Академический Документы
Профессиональный Документы
Культура Документы
KSB19
KSB19
Mechanic comment :
V : Good Condition
Notes :
X : Bad Condition
( ) (
NA: Not Aplicable G.Leader Me
Form No. S.2.2.030/FRM
Rev : 00
ECTION REPORT
QA 7 QA 1 REMARKS
Form No. S.2.2.030/FRM
Rev : 00
ECTION REPORT
QA 7 QA 1 REMARKS
( ) ( )
Mechanic Mechanic
Page 1 / 6
PT PAMAPERSADA NUSANTARA Form No. S.2.2.030/FRM
MINING CONTRACTOR
ENGINE MODEL :
CODE NUMBER : KSB19
PS I PS II PS III PS IV PIC
HOUR METER
SERVICE
Mechanic
DATE
START TIME
FINISH TIME
Mechanic
SERVICE TIME (HOUR)
Mec.
PAP ENGINE OIL (QTY BOTTLE)
GL
MANHOUR PS (HOUR)
NAME
SIGN
Page 2 / 6
Form No. S.2.2.030/FRM
MECHANIC
15 BARE SHAFT PUMP LUBRICATE 5
ELECTRICAL
ENGINE
FUEL SYSTEM
COOLING SYSTEM
MECHANIC
LUBRICATING SYSTEM
ATTACHMENT
44 LUBRICATE OIL, GREASE LEAKS FOR MAIN PUMP CHECK & REPAIR 10
5.22
START
STOP
V Kotak checkmark sebagai tanda bahwa recheck telah dilakukan untuk critical item Page 3 / 6
MANTAN PRIMA PERSADA
Contractor & Mining
KPP Developer
PERIODICAL
WATER PUM
DnD200
Rev : 00
DE NUMBER : KSB19
Inspection Plan Repair Plan Repair Status
Qty
Date Date Duration (Hour) (BL/Close)
Page 4 / 6
Form No. S.2.2.030/FRM
MECHANIC
ATTACHMENT
11 BEARING MAIN PUMP NOISE VISUAL CHECK 3
12 BEARING VACUUM PUMP NOISE VISUAL CHECK 3
13 KRUNDIMENT VALVE CLEAN 15
14 NON RETURN VALVE CHECK / REPLACE 10
2.45
START
STOP
V Kotak checkmark sebagai tanda bahwa recheck telah dilakukan untuk critical item
Page 5 / 6
MANTAN PRIMA PERSADA
Contractor & Mining
KPP Developer
PERIODICAL
WATER PUM
DnD200
Rev : 00
DE NUMBER : DnD200
Inspection Plan Repair Plan Repair Status
Qty
Date Date Duration (Hour) (BL/Close)
Page 6 / 6