type, actuated by heat response element ½” orifice size ½” NPT
AYMAN ABDULLATIF AL-NAMI
brass polished chrome. 154oF temperature rating corrosion resistance lead
DATE:
06/26/16 coating, Extended Spray with a minimum coverage of 4.9 meters x 4.9
meters, Quick response, UL, FM approved.
CONTROL NUMBER
VERIFICATION
EDSD

8. Provide approved type guards where heads are installed in locations where
damage to head is likely to occur, and in all locations where heads are
DATE:
BY:

within 7'-6" of floor.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

9. All sprinklers shall be FrPD approved type as per SAES-U-101.


00

(DCC) NO. 10-01506-0007-001


_____________________

10. Install, at each riser, a locked metal cabinet containing 6 spare sprinklers or

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 8
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
more depending on the total quantity of sprinklers as stated on NFPA-13
AHB

Sec. 6.2.9.5, and a sprinkler wrench for replacement purposes. Include


proportionate numbers of the various types and temperature ratings used in
ENGG CERT
GJB

the associated systems.


MCC

The stock of spare sprinklers shall include all types and ratings installed
and shall be as follows:
a. For protected facilities having under 300 sprinklers—no
fewer than six sprinklers of each type.
ISSUED FOR CONSTRUCTION

b. For protected facilities having 300 to 1000 sprinklers — no


fewer than 12 sprinklers of each type.
DESCRIPTION

c. For protected facilities having over 1000 sprinklers — no


fewer than 24 sprinklers of each type.

11. All sprinklers shall be permanently marked with one or two English
uppercase alphabetic characters to identify the manufacturer, immediately
followed by three or four numbers, to uniquely identify a sprinkler as to K-
factor or orifice shape, deflector characteristic, pressure rating, and thermal
sensitivity.
JO/EWO
10-01506-

Sprinklers identification for areas with exposed pipe shall have SSU
0007

lettering and sprinklers for areas with unexposed pipe (suspended ceiling)
shall have SSP letting with double escutcheon plate.
06/26/16
DATE

B. Piping and Fittings


NO.
REV

00

DISCIPLINE
ENGINEER
Refer to Section 4.3 of this for Specification.
MARTE COMETA

DATE: 06/26/16 1. Provide sleeves at all points where piping passes through walls and floors.
PROJECT
ENGINEER Space between pipe and sleeves shall be filled with Teflon rope or glass
GEORGE JACOB fiber material to avoid sound transmission and chrome-plated escutcheons
DATE:
06/26/16 shall be provided at floor and on each side of wall.
CERTIFIED
GEORGE JACOB
2. Connect to site fire protection main at designated tie-in points outside of
06/26/16
DATE: building. Extend through foundation wall and up through building at least 6”
CONSTRUCTION
AGENCY above floor. Provide adapter as required between two different materials.
ALI HASSAN AL-BAGGAL

DATE:
06/26/16 C. Risers:
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
Each riser shall include the following:
DATE:
06/26/16
CONTROL NUMBER

1. Gate valve shutoff; UL approved, 175 psi cold water, IBBM, flat-faced
VERIFICATION

flange, solid wedge disk, OS&Y.


EDSD

2. Fire department Siamese connection equal to Elkhart No. 166 polished


DATE:
BY:

chrome or brass, as selected, with 4” check valve and automatic ball drip.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

3. Approved alarm check valve, for wet type sprinkler system complete with
00

(DCC) NO. 10-01506-0007-001


_____________________

surge chamber, pressure gauges, test piping, main drain piping, tappings
for alarms, retard chamber and exterior mounted water motor gong alarms.

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 9
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB

D. Water Motor Alarms:


ENGG CERT
GJB

Water motor alarm shall be of the approved weatherproof and guarded type, to
sound locally on the flow of water in each sprinkler system to which it is connected.
MCC

Alarms shall be mounted on the outside of the outlet walls of each building, at a
location shown on the drawings as directed by SAUDI ARAMCO.
E. Pressure Switch:

Pressure switches with circuit opener or closer shall be provided for the automatic
ISSUED FOR CONSTRUCTION

transmittal of an alarm over the facility fire alarm system and connected into the fire
alarm system. Alarm actuating device shall be of the mechanical diaphragm
DESCRIPTION

controlled water pressure type with retard device adjustable from 10 to 60 seconds
and shall be of a type which instantly recycles when the pressure is released on
the diaphragm.

F. Tamper Switch:

Tamper proof switch shall be single pole, double throw cast aluminum type, rated
for use on OS&Y gate valve. All parts shall be non-ferrous and it shall be rated for
15 amps at 125/250 VAC.
JO/EWO
10-01506-
0007

G. Flow Switch:
06/26/16
DATE

Flow switch shall be dual type, rated for service in water flow signaling of fire
extinguishing systems. It shall operate under a rated pressure of 300 psi with 1-5
NO.
REV

00

psi differential operation and 2-20 psi adjustment range. Switch shall have two
DISCIPLINE
ENGINEER
single pole double throw snap action.
MARTE COMETA

DATE: 06/26/16 H. Valves:


PROJECT
ENGINEER
GEORGE JACOB Valves shall be provided as required by NFPA 13 & NFPA 13R and of types
DATE:
06/26/16 approved for fire services. Gate valves shall be flanged clear opening switch
CERTIFIED check type with flanged inspection and access cover plate for sizes 100 mm (4
GEORGE JACOB
inches) and larger. An OS&Y valve shall be provided beneath each alarm valve in
06/26/16
DATE: each riser when more than one alarm valve is supplied from the same water supply
CONSTRUCTION
AGENCY pipe.
ALI HASSAN AL-BAGGAL

DATE:
06/26/16 I. Universal spanner wrench # T-464
OPERATIONS Escutcheon plate #589 either 1.5” or 2.5”
AYMAN ABDULLATIF AL-NAMI
1/2” sprinkler head, brass, pendent UL/FM
DATE:
06/26/16
CONTROL NUMBER

J. Identification Signs:
VERIFICATION
EDSD

Properly lettered approved metal signs conforming to NFPA 13 and shall be


attached to each valve and alarm device.
DATE:
BY:
REVISIONCERTIFICATION

Hydraulic design data nameplates shall be permanently affixed to the riser of each
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

system.
00

(DCC) NO. 10-01506-0007-001


_____________________

K. Inspector’s test and drain valve positive positioning of handle for off, test or drain.
TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 10
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Integral sight glass, U.L. listed and ULC approved. May be installed horizontally or
AHB

vertically 1” or 1½ “ NPT size.


ENGG CERT
GJB

L. Main Drains:
MCC

Drain shall be provided on the ground floor as shown on the drawings. Provide a
gate valve and a pipe cap at the lowest end of the pipe.

M. Pipe Hangers:
ISSUED FOR CONSTRUCTION

Pipe hanger shall conform to NFPA 13 and NFPA 13R


DESCRIPTION

3.6 Fire Extinguishers:

A. FE-1: Portable Carbon Dioxide Type (CO2), 10 lbs., for Class B & C (10-B:C). As
per 9 COM 6000001302.

B. FE-2: Portable Pressurized ABC Multi-purpose Dry Chemical, 10 lbs., for Class A,
B & C (4A, 80B:C). As per 9 COM 6000001302.
JO/EWO
10-01506-

C. FE-3: Hand Type ABC Cartridge Multi-purpose Dry Chemical, 25 lbs., for Class A,
0007

B & C (10A, 80B:C). As per 9 COM 6000001302.


06/26/16
DATE

D. FE-6: Hand Type Class K Kitchen Extinguisher, 2.5 gallons, for class A & K (2
A:K). As per 9 COM 6000001302.
NO.
REV

00

DISCIPLINE
ENGINEER
MARTE COMETA 3.7 Fire Hydrant – UL 264
DATE: 06/26/16
PROJECT
ENGINEER
A. Fire Hydrant shall be Wet Barrel Type, as per 9 COM 6000001310; Fire Hydrant
GEORGE JACOB shall meet or exceeds the requirement of AWWA C503. The outlet configuration
06/26/16
DATE: shall include 2 nos. 2-1/2 inch NH standard threads hose nozzle and 1 no. 5 inch
CERTIFIED
GEORGE JACOB storz pumper connection. Fire Hydrant body shall be single casted ductile iron to
06/26/16 ASTM A536 and bronze stem. Inside coating shall be wet epoxy and outside
DATE:
CONSTRUCTION coating shall be fbe polyester. End connection shall be 6 inch flanged to ASME
AGENCY
ALI HASSAN AL-BAGGAL
B16.5. Fire Hydrant shall be rated for 200psi working pressure. Fire hydrant shall
DATE:
06/26/16 be UL listed and FM approved.
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
B. Manufacturers
DATE:
06/26/16
CONTROL NUMBER

1. As per SAES-U-101
VERIFICATION
EDSD

3.8 Post Indicator Valve


DATE:
BY:

A. Gate Valve – UL 262 (Non Rising type)


REVISIONCERTIFICATION

Gate valve shall be Non-rising type as per 9COM 6000001380; Iron body bronze
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

mounted, bolted bonnet, non-rising stem. Valve shall be FBE coated internally and
00

(DCC) NO. 10-01506-0007-001


_____________________

externally. Pressure Rating 250 PSI. End connection shall be flanged to ASME

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 11
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B16.5. Gate Valve shall be UL listed and FM approved.
AHB
ENGG CERT

B. Indicator Post – UL 789


GJB

Upright Indicator Posts for use with non-rising stem indicator post style valve.
Indicator Post shall be UL listed and FM approved.
MCC

C. Manufacturers
ISSUED FOR CONSTRUCTION

1. As per SAES-U-101
DESCRIPTION

4.0 EXECUTION

4.1 General

A. All pipe-work installations shall be in accordance with applicable codes and


standards, section, manufacturer's written instructions and SAUDI ARAMCO
Representatives approval.

B. Examine the areas and conditions under which work of this Section shall be
performed. Correct conditions detrimental to the proper and timely completion of
JO/EWO
10-01506-

the work. Do not proceed until unsatisfactory conditions have been correct.
0007 06/26/16

C. Lay out work to avoid obstruction with all existing services. Fire Hydrant, Post
DATE

Indicator Valve and Fire Hose Reel locations to be verified before installing, using
existing utility plans and sections.
NO.
REV

00

DISCIPLINE
ENGINEER D. Avoid interference with structure and the work of other trades. Do not make
MARTE COMETA
changes from approved drawings unless acceptable to SAUDI ARAMCO.
DATE: 06/26/16
PROJECT
ENGINEER E. Install piping so as to allow complete drainage of each system. Provide drain and
GEORGE JACOB test connections as required.
06/26/16
DATE:
CERTIFIED
GEORGE JACOB
F. Fire water network with associated equipments shall be installed by a qualified
installer specializing in installation of fire protection specialties. The installer shall
06/26/16
DATE:
have been qualified for at least 5 years in the installation of fire protection systems.
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL

4.2 Examination
DATE:
06/26/16
OPERATIONS
AYMAN ABDULLATIF AL-NAMI
A. Contractor shall field verify site condition and dimensions before starting any work.
06/26/16
DATE: B. Proceed with installation only after unsatisfactory conditions have been corrected.
CONTROL NUMBER
VERIFICATION

4.3 Piping Installation


EDSD

DATE:

A. Locations and Arrangements: Layout plans and Isometrics indicates general


BY:

arrangement of piping. Install piping as indicated, as far as possible.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B. Install piping indicated to be exposed. Diagonal runs are prohibited unless


00

(DCC) NO. 10-01506-0007-001


_____________________

specifically indicated otherwise.

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 12
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
C. Use approved fittings to make changes in direction, branch take-offs from mains,
AHB

and reduction in pipe sizes.


ENGG CERT
GJB

D. Install piping free of sags and bends.


MCC

E. Select system components with pressure rating equal to or greater than system
operating pressure.

F. Install sleeves for pipes passing through concrete and masonry walls and concrete
floor.
ISSUED FOR CONSTRUCTION

G. Verify final equipment locations for roughing-in.


DESCRIPTION

H. Install unions adjacent to each valve in pipes NPS 2 and smaller. Unions are not
required on flanged device or in piping installations using grooved joints.

I. Install flanges or flange adapters on valves, apparatus, and equipment having NPS
2-1/2 and larger connections.

J. The entire piping system shall be flushed to remove all foreign matter from the
system.
JO/EWO
10-01506-
0007

4.4 Post Indicator Valve Installation


06/26/16
DATE

A. Install listed fire-protection valves, unlisted general-duty valves, and trim controls,
and specialties according to NFPA and Saudi Aramco FrPD Requirements.
NO.
REV

00

DISCIPLINE
ENGINEER
B. Post indicator valve shall be clearly marked and labeled. Install permanent
MARTE COMETA identification signs for each valve.
DATE: 06/26/16
PROJECT
ENGINEER
C. Install protective bollards as indicated on the drawings around the post indicator
GEORGE JACOB valve.
06/26/16
DATE:
CERTIFIED
GEORGE JACOB
4.5 Fire Hydrant Installation
06/26/16
DATE:
CONSTRUCTION
AGENCY
A. Install fire hydrant in compliance with SAES-M-100 and NFPA 24.
ALI HASSAN AL-BAGGAL

DATE:
06/26/16 B. Install each fire hydrant anchor with restrained joints or thrust blocks, and support
OPERATIONS in upright position.
AYMAN ABDULLATIF AL-NAMI

DATE:
06/26/16 C. Install protective guard rails around the fire hydrant as indicated on the relevant
drawings.
CONTROL NUMBER
VERIFICATION
EDSD

D. Install fire hydrant in such a way that pumper connection should face the main road
for easy access to fire engine.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.6 Connections
00

(DCC) NO. 10-01506-0007-001


_____________________

A. Install piping adjacent to equipment to allow service and maintenance.

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 13
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AHB

4.7 Labeling and Identification


ENGG CERT
GJB

A. Install labeling and pipe markers on equipment and piping according to


MCC

requirements in relevant NFPA Standards.

B. Furnish two sets of chart of valves, fire hydrant, arranged by system and
designated by service and number. Type the charts to be approved by the owner.
ISSUED FOR CONSTRUCTION

Valve charts to be approved by Owner prior to installation.


DESCRIPTION

C. The valve/equipment charts shall include all new equipment.

D. Install valve tag on valves and control devices in piping system.

4.8 Field Quality Control

A. Perform the following tests and inspections and prepare test reports:
JO/EWO
10-01506-

1. Leak Test: After installation, charge system and test for leaks. Repair leaks and
0007

retest until no leaks exist.


06/26/16
DATE

2. Test and adjust controls and safeties. Replace damaged and malfunctioning
controls and equipment.
NO.
REV

00

DISCIPLINE
ENGINEER
3. Flush, test and inspect fire water network in according to NFPA 24, “Systems
MARTE COMETA Inspection, Testing and Maintenance”.
DATE: 06/26/16
PROJECT
ENGINEER 4. Verify that equipment hose threads are same as local fire department
GEORGE JACOB equipment.
06/26/16
DATE:
CERTIFIED B. Report Test Results promptly and in writing to Saudi Aramco Representative.
GEORGE JACOB

06/26/16
DATE: 4.9 Cleaning and Protection
CONSTRUCTION
AGENCY
ALI HASSAN AL-BAGGAL
A. Clean dirt and debris from installing equipments.
DATE:
06/26/16
OPERATIONS B. Protect fire hydrants and valves assembly from damage until substantial
AYMAN ABDULLATIF AL-NAMI
completion.
DATE:
06/26/16
CONTROL NUMBER

C. Flush entire piping network to remove foreign debris.


VERIFICATION

4.10 Field Painting


EDSD

A. Clean, pre-treat, prime and point new sprinkler system including valves, piping,
DATE:
BY:

conduits, miscellaneous metal work and accessories.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.11 Inspection and Testing


00

(DCC) NO. 10-01506-0007-001


_____________________

The system acceptance shall be conducted in accordance with the procedures

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 14
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
AAN SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
outlined in chapter 14 “System Inspection, Testing and Maintenance” of NFPA 24
AHB

(Latest Edition).
ENGG CERT
GJB

A. Approval of Fire Water Network:


MCC

1. Contractor shall notify the Saudi Aramco Representative of the time and date of
when the testing shall be performed.

2. The Contractor shall submit and complete and sign the appropriate
Contractor's Material and Test Certificate(s) similar to Figure 10.10.1 of NFPA
ISSUED FOR CONSTRUCTION

24 (Latest Edition) to Saudi Aramco Representative for approval.


DESCRIPTION

3. Contractor shall perform all tests which shall be witnessed by Fire Protection
Dept. / Fixed Systems Group, Loss Prevention, the Project Engineer, the
Contractor and the Proponent.

B. Field Inspection and Testing

1. Preliminary Tests

Hydrostatically test each system to a minimum pressure of 200-psig held for a


JO/EWO
10-01506-

period of four (4) hours in accordance with NFPA 13 Sec.10.10.2.2. When tests
0007

have been completed and corrections made, submit a signed and dated
certificate, similar to that specified in NFPA 24 or Saudi Aramco approved one,
06/26/16
DATE

with a request for formal inspection and tests.


NO.
REV

00

2. Formal Inspection & Tests:


DISCIPLINE
ENGINEER
MARTE COMETA SAUDI ARAMCO Representatives will witness formal tests and approve all
DATE: 06/26/16 systems before they are accepted. CONTRACTOR shall submit the request for
PROJECT
ENGINEER formal inspection at least 15 days prior to the date the inspection is to take
GEORGE JACOB place. An experienced technician regularly employed by the sprinkler installer
DATE:
06/26/16 shall be present during the inspection. At this inspection, CONTRACTOR shall
CERTIFIED repeat any or all of the required tests as directed by SAUDI ARAMCO
GEORGE JACOB
Representative. CONTRACTOR shall correct defects, if any, and make
06/26/16
DATE: additional tests until it has been demonstrated that the systems comply with all
CONSTRUCTION
AGENCY contract requirements. CONTRACTOR shall furnish appliances, equipment,
ALI HASSAN AL-BAGGAL
instruments, connecting devices and personnel for the tests.
DATE:
06/26/16
OPERATIONS 4.12 Demonstration
AYMAN ABDULLATIF AL-NAMI

DATE:
06/26/16 A. Engage a factory-authorized service representative to train Owner’s maintenance
CONTROL NUMBER

personnel to adjust, operate and maintain fire hydrant and specialty valves.
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. 10-01506-0007-001


_____________________

TECHNICAL SPECIFICATION FOR FIRE WATER SYSTEMS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

TWO (2) IDENTICAL PRE-CAST RESIDENTIAL BUILDINGS AT RIC DOC


B44 FI-E00002 15
RESIDENTIAL & INDUSTRIAL COMPLEX B OF 00
KHURAIS SAUDI ARABIA JO: 10-01506-0007 15
EDSD/2616-0399.doc

Вам также может понравиться