Вы находитесь на странице: 1из 3

Project SM H The Concrete Centre

Client Made by Date Page


Location Pool Deck from A to G rmw 01-Sep-19 39
ONE-WAY SOLID RC SLAB DESIGN to BS 8110:2005 c/w ANALYSIS Checked Revision Job No
Originated from RCC31.xls v4.0 on CD © 2006 TCC chg - R68

LOCATION Supports from grid A to grid G

MATERIALS COVERS
fcu 40 N/mm² h agg 20 mm Top cover 25 mm
fy 500 N/mm² s 1.15 steel Btm cover 25 mm
fyv 500 N/mm² c 1.50 concrete
steel class A
SPANS L (m) H (mm) SUPPORTS
SPAN 1 1.800 200 Support No Type
SPAN 2 1.800 200 1 K
SPAN 3 1.800 200 LOADING PATTERN 5 K
SPAN 4 1.800 200 min max K(nife), C(antilever) or E(ncastre
SPAN 5 DEAD 1 1.4
SPAN 6 IMPOSED 1.6

LOADING UDLs (kN/m²) PLs (kN/m) Position (m) LOADING


Dead Imposed Position Dead Imposed Position
Span 1 Load Load from left Span 4 Load Load from left
UDL 4.00 4.80 ~~~~ UDL 4.00 4.80 ~~~~
PL 1 PL 1
PL 2 PL 2
Span 2 Span 5
UDL 4.00 4.80 ~~~~ UDL ~~~~
PL 1 PL 1
PL 2 PL 2
Span 3 Span 6
UDL 4.00 4.80 UDL ~~~~
PL 1 PL 1
PL 2 PL 2

LOADING DIAGRAM

A G
REACTIONS (kN/m)
SUPPORT 1 2 3 4 5
Characteristic Dead 2.83 8.23 6.69 8.23 2.83
Max Imposed 3.86 9.87 8.02 9.87 3.86
Min Imposed -0.46 4.94 4.01 4.94 -0.46
MAX ULTIMATE 10.29 27.32 22.20 27.32 10.29
Project SM H The Concrete Centre
Client Made by Date Page
Location Pool Deck , from A to G rmw 01-Sep-19 40
ONE-WAY SOLID RC SLAB DESIGN to BS 8110:2005 c/w ANALYSIS Checked Revision Job No
Originated from RCC31.xls v4.0 on CD © 2006 TCC chg - R68
BENDING MOMENT DIAGRAMS (kNm/m)

6 6
5 5
4 4
3 3
2 2
1 1
0 0
‐1 ‐1
‐2 ‐2
‐3 ‐3
‐4 ‐4
‐5 ‐5
0 2 4 6 8 0 2 4 6 8

A Elastic Moments G A Redistributed Envelope G

SUPPORT No 1 2 3 4 5
Elastic M 4.6 3.1 4.6 ~ ~
Redistributed M 4.6 3.1 4.6 ~ ~
ßb 1.000 1.000 1.000 1.000 1.000 ~ ~
Redistribution

SPAN No 1 2 3 4
Elastic M 4.0 2.9 2.9 4.0 ~ ~
Redistributed M 4.0 2.9 2.9 4.0 ~ ~
ßb 1.000 1.000 1.000 1.000 ~ ~

SHEAR FORCE DIAGRAMS (kN/m)

20 20

15 15

10 10

5 5

0 0

‐5 ‐5

‐10 ‐10

‐15 ‐15

‐20 ‐20
0 2 4 6 8 0 2 4 6 8

A Elastic Shears G A Redistributed Shears G

SPAN No 1 2 3
Elastic V 10.3 14.5 12.8 11.4 11.4 12.8
Redistributed V 10.3 14.5 12.8 11.4 11.4 12.8

SPAN No 4
Elastic V 14.5 10.3 ~ ~ ~ ~
Redistributed V 14.5 10.3 ~ ~ ~ ~
Project SM H The Concrete Centre
Client 0 Made by Date Page
Location Pool Deck , from A to G rmw Sep-2019 42
ONE-WAY SOLID RC SLAB DESIGN to BS 8110:2005 c/w ANALYSIS Checked Revision Job No
Originated from RCC31.xls v4.0 on CD © 2006 TCC chg - R68

SPAN 3 LEFT CENTRE RIGHT


Av 0 1800
ACTIONS M 3.1 2.9 4.6
ßb 1.00 1.00 1.00
V 11.40 12.80
DESIGN d 169.0 169.0 169.0
As 260 260 260
As' 0 As top 260 As' 0
TOP STEEL H 12 @ 400 H 10 @ 300 H 12 @ 400
As prov 283 As' prov 262 As prov 283
BTM STEEL H 12 @ 400 H 12 @ 400 H 10 @ 300
As' prov 283 As prov 283 As' prov 262
SHEAR v 0.067 0.076
vc 0.505 links not needed 0.505
.
DEFLECTION L/d 10.651 Allowed 54.553 ok
& CHECKS % As ok ok ok
d'/x ok ok ok
max S ok ok ok

SPAN 4 LEFT CENTRE RIGHT


Av 0 1800
ACTIONS M 4.6 4.0 0.0
ßb 1.00 1.00 1.00
V 14.51 10.29
DESIGN d 169.0 170.0 169.0
As 260 260 260
As' 0 As top 260 As' 0
TOP STEEL H 12 @ 400 H 12 @ 400 H 12 @ 400
As prov 283 As' prov 283 As prov 283
BTM STEEL H 10 @ 300 H 10 @ 300 H 12 @ 400
As' prov 262 As prov 262 As' prov 283
SHEAR v 0.086 0.061
vc 0.505 links not needed 0.505
.
DEFLECTION L/d 10.588 Allowed 54.731 ok
& CHECKS % As ok ok ok
d'/x ok ok ok
max S ok ok ok