S..NO LANDTECH
3 Width 40m
S..NO LANDTECH
S..NO LANDTECH
22 Roof Extension
Lean To ( LT)
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
9 Deflection criteria
Column - H/100, L/180 & assume pined column
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
ROOF SYSTEM:
6 Gutter & down take pipe All the down take pipe shall be 1 m below FFL
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
WALL SYSTEM:
Approved Color coated
1 Wall cladding galvalume – 0.5mm
WALL condition:
S..NO LANDTECH
S..NO LANDTECH
MEZZANINE
S..NO LANDTECH
1 -
2 -
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
3 -
4 -
APPROVAL DRAWINGS :
S..NO LANDTECH
S..NO LANDTECH
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
CANCELLATION :
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
CHANGES :
WARRANTY :
TONNAGE
1 primery member MT
2 Secondary member MT
3 Anchor bolt MT
4 Roof sheeting MT
5 Wall sheeting MT
6 Crane beam MT
7 Accessories MT
POOJA GOEL WAREHOUSE BUILDING (Wi
S..NO LANDTECH
S..NO LANDTECH
S..NO LANDTECH
S..NO LANDTECH
Crane beam MT
TOTAL :
DIFFERENCE
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
01 Betn GL "1-7 / A- K" 01 Betn GL "1-7 / A- K"
70.55 m O/O 70.55 m O/O
40 m O/O 40 m O/O
9.500 Clear Ht. From FFL 9.500 Clear Ht. From FFL
Both End Wall : Non expandable frame with wind column spacing of 1@6.75;
1@6.25; 2@7.00; 1@6.250; 2@7.000; 1@6.250; 1@6.750;
40 microns of Zinc phosphate primer and intermediate of 40 40 microns of Zinc phosphate primer and intermediate of 40
microns of synthetic enamel paint. Supply of 40 microns of microns of synthetic enamel paint. Supply of 40 microns of
synthetic enamel paint at site. Total 120 dft synthetic enamel paint at site. Total 120 dft
Roof monitor is designed for 10 Air Changes Per hour in closed Roof monitor is designed for 10 Air Changes Per hour in closed
shutter condition with bird mesh shutter condition with bird mesh
Curved Eave Panel Curved Eave Panel
Width as per design (throat), Height 1.0m x Length 70.560m
Roof Panel : 0.5 mm thick (nominal) Profile “S” ZSP painted Roof Panel : 0.5 mm thick (nominal) Profile “S” ZSP painted
Zincalume – color to be established by Zamil Steel standard Zincalume – color to be established by Zamil Steel standard
available colors available colors
Wall Panel : 0.5 mm thick (nominal) Profile “ZW” ZSP painted Wall Panel : 0.5 mm thick (nominal) Profile “ZW” ZSP painted
Zincalume – color to be established by Zamil Steel standard Zincalume – color to be established by Zamil Steel standard
available colors available colors
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Portal Bracing upto crane beam level along the intermediate row of Portal Bracing upto crane beam level along the intermediate row of
columns columns
Diagonal bracing in the side walls Diagonal bracing in the side walls
Considered Electrial cable tray load of 100 KG/RMT at 8m height Considered Electrial cable tray load of 100 KG/RMT at 8m height
from FFL along all peripheral columns from FFL along all peripheral columns
Right End Wall : 5m x 68.002 m (width x length) ; clr. Ht - 5.0 Right End Wall : 5m x 68.002 m (width x length) ; clr. Ht - 5.0
m.0.5 mm thick (nominal) Profile “S” “ZSP” Zincalume – color TBE m.0.5 mm thick (nominal) Profile “S” “ZSP” Zincalume – color TBE
by Zamil Steel Standard available color by Zamil Steel Standard available color
Supporting arrangement of lightning arrester has been considered. Supporting arrangement of lightning arrester has been considered.
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Treads may be made of pre-galvanized grating, grey oxide primed Treads may be made of pre-galvanized grating, grey oxide primed
checkered plate or grey oxide primed “U” shaped pans. checkered plate or grey oxide primed “U” shaped pans.
Staircase Type - Multi flight, Staircasewidth - 1.20m, Staircase Type - Multi flight, Staircasewidth - 1.20m,
Handrails Provided, Treads type - Checkered plate Handrails Provided, Treads type - Checkered plate
A roof extension is a cantilevered extension of the roof at one or A roof extension is a cantilevered extension of the roof at one or
both sidewalls and at one or both end walls (beyond the plane of both sidewalls and at one or both end walls (beyond the plane of
the respective wall). Supply of the roof extension includes all the respective wall). Supply of the roof extension includes all
necessary framing and roof sheeting. The soffit panel is optional. necessary framing and roof sheeting. The soffit panel is optional.
Near side wall Width 1.50m x length Near side wall Width 1.50m x length
32.0m, 32.0m,
Lean-To (LT) 1.Width (m) 5.000 Out to Out of Steel line Lean-To (LT) 1.Width (m) 5.000 Out to Out of Steel line
2. Length (m) 32.000 Out to Out of Steel line 3. Clear 2. Length (m) 32.000 Out to Out of Steel line 3. Clear
Height (m) 10.000 From FFL along GL 7 4. Width Module (m) N/A Height (m) 10.000 From FFL along GL 7 4. Width Module (m) N/A
5 Roof Slope 1 in 20 (0.5 in 5 Roof Slope 1 in 20 (0.5 in
10) 6. Bay Spacing (m) 10) 6. Bay Spacing (m)
-1@8.200,2@7.650;1@8.500 7. Type of End Frames -1@8.200,2@7.650;1@8.500 7. Type of End Frames
Both End wall: Non Expandable frame with wind column spacing of Both End wall: Non Expandable frame with wind column spacing of
1@5.000 8.Type of Bracing 1@5.000 8.Type of Bracing
-Diagonal Bracings 9.Type of Eave - Eave -Diagonal Bracings 9.Type of Eave - Eave
Gutter and Downspouts Gutter and Downspouts
This area will be attached to the columns along GL 7 of A01 This area will be attached to the columns along GL 7 of A01
Height along GL 7’ will be as per 1:20 slope Height along GL 7’ will be as per 1:20 slope
All downspouts pipes are 1m below finished floor level All downspouts pipes are 1m below finished floor level
The difference between FFL and FGL is 1.2m The difference between FFL and FGL is 1.2m
Out to Out distance shown in drawings are considered as critical Out to Out distance shown in drawings are considered as critical
and Centre to Centre of column base spacing will be adjusted and Centre to Centre of column base spacing will be adjusted
accordingly at the ends accordingly at the ends
Considered Electrical Cable Tray load of 100KG/RMT at 8m height Considered Electrical Cable Tray load of 100KG/RMT at 8m height
from FFL along all peripheral columns from FFL along all peripheral columns
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
0.57 KN/sqm ( Frames & Roof) 0.57 KN/sqm ( Frames & Roof)
-
MBMA, AISI 01, AISC -10- ASD, WELDING - AWS D 1.1 : 2010 & MBMA, AISI 01, AISC -10- ASD, WELDING - AWS D 1.1 : 2010 &
AWS. AWS.
0.00 0.00
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
18" Max - seam 0.5 mm thk.(nominal) bare Galvalume. 18" Max - seam 0.5 mm thk.(nominal) bare Galvalume.
50 mm thk. Fibre glass insulation with 20KG/CUM density one side 50 mm thk. Fibre glass insulation with 20KG/CUM density one side
Aluminium foil - Eco touch Owens Corning Make considered as per Aluminium foil - Eco touch Owens Corning Make considered as per
Tender specification Tender specification
All downspouts pipes are 1 m below finished floor level. All downspouts pipes are 1 m below finished floor level.
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
0.5 mm thk. (nominal) profile "ZW" ZSP painted Zincalume - color 0.5 mm thk. (nominal) profile "ZW" ZSP painted Zincalume - color
to be establised by Zamil Steel Standrad available color. to be establised by Zamil Steel Standrad available color.
All around the building, 26 Nos ,size (3m x 1m) All around the building, 26 Nos ,size (3m x 1m)
2 mm thk. Polycarbonate sheets - 3 % of the wall area 2 mm thk. Polycarbonate sheets - 3 % of the wall area
All brick wall size - 150mm with plastering 180mm in total width All brick wall size - 150mm with plastering 180mm in total width
Near Side Wall (Along GL “7”): Betn GL “A-F” - Near Side Wall (Along GL “7”): Betn GL “A-F” -
Open upto 3.5m from FFL for block wall by others and above is Open upto 3.5m from FFL for block wall by others and above is
sheeted sheeted
Betn GL “F-K” – Full Height Block wall by others from FFL is Betn GL “F-K” – Full Height Block wall by others from FFL is
considered; No arrangement to support full height block wall is considered; No arrangement to support full height block wall is
considered in Zamil Scope considered in Zamil Scope
Far Side Wall (Along GL “1”): Betn GL 1/“A-K” - Far Side Wall (Along GL “1”): Betn GL 1/“A-K” -
Open upto 3.5m from FFL for block wall by others and above is Open upto 3.5m from FFL for block wall by others and above is
sheetedd. sheetedd.
Left End Wall (Along GL “A”): Betn GL “1-7” Left End Wall (Along GL “A”): Betn GL “1-7”
- Open upto 3.5m from FFL for block wall by others and above is - Open upto 3.5m from FFL for block wall by others and above is
sheeted sheeted
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Right End wall : Betn GL “K/1-7” - Right End wall : Betn GL “K/1-7” -
Open upto 3.5m from FFL for block wall by others and above is Open upto 3.5m from FFL for block wall by others and above is
sheeted sheeted
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Our standard mezzanine supply includes support columns, primary Our standard mezzanine supply includes support columns, primary
beams, secondary joists and a steel deck that supports 150mm beams, secondary joists and a steel deck that supports 150mm
thick reinforced concrete slab (slab by others). The steel deck thick reinforced concrete slab (slab by others). The steel deck
thickness, profile and finish will be determined by Zamil Steel thickness, profile and finish will be determined by Zamil Steel
Engineering Department. The mezzanine steel deck is intended to Engineering Department. The mezzanine steel deck is intended to
carry the weight of the slab during construction only. The concrete carry the weight of the slab during construction only. The concrete
slabs of the mezzanines must be designed by a structural engineer. slabs of the mezzanines must be designed by a structural engineer.
They must contain steel reinforcement to support all the loads on They must contain steel reinforcement to support all the loads on
the mezzanines. The deck panels, if supplied by Zamil steel are the mezzanines. The deck panels, if supplied by Zamil steel are
only for shuttering purposes. Live load 3.50 KN/sqm, Dead load - only for shuttering purposes. Live load 3.50 KN/sqm, Dead load -
As per design, Width 6.50m (GL7 -7a) x ( GL - F-K) Length As per design, Width 6.50m (GL7 -7a) x ( GL - F-K) Length
32.00m, Clear Height - 4.50m from FFL 32.00m, Clear Height - 4.50m from FFL
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
not mentioned
Any item / product or services which are not clearly mentioned in Any item / product or services which are not clearly mentioned in
this proposal are not in zamil steel's scope of work / supply. this proposal are not in zamil steel's scope of work / supply.
This offer excludes all civil work and / or architectural support. This offer excludes all civil work and / or architectural support
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
The unloading and stacking of materials as per Zamil's standard The unloading and stacking of materials as per Zamil's standard
procedures, co-ordination of anchor bolts fixing structural erection, procedures, co-ordination of anchor bolts fixing structural erection,
sheeting work, finish painting with specified paint system, if any sheeting work, finish painting with specified paint system, if any
shall be carried out by Zamil's certified builder as a separate shall be carried out by Zamil's certified builder as a separate
contract. contract.
Assumption - Deviations: Buyer to check that the specified loads Assumption - Deviations: Buyer to check that the specified
& codes are adequate for the building use. loads & codes are adequate for the building use.
Zamil will issue Approval Drawings within 03 to 04 weeks from the Zamil will issue Approval Drawings within 03 to 04 weeks from the
latest date of latest date of
a) signing of contract/ issue of Purchase Order a) signing of contract/ issue of Purchase Order
b) Receipt of advance payment. b) Receipt of advance payment.
c) LOI shall not be treated as a valid order (start of activities) c) LOI shall not be treated as a valid order (start of activities)
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Delivery Period will be TBE weeks from the latest date of receipt Delivery Period will be TBE weeks from the latest date of receipt
and acceptance of the following in SELLER and acceptance of the following in SELLER
Head Office. This period excludes the period mentioned under Head Office. This period excludes the period mentioned under
SECTION 7 of the annexed contract: SECTION 7 of the annexed contract:
a) Signed Supply Contract/ Purchase Order (Including any a) Signed Supply Contract/ Purchase Order (Including any
amendment thereto). amendment thereto).
b) Due Payment either by acceptable Letter of Credit (including the b) Due Payment either by acceptable Letter of Credit (including the
latest amendment there to) or against running latest amendment there to) or against running
bills as specified in supply contract/Purchase Order. bills as specified in supply contract/Purchase Order.
c) Return Approved GA Drawings duly signed & "approved as c) Return Approved GA Drawings duly signed & "approved as
noted" or “approved as is’. noted" or “approved as is’.
d) Final change order, PO amendment, LC amendment. (If d) Final change order, PO amendment, LC amendment. (If
applicable) applicable)
30% of the contract value as advance along with PO 30% of the contract value as advance along with PO
20% of contract value against submission of approval drawings 20% of contract value against submission of approval drawings
50% of contract value through an irrevocable and confirmed letter 50% of contract value through an irrevocable and confirmed letter
of credit (L/C) payable at sight. L/C to be opened before start of of credit (L/C) payable at sight. L/C to be opened before start of
fabrication of materials at zamil factory fabrication of materials at zamil factory
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
20% of contract value against completion of framing erection and 20% of contract value against completion of framing erection and
before commencement of roof sheeting before commencement of roof sheeting
20% of contract value against completion of roof sheeting and 20% of contract value against completion of roof sheeting and
before commencement of wall cladding before commencement of wall cladding
10% of the contract value against completion of Wall panel erection 10% of the contract value against completion of Wall panel erection
and handing over of the building and handing over of the building
20% of the contract value against completion of wall cladding 20% of the contract value against completion of wall cladding
10% of the contract value against handing over of the building 10% of the contract value against handing over of the building
This proposal shall be valid for 15 days from the above noted date. This proposal shall be valid for 15 days from the above noted date.
Any extension of validity must be received in writing from The Any extension of validity must be received in writing from The
SELLER. SELLER.
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Notwithstanding anything contained in this technical offer or the Notwithstanding anything contained in this technical offer or the
contract agreement or Purchase Order contract agreement or Purchase Order
issued/to be issued by BUYER or any other document executed issued/to be issued by BUYER or any other document executed
between the parties, if the Buyer wishes to between the parties, if the Buyer wishes to
cancel or terminate this contract then the Buyer shall give 30 days cancel or terminate this contract then the Buyer shall give 30 days
prior written notice to Seller prior written notice to Seller
with/without assigning any reasons along with letter agreeing to with/without assigning any reasons along with letter agreeing to
promptly payment of cancellation promptly payment of cancellation
charges to SELLER. The Seller charges to SELLER. The Seller
reserves the right to enforce this clause against the Buyer by reserves the right to enforce this clause against the Buyer by
resorting to appropriate legal remedy, resorting to appropriate legal remedy,
in case the Buyer fails to pay the cancelation charges as per the in case the Buyer fails to pay the cancelation charges as per the
stipulated time mentioned hereinabove. stipulated time mentioned hereinabove.
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
Changes in the requirements requested by the BUYER, after a Changes in the requirements requested by the BUYER, after a
contract is signed and accepted, requires the BUYER to sign a contract is signed and accepted, requires the BUYER to sign a
change order addendum, prepared by the SELLER, which change order addendum, prepared by the SELLER, which
describes the change(s) and the impact describes the change(s) and the impact
the changes may have on price and/or delivery. the changes may have on price and/or delivery.
The warranty period shall be 12 months from the date of Bill of The warranty period shall be 12 months from the date of Bill of
lading of the last shipment. The SELLER shall do the inspection lading of the last shipment. The SELLER shall do the inspection
within Seven (7) days from the notification of the BUYER and shall within Seven (7) days from the notification of the BUYER and shall
repair repair
them or replacement the parts within thirty days (30 days) from the them or replacement the parts within thirty days (30 days) from the
date of receipt of notice of such defect from date of receipt of notice of such defect from
the BUYER at the cost of SELLER. the BUYER at the cost of SELLER.
97 50
46 30
5 1
29
30
26 20
12 5
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
17 8
10 12
5 5
249 160
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
29,969,090 18,549,917
3,000,000 2,200,000
32,969,090 20,749,917
25,397,534 15,720,269
2,542,373 1,864,407
27,939,907 17,584,676
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
804
3627.975
39051.5229
WAREHOUSE BUILDING (With Mezzanine)
ZAMIL STEEL (R1) - WITH JACK BEAM ZAMIL STEEL (R1)-WITHOUT JACK BEAM
ZAMIL
29.820
42709
35,947,208
3,389,831
39,337,039
33,107,663
3,389,831
36,497,494
2,839,545
7.22%
92.78%
LLOYD INSULATIONS (R0)
70.55 m
40 m
10 m
1:20
Not mentioned
2883.3333
LLOYD INSULATIONS (R0)
Not mentioned
Not mentioned
Not mentioned
Not mentioned
Crane - 2: Crane
capacity = 5.00 MT Span - As per
design Run length =69.55
Bracket ht. = 6.50 M
Crane - 2 : Crane
capacity = 10.00 MT Span - As
per design Run length =
69.55 M Bracket ht. = 6.50 M
LLOYD INSULATIONS (R0)
Stair case SS hand rails 1.2M considered
Not mentioned
Not mentioned
LLOYD INSULATIONS (R0)
00.57 KN/Sqm
-
50 m/s
1. Designed in accordance with "AISC – 89
2. Wind Load considered as per “IS 875‐ Part 3”
3. Cold formed components have been designed in
accordance with: “AISC‐96"
4. Welding has been applied in accordance with:
“American Welding Society” (AWS) D1.1.96 Structural
Welding Code ‐ Steel Manual, D1.1 ‐2004.
5. “Criteria for Earthquake Resistant Design of Structures”
IS‐1893:2002
0.20
Zone 3
Vertical
Deflection - Main Frame Rafters Span / 180 Dead + Live
2 Roof Purlins Span / 150 Dead + Live
Lateral
Deflection: 1. Main Frame Columns with eave height (EH)
up to 9.0m
Eaves Height / 150 Dead + Wind
2 Wall Girts Span / 120 Wind Only
3 Endwall Wind Column Span / 120 Wind Only
4 Portal Frames Eaves Height /90 Wind Only
LLOYD INSULATIONS (R0)
Not mentioned
4645 232.25
Not mentioned 4649.4593
232.47297
We have considered 0.5 mm thick Colour Coated
Galvalume sheet for Eave Gutter For
Downtake pipe we have considered 0.5 mm thick Colour
Coated Galvalume sheet 608.12
LLOYD INSULATIONS (R0)
Not mentioned
95.22
Far Side Wall 3.50m height block wall from the FFL and
remaining cladding.
Left End Wall 3.50m height block wall from the FFL and
remaining cladding.
LLOYD INSULATIONS (R0)
Right End Wall 3.50m height block wall from the FFL and
remaining cladding.
LLOYD INSULATIONS (R0)
not mentioned
5% after completion
LLOYD INSULATIONS (R0)
35689.5
35689500
LLOYD INSULATIONS (R0)
0.0
LLOYD INSULATIONS (R0)
18,131,460
2,857,580
20,989,040
15,365,644
2,421,678
17,787,322
LLOYD INSULATIONS (R0)
512
943.09
1886.18
2S-18-019 LANDTECH ENGINEERING PRIVATE LIMITED
TONNAGE BREAK - UP
S.NO Description Tonnage (MT)
1 Primary members 122.35
Secondary members, Staircase, Sheeting,
2 Accessories, etc., 132.59
3 Crane Beam 27.27
TOTAL 282.21
NOTES:
1) There will be a tonnage variation of +/-5% to that provided
above, after Final Detailing and Fabrication
2) Primary members are inclusive of Columns, Rafters, Jack Beams,
Cage Ladders etc..
3) Mezzanine Supporting Arrangements are Inclusive of Mezzanine
Columns, Mezzanine Beams, Joists, Decking Sheets, etc..
4) Accessories are inclusive of Insulation, Louvers, Strip Lights, Bird
Mesh , Wall Lights etc..