Вы находитесь на странице: 1из 36

3G Huawei Redeploy

BTS3900A

Installation, Commissioning and Integration


Acceptance Manual

Project Name : NOKIA


Phase :
Region : Central Sumatera
Site Configuration : 3G Redeploy Huawei 1/1/1
Site Name : KAPAU
Site ID : 030747
BSC Name :
RNC Name :
SITE ACCEPTANCE CERTIFICATE

PO Number 2015/NEFPA/PO/21082018-575a

Site ID 030747

Site Name KAPAU

Work type New site / Collocated / Upgrade / Redeploy

BTS Equipment Type BTS3900 BTS3900A


Stack type Pole Mounted
BTS Installation Type
Rack Wall Mounted
Site Solution Feederless Feederline
Green Field Indoor
Rooftop
Site Type Green Field Outdoor
3rd Party Building/Tower
Inbuilding Coverage
BTS Configuration 3G ___ / ___ / ___ @ ___ Watt

Nagari Pilubang, Kecamatan Ampek Angkek, Kabupaten Agam,


Site Address
Sumatera Barat

Installer Name:Hari Novanda


Installation Date
Phone Number:082388100097
Commissioning Engineer :Husein
Commissioning Date
Phone Number: 0878-9544-6566
Self Assesment Date :

Integration Date

Nokia Siemens Networks hereby states that the whole of supplies detailed above have been inspected,
implemented, tested and unless otherwise stated conform to the specified requirements in the contract
or order identified above.

NOKIA Ms Huawei H3I


MS Huawei
Representative Cluster Representative

Signature :

Approved by :

Date :
Table of Contents

1. Antenna and Feeder System............................................................................................ 4


1.1 Antenna Configuration............................................................................................... 4
1.2 Feeder Configuration.................................................................................................. 4
1.3 Voltages Measurement............................................................................................... 5
1.4 Antenna Line Sweep Test Tool.................................................................................... 5
1.5 Antenna Line Sweep Test Result................................................................................5
1.6 Antenna Line Quality Checklist..................................................................................8
2. Equipment Installation & Commissioning Record.............................................................9
2.1 BTS Instalation Record............................................................................................... 9
2.1.1 BTS Information................................................................................................ 9
2.1.2 BOQ Modules.................................................................................................. 11
2.2 Commissioning Record............................................................................................. 12
2.2.1 BTS & Transmission Information.....................................................................12
2.2.2 Node B and RNC Information..........................................................................13
2.2.3 Remote Access Test........................................................................................ 13
2.2.4 TRX Configuration........................................................................................... 13
2.3 Test Call.................................................................................................................... 13
2.3.1 3G Test Call..................................................................................................... 14
3. ATTACHMENTS................................................................................................................ 17
1. ANTENNA AND FEEDER SYSTEM

1.1 Antenna Configuration

A. 3G Antennas

SECTOR 1 SECTOR 2 SECTOR 3 SECTOR 4 SECTOR 5 SECTOR 6

Antenna Type

Serial No

Direction

Mechanical Tilt

Electrical Tilt

Antenna Height

1.2 Feeder Configuration

A. 3G Feeder System

Actual Feeder Installed


Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
FEEDER
Feeder Cable
Type
Installed Feeder
m m m m m m
Length
Top Jumper
m m m m m m
Length
Buttom Jumper
m m m m m m
Length
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
Top Jumper
RRH RRH RRH RRH RRH RRH
Length
1 2 3 4 5 6
Optical Cable
Type
Optical Cable
m m m m m m
Length
DC Cable Type

DC Cable Length m m m m m m

1.3 Voltages Measurement

A. Rectifier System

Items Specification Measurement Result

AC Input of
220±10% VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC
Rectifier System
B. 3G

Items Specification Measurement Result

AC Input of
220±10% VAC
Rectifier System
DC Output of
-40.5 VDC – -57 VDC
Rectifier System
DC Input of
-40.5 VDC – -57 VDC
System Module
FEEDERLESS
RFM/ RFM/ RFM/ RFM/ RFM/ RFM/
RRH RRH RRH RRH RRH RRH
1 2 3 4 5 6
DC Input of RF
-36 VDC – -57 VDC
Module or RRH

1.4 Antenna Line Sweep Test Tool

DATE OF LAST
MANUFACTURER MODEL SERIAL NUMBER
CALIBRATION

1.5 Antenna Line Sweep Test Result

A. VSWR Measurement
Measure the VSWR value of feederline, including the RF bottom jumper, feederline, and antenna. Maximum
VSWR value allowed is 1.3.

3G

SECTOR 1 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 2 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 3 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

SECTOR 4 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

Sector 5 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)

Sector 6 Tx2/Rx2 RxDiv2

VSWR Value

Return Loss (max)


B. DTF – SWR Measurement

Botto Feeder Cable Top Antenna


m Jumper
Jumper M5

M1 M2 M3 M4
Distance to Fault Criteria:
M1 Connection point between RF/RRH Module to the bottom Distance 0 m, SWR  1.05
jumper
M2 Connection point between bottom jumper to the feeder Distance 3-6 m, SWR  1.05
M3 Connection point between feeder to top jumper Distance as per feeder length,
SWR  1.05
M4 Connection point between top jumper to the antenna Distance 3-6 m, SWR  1.05
M5 Maximum VSWR value on feeder line Distance between M2 & M3,
SWR  1.01

3G Feederlines

M1 M2 M3 M4 M5 Not
Feeder OK N/A Remark
S D S D S D S D S D OK

Sector 1 A
Sector 1 B
Sector 2 A
Sector 2 B
Sector 3 A
Sector 3 B
Sector 4 A
Sector 4 B
Sector 5 A
Sector 5 B
Sector 6 A
Sector 6 B

1.6 Antenna Line Quality Checklist

Item Description OK NOK N/A

1 EQUIPMENT PREPARATION
1.1 Delivery checked, shortcomings recorded
1.2 Transport damages recorded
2 SITE PREPARATION
Item Description OK NOK N/A

2.1 Equipment layout checked, differences to the drawings recorded


2.2 Cabling routes checked, cable trays & ladders installed
2.3 Antenna tower/pole grounding checked
3 ANTENNA INSTALLATION
3.1 Antenna mounted according to Site Specific Documents
3.2 Mounting height checked according to Final Site Configuration
3.3 Lobe direction checked according to Final Site Configuration
Mechanical tilting angle checked according to Final Site
3.4
Configuration
3.5 Electrical tilting angle checked according to Final Site Configuration
3.6 Antenna mounting clamps checked, all screws tightened
4 FEEDER INSTALLATION

4.1 Feeder cables installed according to Site Specific Documents


4.2 Feeder cables grounded at top of support structure
4.3 Feeder cables grounded at bottom of tower/mast
Feeder cables grounded at additional points (d > 40m)where
4.4
applicable
4.5 Feeder cables grounded at the gland plate
4.6 Feeder/ jumper cables secured in position
4.7 Feeder cables labelled correctly
Antenna feeder and jumper connectors checked and tightened at
4.8
both ends
4.9 All external connectors checked for correct sealing
4.10 BTS jumper cable connectors checked and tightened at both ends
5 OPTICAL INSTALLATION
5.1 Optic cables installed according to Site Specific Documents
5.2 Optic cables use conduit and secured in position with cable ties
5.3 Optic cables labelled correctly
5.4 Optic cables port plug in properly
5.5 IP seal for Optic cables port plug in properly
5.6 Optic cables spare rolled with diameter minimum 140mm
5.7 Optic cables spare placed in a secure position
5.8 Optic cables installed separated with power cable

2. EQUIPMENT INSTALLATION & COMMISSIONING RECORD

2.1 BTS Instalation Record

2.1.1 BTS Information

ITEM DESCRIPTION OK NOK N/A


1 PREPARATION
1.1 Delivery checked, shortcomings recorded
1.2 Transport damages recorded
ITEM DESCRIPTION OK NOK N/A
2 SITE PREPARATION
2.1 Equipment layout checked, differences to the drawings recorded
2.2 Cabling routes checked, cable trays installed
2.3 Installation of main grounding busbar (connection to building earth)
checked
3 CABINET INSTALLATION
3.1 BTS installed according to the Site Specific Documents
3.2 Cabinets fixed to wall or floor, secured and feet adjusted
4 CABINET EXTERNAL CABLING
4.1 Each BTS cabinet connected to main grounding busbar
4.2 Power cables to BTS cabinets connected and marked
4.3 Antenna Cables connected to BTS and tightened.
4.4 Cables secured and tidy on cable tray
5 ALARM TERMINAL BLOCK INSTALLATION AND CABLING
5.1 Alarm Terminal Block installed according to Site Specific Documents
5.2 Alarm Terminal Panel labelled
5.3 Alarm Terminal Panel connected to main grounding busbar
5.4 Alarm cable to BTS connected and marked
5.5 Cables from equipment room alarm units (door etc.) connected and
marked
5.6 Jumpers connected on Alarm Terminal Block
6 DDF INSTALLATION AND CABLING
6.1 DDF installed according to Site Specific Documents
6.2 DDF connected to equipment room grounding busbar
6.3 DDF crossconnected cables fitted
6.4 2MB Abis cables connected and marked at BTS
6.5 2MB Abis cables connected and marked at BTS DDF
6.6 2MB cables connected and marked between Telecom DDF and BTS
DDF
7 BTS PLUG-IN UNIT INSTALLATION
7.1 Switches and jumper settings of units and motherboards set
according to instructions in Section 7.2
7.2 Plug-in Module interconnection cables connected
7.3 Plug-in Module retaining screws tightened
7.4 Connectors tightened correctly (N-Type, SMA, Data, Power)
8 CABINET INTERNAL CABLING
8.1 All cables and connectors in BTS cabinets connected (including
unused cables) as for the BTS configuration specified in Section 1
8.2 All the TRX RF cable connections to the combiners are checked in
the table at previous paragraph 7.3.
8.3 Cables in BTS cabinets cable formed and cable tied
8.4 Earth Strap to cabinet door(s) connected
8 CABINET INTERNAL CABLING
All cables and connectors in BTS cabinets connected (including
8.1 unused cables) as for the BTS configuration specified in Section 1
8.2 All the TRX RF cable connections to the combiners are checked in
the table at previous paragraph 7.3.
8.3 Cables in BTS cabinets cable formed and cable tied
8.4 Earth Strap to cabinet door(s) connected
9 FINISHING
9.1 ‘Hardware kit’ box of BTS checked and left in the site
9.2 BTS Cabinet door key left on site
ITEM DESCRIPTION OK NOK N/A
9.3 BTS cabinet top cover and rear door fitted and secured
9.4 Packing materials removed from the site
9.5 Rubbish removed and room cleaned and tidy
10 DOCUMENTATION
10.1 BTS Factory Test Reports placed in Section 10 of the Site Folder
10.2 BTS inventory lists placed in Section 9, Serial numbers of units and
cabinets must be checked, - actual differences from the packing lists
recorded in Section 9.5 /.
2.1.2 BOQ Modules

A. Flexi Multiradio BTS 3G

Item
Item Description Quantity Part Number Serial Number
Code

Cabinet APM30

Cabinet RFC

BBU3900 / HERT
BBU,WD2BBBUC,HERT BBU Box
UMPT / WD22UMPTb1 /BBU3900-
WD22UMPTb1-Universal Main
Processing & Transmission unit
with 4E1 and 2FE/GE interface
WBBPd /
BBU3900,QWL1WBBPD2,WCDMA
Baseband Process Unit D,1*1
UPEU / WD2MUPEUC/HERT BBU
WD2MUPEUC,-48V Power and
Environment interface Unit
UEIU / WD2M1UEIU/Functional
Module,HERT
BBU,WD2M1UEIU,Universal
Environment Interface control Unit
FAN/ WD2E1FANC/Fan Box,HERT
BBU,WD2E1FANC,2U Fan Module

WRFU
2.1.2.1 BoQ Upgrade / Licenses

Existing
No Object Final Quantity
Quantity
2.2 1 Channel Element Co
mm 2 Carrier issi
oni ng
3 HSDPA Code
Record

2.2.1 BTS & Transmission Information

TRS Information VALUE BTS Information VALUE


TRS Public IP NodeB Name
TRS Destination IP NodeB ID
TRS Gateway IP NodeB IP Address
TRS LMP Public IP RNC Name
TRS LMT IP RNC ID
TRS LMP Broadcast IP RNC IP
Neighbour Node
Discovery
NTP IP
System Name
User Label
Location
Q1 Baud rate
Other Destination IP

* For BTS 24x

2.2.1.1 Transmission Link Information

REMARKS (Capacity, Number of E1s, Eqp


TYPE
type)
STM 1
E1:
120 ohm 75 ohm
FLEXBUS TYPE REMARKS
SDH

PDH

Flexihopper
Metrohopper
OTHER
………………..
Cross connect route (with system detail)
……………………………………………………………………………………………………………
2.2.2 Node B and RNC Information

Parameter RNC NODE B

Node Name
PLMN ID
Routing Area Code
Location Area Code
Service Area Code
O&M Link (IP Address)
Transmission Capacity

PARAMETER SECTOR 1 SECTOR 2 SECTOR 3 REMARK


SAC
CELL ID
Primary
Scrambling
Code (PSC)
Adjacent Cell
PSC

2.2.3 Remote Access Test

Error:
Refer
ence
TEST DATE COMMENTS
sourc
e not
found
Abis Test

External Alarm Tests*

BTS Restart

Launch & connection BTS Manager from LMT

2.3 Test Call

2.3.1 3G Test Call

a. Voice Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

b. Video Test Call


Test Call Result
Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

c. Packet Switch Test Call

MO Host Throughput Test Call Result REMARK


Item Test
Number Address / Delay Ok NOk N/A
PING
WAP
HTTP
FTP
Downlink
FTP Uplink
Video
Streaming

d. SMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

e. MMS Test

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
Mobile
Originating
Mobile
Terminating

f. Handover Test

Originating Destination Test Call Result


Item Test REMARK
Cell Id Cell Id Ok NOk N/A
SECTOR 1
Incoming
Handover
Outgoing
Handover
SECTOR 2
Incoming
Handover
Outgoing
Handover
SECTOR 3
Incoming
Handover
Outgoing
Handover
SECTOR 4
Incoming
Handover
Outgoing
Handover
SECTOR 5
Incoming
Handover
Outgoing
Handover
SECTOR 6
Incoming
Handover
Outgoing
Handover

g. Emergency Test Call

Test Call Result


Item Test MO Number MT Number REMARK
Ok NOk N/A
112
118

3. ATTACHMENTS

1. Screenshoots
a. 3G Modules Configuration
b. 3G CE Availability
c. 3G Transmission Module Configuration
2. Antenna Sweep Test Result
a. 3G Sector 1 VSWR and DTF
b. 3G Sector 2 VSWR and DTF
c. 3G Sector 3 VSWR and DTF
d. 3G Sector 4 VSWR and DTF
e. 3G Sector 5 VSWR and DTF
f. 3G Sector 6 VSWR and DTF
3. Installation Pictures
a. System Module Installation (open and closed front cover)
b. DC power cable termination to MCB in Rectifier System
c. Feeder Installation
d. Antenna Installation
4. Commissioning Files
a. NodeBCfg.xml
b. HSDPA upload/download screenshoots (www.speedtest.net)
5. Redline drawing
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

N/A

View EnodeB 3G Huawei Position 3G Huawei Installation Closed

3G Huawei Installation Open Cabling Installation

Company Name Signature Page

Page 1 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

N/A

MCB &Label Installation


Power Cable Installation

N/A

Grounding Cable On Cabinet Grounding Cable & Main Busbar

Company Name Signature Page

Page 2 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

DDF Box With Label

N/A

DDF Modules, label & Grounding

Company Name Signature Page

Page 3 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

View Antenna Sector 1 View Antenna Sector 2

View Antenna Sector 3

Company Name Signature Page

Page 4 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME :030747/KAPAU


IMPLEMENTATION PHOTO
Antenna Bracket Sector 1 Antenna Bracket Sector 2
SITE ID/SITE NAME :030747/KAPAU

N/A
N/A

Antenna Bracket Sector 3

Company Name Signature Page

Page 5 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

Antenna Cell View Sector 1 Antenna Cell View Sector 2

Antenna Cell View Sector 3

Company Name Signature Page

Page 6 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

Feeder Jumper Installed Sector 1 Feeder Jumper Installed Sector 2

Feeder Jumper Installed Sector 3

Company Name Signature Page

Page 7 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

Feederless Installation On Vertical Tray

Feederless Installation On Horizontal Tray


Company Name Signature Page

Page 8 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME :030747/KAPAU

N/A

View To Site

N/A

Name Plate

Company Name Signature Page

Page 9 of 10
IMPLEMENTATION PHOTO

SITE ID/SITE NAME : 030747/KAPAU

KWH & ACPDB Panel

Recti

Company Name Signature Page

Page 10 of 10
4. PUNCH LIST

Site ID : 030747
Integration date:KAPAU

Note – Comments – Fault


Number Problems Cleared

1 Chapter : Name :

Description : Date :

2 Chapter : Name :

Description: Date :

3 Chapter : Name :

Description Date :

4 Chapter : Name :

Description : Date :

5 Chapter : Name :

Description : Date :

NSN Representative, Hutchison 3 Indonesia Representative,

Name: .................................................. Name: .......................................................

Revision number: 00 26
Date of issue: December, 2018 of
References: 34
CAPTURE 3G HUAWEI
SITE ID/ SITE NAME: 030747/KAPAU

Revision number: 00 29
Date of issue: December, 2018 of
References: 36
Revision number: 00 30
Date of issue: December, 2018 of
References: 36
Revision number: 00 31
Date of issue: December, 2018 of
References: 36
Revision number: 00 32
Date of issue: December, 2018 of
References: 36
Revision number: 00 33
Date of issue: December, 2018 of
References: 36
Revision number: 00 34
Date of issue: December, 2018 of
References: 36
Revision number: 00 35
Date of issue: December, 2018 of
References: 36
SPEED TEST-3G
SITE ID/SITE NAME: 030747/KAPAU

Revision number: 00 36
Date of issue: December, 2018 of
References: 36

Вам также может понравиться