This document provides an executive summary of exploration activities and coal resources at IUP OP PT. Kekal Adidaya coal concession in North Barito Regency, Central Kalimantan. Key details include:
- The concession has exploration and operation permits valid through 2030.
- Exploration has included over 100 drill holes totaling over 8,000 meters, geophysical logging, mapping, and coal quality analysis.
- 39 coal seams were identified between 0.2-4.9 meters thick, with 18 major seams over 1 meter thick.
- Measured resources total 68 million tons, indicated 27 million tons, and inferred 41 million tons for a total of 136 million tons.
This document provides an executive summary of exploration activities and coal resources at IUP OP PT. Kekal Adidaya coal concession in North Barito Regency, Central Kalimantan. Key details include:
- The concession has exploration and operation permits valid through 2030.
- Exploration has included over 100 drill holes totaling over 8,000 meters, geophysical logging, mapping, and coal quality analysis.
- 39 coal seams were identified between 0.2-4.9 meters thick, with 18 major seams over 1 meter thick.
- Measured resources total 68 million tons, indicated 27 million tons, and inferred 41 million tons for a total of 136 million tons.
This document provides an executive summary of exploration activities and coal resources at IUP OP PT. Kekal Adidaya coal concession in North Barito Regency, Central Kalimantan. Key details include:
- The concession has exploration and operation permits valid through 2030.
- Exploration has included over 100 drill holes totaling over 8,000 meters, geophysical logging, mapping, and coal quality analysis.
- 39 coal seams were identified between 0.2-4.9 meters thick, with 18 major seams over 1 meter thick.
- Measured resources total 68 million tons, indicated 27 million tons, and inferred 41 million tons for a total of 136 million tons.
NORTH BARITO REGENCY CENTRAL KALIMANTAN LEGALITIES • Reconnaissance Permit No:825/TEMPERINDAG/B, date 17 December 2007 • Exploration Permit: SK Bupati Barito Utara No. 188.45/51/2008, dated 14 Februari 2008, up to 14 February 2011 • Enviromment study document (ANDAL, RKL, RPL): SK Bupati Barito Utara No. 188.45/6/2010 • Operation and Production Permit: SK Bupati Barito Utara No: 188.45/16/2010, dated 18 January 2010, up to 18 January 2030 EXPLORATION HISTORY A. PT. Reka Indo Internusa, in 2010 Detailed systimatic drilling, JORC standard: a) Total bore hole: 112, consist of 99 open hole and 13 Touchcoring b) Total depth: 8,458.20 meter (8,389.57 m open hole and 68,63 m coring) c) Total Cross-line: 12, cross-line interval 400 meter. Detail Topographie Mapping: a) Wide of area: 433.4 Hectare b) Grid interval: (25 x 25) meter Collar Survey Measurement of Geophysical logging by AUSLOG Instrument Coal Lab analisys by SUCOFINDO and GEOSERVICE B. Jully 2011, topographie mapping by LIDAR by PT. Surtech, occufied whole area at PT. Kekal Adidaya by accuration 20 m. C. Sembawang (Britmindo) 2012 Detailed infill drilling of 103, consist 14 openhole, 87 coring and 2 geotechnical. Total Depth: 4,560 m (3,571 m openhole and 989 coring) Cross-line interval: 200 – 400 meter. Partly Collar survey, only 66 holes; 37 holes not yet done Measurement of Geophysical logging by AUSLOG Instrument COAL SEAM CORRELATION MAP PIT DESIGN A. Coal Seam Total Coal Seam: 39 seams Seam thickness: 0.20 – 4.90 m Major seam (coal seam more than 1 meter: 18 seams) Coal Seam Intersection attached (attachment 3) B. Coal Resources Measured : 68 Million Ton Indicated : 27 Million Ton Inferred : 41 Million Ton Total : 136 Million Ton C. Coal Reserve are devided in to 3 pit: Pit A : 7.42 Million Ton; SR 1 : 9.06 Pit B and C : 22.25 Million Ton; SR 1 : 7.00 Pit D : 2.33 Million Ton; SR 1 : 7.13 Total : 32 Million Ton; SR 1 : 7.49 Coal Quality : - PIT A (Stratigraphicaly as the lowest part) Proven Reserve 7.42 MT, SR 1 : 9 CV Gar : Lower Part = 4462 Upper Part = 4104-4364 - PIT BC (Stratigraphicaly as the middle part) Proven Reserve 22.25 MT, SR 1 : 7 CV Gar : Lower Part = 4035-4218 Middle Part = 4254-4504 Upper Part = 3736 (small part only) - PIT D (Stratigraphicaly as the Upper part) Proven Reserve 2.33 MT, SR 1 : 7 CV Gar = 3872 COAL OUTCROP THICKNESS 2.30 M, MIDDLE SEAM (SEAM 1,500) AT IUP OP PT. KEKAL ADIDAYA