NO-DRILL™HANGERS

INTEGRATED LEAN CONSTRUCTION


THROUGH INNOVATION ™

www.nodrillhangers.com
Patented

BADGER INDUSTRIES
NO-DRILL HANGERS

IMPROVE CONSTRUCTION SCHEDULING


IMPROVE CONSTRUCTION FLEXIBILITY
IMPROVE OWNER FACILITY USAGE
IMPROVE OWNER FACILITY VALUE

NO NOISE
NO HAZARDOUS
SILICA DUST Si0 2

NO HEPA VAC DUST


LINK TO VIDEO
http://www.badgerindustries.com
NO PERMANENT HOLES IN THE DECKING
NO ABANDONED ANCHORS OR INSERTS
NO SHOOT-IN CONCRETE BLOW OUTS
NO HOLES DRILLED THROUGH THE FLOOR
NO HAZARDOUS SILICA DUST
NO NOISY HAMMER DRILL OR HEPA VAC
NO POUNDING ANCHORS INTO CONCRETE
NO EXPENSIVE ANCHOR INSPECTIONS

BADGER INDUSTRIES No-Drill™ Hangers


Integrated Lean Constuction Through Innovation
Fast / Easy / And Simple To Install
Fast / Easy / And Simple To Remove
Fast / Easy / And Simple To Inspect
Visual Inspection Compliant
“ BADGER INDUSTRIES “ Patent Pending

NO-DRILL METAL DECK HANGERS


Badger Industries
Badger Industries Badger Industries Part # [MDH5834]
Part # [MDH3812] Part # [MDH1258]

~ BADGER INDUSTRIES - NO-DRILL™ HANGERS ~


BADGER INDUSTRIES FITS FITS MFG.
NO-DRILL™ HANGER THREADED ROD VERCO QUANTITY WEIGHT Suggested
Part Number AND BOLT SIZES DECK SIZES PER BOX PER 100 LIST PRICE

MDH3812 1/4", 3/8"& 1/2" W2 & W3 40 pcs. 100 lbs. $23.00


each
MDH1258 1/2"& 5/8" W3 20 pcs. 200 lbs. $29.00
each
MDH5834 5/8"& 3/4" W3 20 pcs. 200 lbs. $29.00
each
MDHU 3/8", 1/2", W3 10 pcs. 200 lbs. $29.00
Release 2018 each
5/8"& 3/4"
Contact: Sales@NoDrillHangers.com Information subject to change without notice.

Stocking Master Distributors: Southern California


• Jobsite Supply Co. Brad Lawhorn (714) 929-8668
• Pacific Southwest Sales Carl Curtis (213) 819-0665
• ACME Construction Supply Co. Jamie Shaughnessy (714) 244-9865

Stocking Master Distributors: Northern California


• Fluid Gauge Co. / Force Support Services Tim Lindfelt, P.E. (415) 312-5222
• ACME Construction Supply Co. Jamie Shaughnessy (714) 244-9865

Stocking Master Distributors: Washington & Oregon


• ACME Construction Supply Co. James Punzel (253) 202-3317

Stocking Master Distributors: National E-Commerce


• MahannCo www.mahannco.com

Stocking Master Distributors: CANADA


• Cascadia M8 Seismic Terry Richards (778) 929-1541
4340 N. 42nd Avenue, Phoenix, Arizona 85019 P (602) 272-1347

February 21, 2017

Subject: Badger Industries MDH3812, MDH1258 and MDH5834 No-Drill™ Hangers

To Whom It May Concern:

Verco Decking, Inc. has reviewed the test methods, visited the test lab at which performance
testing was conducted, inspected composite steel deck test specimens and witnessed the
installation of Badger No-Drill Hangers.

No-Drill™ Hangers support loads through interaction with the continuous keys in the webs of
the W3 and W2 Formlok™ composite steel deck. The No-Drill™ Hangers are an excellent
solution for attaching gravity and/or seismic hanging loads as well as seismic lateral bracing
loads.

The No-Drill™ Hanger forms a strut, bearing on the continuous keys in the webs of the steel
deck. The strut effect of the No-Drill™ Hanger on the continuous key does not impact the load
carrying capacity of the Verco W3 or W2 composite steel deck.

Sincerely,

Patrick Bodwell, P.E.


Project Manager
Vulcraft/Verco Group Technical Services
pbodwell@vercodeck.com
916-640-8615

PHOENIX SAN FRANCISCO LOS ANGELES SACRAMENTO SEATTLE SALT LAKE CITY PAGE 1 OF 1
~ CODE COMPLIANCE NOTICE ~
10/17/17

(1.) Badger No-Drill™ Metal Deck Hangers are compliant with the IBC, ASCE/SEI 7, CBC, and
OSHPD CBC A-Chapters section 2210, therefore there is no basis to require a product approval
report issued under alternate materials, means or methods provisions of the code.

Badger No-Drill™ Metal Deck Hangers connect hanging and/or bracing loads to Verco
cold-formed steel composite deck. Connections of adjoining materials to cold-form steel deck are
covered by AISI S-100 North America specification for the Design of Cold-Formed Steel Structural
Members. This design standard contains provisions for the design of connections to cold-formed
steel by test in section A1.2(a) and section F. The factored strengths for the Badger No-Drill™
Metal Deck Hanger are in conformance with the provisions of AISI S-100 specified in section 2210
of the IBC, CBC and the OSHPD CBC A-Chapter.

Test results comply with 2016 NFPA-13 Chapter 9, Paragraph 9.1.1.2, thus allowing Badger
No-Drill™ Metal Deck Hangers to be certified by a registered professional engineer for use with
fire protection piping systems.

Testing was performed by an independent approved laboratory having accreditation to the ISO
Accreditation Standard 17025. Testing was under the responsible charge of an independent
California licensed engineer. Seismic testing was performed using the FM 1950 seismic cyclic
protocols. Gravity and ceiling wire testing was performed using ASTM E488 tension protocols.
Results were used for engineered analysis / determination of capacities and Codes / Standards
compliance listed within NUSIG / Badger Installation Details.

(2.) NUSIG / Badger Industries Manufacturer’s Certification:


Part No: Part Description: Usage: Compliance Method:
MDH3812 No-Drill™ Metal Deck Hanger GS / SV Testing & Analysis
MDH3812 No-Drill™ Metal Deck Hanger Ceiling Wire Testing & Analysis
MDH1258 No-Drill™ Metal Deck Hanger GS / SV / SB Testing & Analysis
MDH5834 No-Drill™ Metal Deck Hanger GS / SV / SB Testing & Analysis
MDHU No-Drill™ Metal Deck Hanger GS Testing & Analysis
(GS = Gravity Support)
(SV = Seismic Vertical)
(SB = Seismic Brace)
~ MDH GENERAL NOTICE ~
10/17/17

Neither NUSIG nor Badger Industries is responsible for engineering or detailing the use of NUSIG, Badger
Industries and/or others products and components for a specific project and/or application. All such engineering
is to be performed by an engineer, retained by others, who is licensed to perform the necessary engineering,
and who is insured to provide “Responsible Engineer” engineering services. All design submittals specifying
NUSIG / Badger Industries products and components must be sealed and signed by the Responsible Engineer,
and submitted for review and approval to the project S.E.O.R. (Structural Engineer of Record).

Read all notices and instructions prior to design and usage. Laboratory testing (even that recognized by
building codes and standards) is not necessarily indicative of actual project specific application usage
conditions. The MDH components have not been tested for, and shall not be used for fall protection and/or
lifting device usage conditions. The usage, design, engineering, installation and inspection of MDH construction
component usage assemblies (both seismic and non-seismic) shall take into account the capacity limits of the
weakest components and conditions within the overall assembly, including but not limited to the building
structure, threaded rod compression with or without rod stiffeners, prying and eccentricity interactions, etc.
Such shall be the responsibility of non-NUSIG / Badger Industries others.

NUSIG / Badger Industries documents are subject to change without notice or responsibility. NUSIG / Badger
Industries products, components and documents are for interior use. It is the responsibility of the user to
qualify that they are using the most current NUSIG / Badger Industries documents.

LIMITATION OF LIABILITY
To the fullest extent permissible by law, NUSIG, Badger Industries, and their respective owners, officers,
directors, employees, agents and representatives (collective, the “Parties”) excludes all liability except liability
that is directly attributable to the willful negligence of the Parties. Should the Parties be held liable, under any
theory, the aggregate liability of all of them is limited to the total purchase price of the Parties products that
caused the injury or loss. In addition to the foregoing, THE PARTIES ARE IN NO EVENT LIABLE FOR
ANY LOSS OF BUSINESS OR PROFITS, LOSS OF USE, LOSS OF OPPORTUNITIES, DOWNTIME OR
DELAY, LABOR, REPAIR OR MATERIAL COST OR ANY OTHER SIMILAR OR DISSIMILAR,
INCIDENTAL OR CONSEQUENTIAL LOSS OR DAMAGE INCURRED BY BUYER. By purchasing the
Parties’ products, you agree to this limitation of liability on your behalf, and on behalf of the person or
organization purchasing the products.

WARRANTY
NUSIG and/or Badger Industries products are warranted to be free from defects in material and workmanship
at the time of shipment. NO OTHER WARRANTY, WHETHER EXPRESS OR IMPLIED (INCLUDING
ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE), SHALL
EXIST IN CONNECTION WITH THE SALE OR USE OF ANY NUSIG AND/OR BADGER INDUSTRIES
PRODUCTS. Products claimed to be defective or nonconforming must be identified in writing and returned
(within 30 calendar days) to NUSIG / Badger Industries for inspection. Notice of a warranty claim within this
30 day period is a condition precedent to this Warranty. In no event shall NUSIG / Badger Industries be
responsible if the products have been improperly stored, improperly used, abused or misused. NUSIG / Badger
Industries will, at its option, either repair or replace defective or nonconforming products for which it is
responsible or return the purchase price to the BUYER. THE FOREGOING STATES BUYER’S EXCLUSIVE
REMEDY FOR ANY BREACH OF THE NUSIG AND/OR BADGER INDUSTRIES WARRANTY AND
FOR ANY CLAIM, WHETHER SOUNDING IN CONTRACT, TORT OR NEGLIGENCE, FOR LOSS OR
INJURY CAUSED BY THE SALE OR USE OF ANY NUSIG AND/OR BADGER INDUSTRIES
PRODUCT(S).

WARNING
The improper use, misuse and/or misapplication of these documents and/or NUSIG / Badger Industries
products may cause product malfunction, property damage, bodily injury and death.
~ JAM NUT NOTICE ~
10/17/17

When Mandated By The Designer Of Record


A Jam Nut Can Be Installed On Either
The Upper Or Underside Of The No-Drill™
Hanger

Unless Depicted Within A Given Detail, A


Jam Nut Is Not Required To Secure
The Thread Rod Connection To The
No-Drill™ Hanger

Trade Supports With Upper And Lower


Nuts Prevent Rotation Of The Vertical
Support Rod For [MDHU] Underside Jam Nut
Installations And For Seismic
Vertical Uplift Resistance Install
A Strut Nut Size To Fit Verical Rod

~ BADGER INDUSTRIES ~
Jam Nut Notice
JNN (Elev. View) - (Not To Scale) - (Read MDH General Notice Prior To Use)
~ CANTILEVERED MEMBER NOTICE ~
10/17/17

Horizontal Reference

Horizontal Reference

Horizontal Reference

Notice:
The depictions above demonstrate how visibly noticeable two degrees (2º) of angular deflection of a cantilevered beam may be. The greater the length
of the cantilever, the greater the linear offset from horizontal will become.
While such deflections may be structurally sound and within code allowance, they may be visibly concerning to those unfamiliar with the code
calculations and standard beam deflection principles.
As such, Badger Industries Installation Details that reference this, Cantilever Member Notice Detail (CMN), have had their listed gravity capacities
reduced to represent maximum allowable loads resulting in an average of one degree (1º) of angular deflection, as derived from independent lab
testing.
Badger Industries believes these reductions will increase system safety factors, may prevent misalignment of the trade system, and may eliminate rod
bending concerns.

~ BADGER INDUSTRIES ~
Cantilevered Member Notice
CMN (Elev. View) - (Not To Scale) - (Read MDH General Notice Prior To Use)
~ SLOPED DECK NOTICE ~
10/17/17

Swivel Allows
Vertical Support
Rod To Be
Installed Plumb
Swivel with Bolt End Sized To Fit
Metal Deck Hanger And Hex Nut End
Sized To Fit Vertical Support Rod

Notice:
All Such Conditions Shall Be Engineered By Others. Engineering Shall Account For
Applicable Field Conditions And Geometry, Including But Not Limited To, Prying,
Eccentricity, Tension And Shear Interaction, Etc. Swivel Components Similar To, And/Or
Other Than That Depicted Shall Be Identified Within Engineering By Others.

~ BADGER INDUSTRIES ~
Sloped Deck Notice
SDN (Elev. View) - (Not To Scale) - (Read MDH General Notice Prior To Use)
~ INSTALLATION DETAIL ~
10/17/17

(1 Of 2)
BADGER INDUSTRIES
No-Drill™Hanger
Patent Pending

(TYP.) Groove In Web Of Steel Deck SAME


FLUTE VALLEY

Strut Or Other Span Member


With Load Placement
Engineered By Others
PLAN VIEW

(2 Of 2)
BADGER INDUSTRIES
No-Drill™Hanger
Patent Pending

(1 Of 2)
BADGER INDUSTRIES
No-Drill™Hanger
Patent Pending
(TYP.) Groove In Web Of Steel Deck

SAME
FLUTE
VALLEY
Strut Or Other Span Member
With Load Placement
Engineered By Others
PLAN VIEW

(2 Of 2)
BADGER INDUSTRIES
No-Drill™Hanger
Patent Pending

~ BADGER INDUSTRIES ~
Double Hangers Same Flute - Plan View
DSF-PV (Plan Views) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

( 1 Or More)
ADJACENT FLUTE VALLEY
PLAN VIEW

(1 Of 2) (2 Of 2)
(TYP.) Groove In Web Of Steel Deck

(TYP.) Groove In Web Of Steel Deck


BADGER INDUSTRIES BADGER INDUSTRIES
No-Drill™Hanger No-Drill™Hanger
Patent Pending Patent Pending

Multiple Square Strut Washers Used


As Spacers To Develop An Off-Set Strut Or
Gap Between Concrete Filled Steel Other Span
Deck And Strut Span Member (TYP.) Member
With Load Multiple Square Strut Washers Used
Placement As Spacers To Develop An Off-Set
Engineered Gap Between Concrete Filled Steel
By Others Deck And Strut Span Member (TYP.)

(1 Of 2) (1 Of 2)
BADGER INDUSTRIES BADGER INDUSTRIES
No-Drill™Hanger No-Drill™Hanger
Patent Pending Patent Pending

~ BADGER INDUSTRIES ~
Double Hangers Adjacent Flutes - Plan View
DAF-PV (Plan Views) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
10/17/17

PLW2™or W2 FORMLOK™
2" Deep Deck
Galvanized or Phosphatized/Painted
VERCO DECKING, INC. www.vercodeck.com

Dimensions

5" 7" 12"

2"

5"
36"

Trade Supports - Per NUSIG / Badger Industries Installation Details


GRAVITY: SEISMIC:
MDH-W2VTR MDH-SV
MDH-W2CS38-0
MDH-W2CS38-90
MDH-W2CS38-180
MDH-W2DAF12
MDH-W2DSF38
MDH-W2DSF12
MDH-W2VW
MDH-W2VWC
MDH-W2AW
MDH-W2AWC
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Shall Face Down
Detail (MDH-W2VTR)
BADGER INDUSTRIES Verco W2 BADGER INDUSTRIES
No-Drill™Hanger Concrete Filled
Steel Decking [MDH3812] Wedge End
Part # [MDH3812] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum (ASD) (1/2"-13) Hex Nut With Patent Pending In Steel Decking
Gravity Load Capacity Threaded
AISI, MSS-SP58, IBC, CBC,
309 lbs. Shaft With
Threaded
Barrel [MDH3812] [MDH3812]
OSHPD & COLA Compliant Wedge Lock 3/8"-16 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Or Rods Installation
Installed Or Abandoned 2 in.
Anchorages Or Inserts For Gravity Vertical Support Load Flat Surface
Wedge End Can Be Installed In Either Or Both Shall Face
Minimum Distance On Threaded Shaft Shall Holes. Total Accumulated Loads Down
From Outside Edge Of A 2 in. Be Aligned With Groove When (2) Threaded Rods Are
Grout Filled Hole In Steel Decking Installed In The Same [MDH3812] Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Not Exceed Listed Maximum End View
203 Table 12.1 listed required loads, the Capacity Per Chart Gravity Load
maximum NFPA-13 single hanger pipe
size shall be (4") inch with a maximum of
(1) - 3/8" diameter vertical support rod
BADGER INDUSTRIES No-Drill™ [MDH3812]
installed in the depicted 3/8"-16 hole. Fits (1/4", 3/8" & 1/2") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. For 1/4" Threaded Rod Size, Install 1/4" Rod
Through 3/8"-16 Hole In [MDH] And Secure With Double Hex Nuts. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Threaded Rod
MDH-W2VTR
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

~ BADGER INDUSTRIES ~ BADGER INDUSTRIES


Detail (MDH-W2CS38-0) Badger [MDH3812]
Torque-Off
BADGER INDUSTRIES Verco W2 (1/2"-13) Hex Nut With No-Drill™Hanger
Concrete Filled
No-Drill™Hanger Steel Decking Threaded Threaded
Patent Pending
Part # [MDH3812] Shaft With Barrel [MDH3812] 1/2"-13
Installations
Wedge Lock [MDH3812] Hole Not Used For
Maximum (ASD) End Washer 3/8"-16 Hole This Detail
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
309 lbs. Multiple Square Strut
Washers Used As
OSHPD & COLA Compliant
Spacers To Develop
Minimum Concrete An Off-Set Gap
Edge Distance 4 in. Between Steel Deck
[MDH3812] And Strut Member
Minimum Between Body Wedge
[MDH3812] Spacing 2 in.
End View 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From 12 Ga. 1-5/8"x1-5/8" (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Installed Or Abandoned 2 in. Square
Strut With Maximum Strut
Anchorages Or Inserts (9/16"x1-1/8" x 2" o.c.) Washers
Minimum Distance Slotted Back Openings. Spacers, (TYP.) Strut Member Conn.,
From Outside Edge Of A 2 in. Per Detail (TYP.) To Center-most (3/8"-16) Hole
Grout Filled Hole (MDH-W2CS38-180) Of (1) [MDH3812] No-Drill™
Cantilevered Strut Can Min. Hanger With (3/8") Tap Bolt Min.
NOTE: For compliance with 2015 Be Orientated 180º
ANSI/UL 203 Table 12.1 listed required (1") And Square Strut Washer (1")
From That Depicted.
loads, the maximum NFPA-13 single For All Other Orientations Max. (4-1/2")
hanger pipe size shall be (4") inch with a Cantilever Greater
Load To End
See Detail
maximum of (1) vertical support threaded Than (4-1/2") Shall Be
(MDHU-W2CS38-90) Of Cantilevered
rod per depicted [MDH3812] assembly. Engineered By Others
Body Wedge End View Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Cantilevered Strut With Spacers
MDH-W2CS38-0
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down
~ BADGER INDUSTRIES ~ Wedge End On
Detail (MDH-W2CS38-90) Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
BADGER INDUSTRIES Verco W2 Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Torque-Off
Concrete Filled
No-Drill™Hanger Steel Decking Hex Nut With No-Drill™Hanger In Steel Decking
Part # [MDH3812] Installations Threaded
Patent Pending
(1/2"-13) Barrel [MDH3812] 1/2"-13
Maximum (ASD) Threaded Shaft Lock [MDH3812] Hole Not Used For
Gravity Load Capacity 3/8"-16 Hole This Detail
AISI, MSS-SP58, IBC, CBC,
162 lbs. With Wedge
End
Washer

OSHPD & COLA Compliant


Minimum Concrete
Edge Distance 4 in.
12 Ga. 1-5/8"x1-5/8" [MDH3812] Body Wedge End For Proper
Minimum Between
[MDH3812] Spacing 2 in. Strut With Maximum Installation
(9/16"x1-1/8" x 2" o.c.) Flat Surface
Minimum Distance From Slotted Back Openings. 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Shall Face
Installed Or Abandoned 2 in. Cantilevered Strut Can (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Anchorages Or Inserts Be Rotated 360º About
Its Connection To
Body Wedge
Minimum Distance [MDH3812] No-Drill™ End View
From Outside Edge Of A 2 in. Body Wedge
Hanger, Provided Strut Min. Min.
Grout Filled Hole
Does Not Contact Steel
End View
(1") (1")
NOTE: For compliance with 2015 Decking. If Needed Add
Max. (4-1/2")
ANSI/UL 203 Table 12.1 listed required Square Strut Washers (TYP.) Strut Member Connected To Center-most
loads, the maximum NFPA-13 single Between Strut And [MDH] (3/8"-16) Hole Of (1) [MDH3812] No-Drill™Hanger
hanger pipe size shall be (3") inch with a To Develop An Off-Set Load To End With (3/8") Tap Bolt And Square Strut Washer
maximum of (1) vertical support threaded Gap Between Steel Of Cantilevered
rod per depicted [MDH3812] assembly. Deck And Strut Member Strut Member Cantilever Greater Than (4-1/2")
Shall Be Engineered By Others

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Cantilevered Strut
MDH-W2CS38-90
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper Installation
Square Strut Washers Only Required If
Flat Surface Shall Face
End Of Strut Extends Beyond Steel Deck
Down

~ BADGER INDUSTRIES ~ BADGER INDUSTRIES


Detail (MDH-W2CS38-180) Badger [MDH3812]
Torque-Off
BADGER INDUSTRIES Verco W2 (1/2"-13) Hex Nut With No-Drill™Hanger
Concrete Filled
No-Drill™Hanger Steel Decking Threaded Threaded
Patent Pending
Part # [MDH3812] Shaft With Barrel [MDH3812] 1/2"-13
Installations
Wedge Lock [MDH3812] Hole Not Used For
Maximum (ASD) End Washer 3/8"-16 Hole This Detail
Gravity Load Capacity [MDH3812]
AISI, MSS-SP58, IBC, CBC,
309 lbs. Threaded
OSHPD & COLA Compliant Shaft Wedge
End View
Minimum Concrete
Edge Distance 4 in. Multiple Square Strut Washers Used As Spacers To Develop
An Off-Set Gap Between Steel Deck And Strut Member Square Strut
Minimum Between Washers Spacers,
[MDH3812] Spacing 2 in. (TYP.)
12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Per Detail
Installed Or Abandoned 2 in. (MDH-W2CS38-0)
Anchorages Or Inserts
Cantilevered Strut
Minimum Distance (TYP.) Strut Member Conn., Can Be Orientated
From Outside Edge Of A 2 in. To Center-most (3/8"-16) Hole 180º From That
Grout Filled Hole Of (1) [MDH3812] No-Drill™ Depicted.
Min. Hanger With (3/8") Tap Bolt Min. For All Other
NOTE: For compliance with 2015 And Square Strut Washer Orientations
ANSI/UL 203 Table 12.1 listed required (1") (1")
See Detail
loads, the maximum NFPA-13 single Max. (4-1/2")
(MDH-W2CS38-90)
hanger pipe size shall be (2-1/2") inch with Load To End
Cantilever Greater
a maximum of (1) vertical support threaded Than (4-1/2") Shall Be
Of Cantilevered
rod per depicted [MDH3812] assembly. Engineered By Others
Strut Member Shaft Wedge End View

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Cantilevered Strut With Spacers
MDH-W2CS38-180
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or VERCO - PLW2,


Normal Weight Concrete VERCO - W2 FORMLOK™
(f’c Min = 3,000 psi) Steel Decking
Steel Steel
Deck Deck
Groove Groove
(TYP.) (TYP.)

Off-Set Gap
Steel
BADGER INDUSTRIES BADGER INDUSTRIES Steel
Decking [MDH3812] 12 Ga. 1-5/8"x1-5/8" Strut With Maximum [MDH3812] Decking
Minimum No-Drill™Hanger (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings No-Drill™Hanger Minimum
20 Ga. 20 Ga.

~ BADGER INDUSTRIES ~ Multiple Square Strut Washers Used


Detail (MDH-W2DAF12) As Spacers To Develop An Off-Set
Gap Between Concrete Filled Steel
BADGER INDUSTRIES Verco W2 EQ. EQ.
Deck And Strut Span Member (TYP.)
Concrete Filled
No-Drill™Hanger Steel Decking Min. 1/2 Flute Min. 1/2 Flute (TYP.) Strut Member Connected To Wedge End
Part # [MDH3812] Installations (1/2"-13) Hole On Each Of (2) [MDH3812] No-Drill™
Load To Center Span Hangers With (1/2") Bolt And Square Strut Washer
Maximum (ASD)
Gravity Load Capacity Of Strut Member
AISI, MSS-SP58, IBC, CBC,
856 lbs. Capacity Of Strut See Detail (DAF-PV)
OSHPD & COLA Compliant Span Member And BADGER INDUSTRIES
Conn., Of Threaded
Minimum Concrete
4 in. Rod To Strut Shall Be Badger
[MDH3812] Body Wedge
Edge Distance End View
Engineered By Others Torque-Off No-Drill™Hanger Wedge End
Minimum Between Hex Nut With
[MDH3812] Spacing 4 in. Threaded
Patent Pending On Body Shall Be
Barrel Aligned With Groove
(1/2"-13)
Minimum Distance From Lock [MDH3812] 3/8"-16 Hole In Steel Decking
Threaded Shaft
Installed Or Abandoned 2 in. With Wedge Washer Not Used For This Conn.
Anchorages Or Inserts
End
Minimum Distance
From Outside Edge Of A 2 in.
Grout Filled Hole
NOTE: For compliance with 2015 ANSI/UL For Proper
203 Table 12.1 listed required loads, the Installation
maximum NFPA-13 single hanger pipe Wedge End On Threaded [MDH3812] Flat Surface
size shall be (6") inch with a maximum of Shaft Shall Be Aligned With 1/2"-13 Hole Shall Face
(1) vertical support threaded rod per Groove In Steel Decking Used For This Down
depicted double [MDH3812] assembly. Connection

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH]. Check For Off-Set Gap Between Steel
Decking And Strut Member.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Adjacent Flutes
MDH-W2DAF12
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface See Detail (DSF-PV)
Shall Face Down
Detail (MDH-W2DSF38) Wedge End On
BADGER INDUSTRIES Verco W2 Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
No-Drill™Hanger Concrete Filled
Steel Decking Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Part # [MDH3812] Torque-Off
Installations
Hex Nut With No-Drill™Hanger In Steel Decking
Maximum (ASD) Threaded
Patent Pending
Gravity Load Capacity (1/2"-13) Barrel [MDH3812] 1/2"-13
AISI, MSS-SP58, IBC, CBC,
856 lbs. Threaded Shaft Lock [MDH3812] Hole Not Used For
OSHPD & COLA Compliant With Wedge Washer 3/8"-16 Hole This Listed Capacity
End
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 4 in. Capacity Of Strut
For Proper
Span Member And
Installation
Minimum Distance From Conn., Of Threaded
Flat Surface
Installed Or Abandoned 2 in. Rod To Strut Shall
Shall Face
Anchorages Or Inserts Be Engineered By 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
(9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Others
Minimum Distance
From Outside Edge Of A 2 in. Body Wedge
(TYP.) Strut Member
Grout Filled Hole Connected To Center-most Body Wedge End View
NOTE: For compliance with 2015 ANSI/UL (3/8"-16) Hole On Each Of End View For Connections
203 Table 12.1 listed required loads, the (2) [MDH3812] No-Drill™ EQ. EQ. To (1/2"-13) Hole
maximum NFPA-13 single hanger pipe Hangers With (3/8") Bolt Min. (2") Min. (2") See Badger Detail
size shall be (6") inch with a maximum of And Square Strut Washer (MDH-W2DSF12)
(1) vertical support threaded rod per Which Has A Lower
depicted double [MDH3812] assembly. Load To Center Span Maximum Capacity
Of Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Same Flute Valley
MDH-W2DSF38
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
See Detail (DSF-PV)
Shall Face Down
Detail (MDH-W2DSF12) Wedge End On
BADGER INDUSTRIES Verco W2 Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
No-Drill™Hanger Concrete Filled
Steel Decking Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Part # [MDH3812] Torque-Off
Installations
Hex Nut With No-Drill™Hanger In Steel Decking
Maximum (ASD) Threaded
Patent Pending
Gravity Load Capacity (1/2"-13) Barrel [MDH3812]
AISI, MSS-SP58, IBC, CBC,
619 lbs. Threaded Shaft Lock [MDH3812] 1/2"-13 Hole
OSHPD & COLA Compliant With Wedge Washer 3/8"-16 Hole
End
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 4 in. Capacity Of Strut
For Proper
Span Member And
Installation
Minimum Distance From Conn., Of Threaded
Flat Surface
Installed Or Abandoned 2 in. Rod To Strut Shall
Shall Face
Anchorages Or Inserts Be Engineered By 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
(9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Others
Minimum Distance
From Outside Edge Of A 2 in. (TYP.) Strut Member
Body Wedge
Grout Filled Hole Connected To Wedge End Body Wedge End View
NOTE: For compliance with 2015 ANSI/UL (1/2"-13) Hole On Each Of End View For Connections
203 Table 12.1 listed required loads, the (2) [MDH3812] No-Drill™ EQ. EQ. To (3/8"-16) Hole
maximum NFPA-13 single hanger pipe Hangers With (1/2") Bolt Min. (2") Min. (2") See Badger Detail
size shall be (5") inch with a maximum of And Square Strut Washer (MDH-W2DSF38)
(1) vertical support threaded rod per
depicted double [MDH3812] assembly. Load To Center Span
Of Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Same Flute Valley
MDH-W2DSF12
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W2VW) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W2 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
170 lbs.
COLA Compliant
For Proper
Minimum Concrete Installation
Edge Distance 4 in. Flat Surface
Wedge End 12 Gauge ASTM A641 Wire
Installed Through 3/8" Hole Shall Face
Minimum Between On Threaded Shaft
[MDH3812] Spacing 2 in. Shall Be Aligned With In [MDH3812] With Loop Down
Groove In Steel Decking Return Tight To Outside Of
Minimum Distance From [MDH3812] Body, See End
Installed Or Abandoned 2 in. View
Anchorages Or Inserts
Minimum Distance Body Wedge
From Outside Edge Of A 2 in. End View
Grout Filled Hole Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed Through (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Wire No Clip
MDH-W2VW
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
On Body Shall Be
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger Aligned With Groove
Torque-Off
Detail (MDH-W2VWC) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W2 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
166 lbs.
COLA Compliant
For Proper
Minimum Concrete 90º Wire Clip Bolted To Badger Installation
Edge Distance 4 in. [MDH3812] With 3/8"x1" Bolt And Flat Surface
Wedge End Round Washer, Tightened Hand Shall Face
Minimum Between On Threaded Shaft Shall Tight Plus (1/8) Turn. Wire Clip
[MDH3812] Spacing 2 in. Be Aligned With Groove
Down
Assembly Can Be Rotated In Plan
In Steel Decking (0º to 360º) From That Depicted Body Wedge
Minimum Distance From
Installed Or Abandoned 2 in. End View
12 Gauge
Anchorages Or Inserts ASTM A641
Minimum Distance Wire
From Outside Edge Of A 2 in.
Grout Filled Hole
Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed At (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Vertical Wire With Clip
MDH-W2VWC
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W2AW) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W2 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
130 lbs.
COLA Compliant
Minimum Concrete Load 05º- 45º
Edge Distance 4 in. To Wire From
Wedge End 45º- 85º Horiz
Minimum Between On Threaded Shaft Shall From Body Wedge
[MDH3812] Spacing 2 in. Be Aligned With Groove 12 Gauge ASTM A641 Wire Vert End View
In Steel Decking Installed Through 3/8" Hole
Minimum Distance From In [MDH3812] With Loop
Installed Or Abandoned 2 in. Return Tight To Outside Of
Anchorages Or Inserts
W d

[MDH3812] Body, See End


To Loa
ire

Minimum Distance View


From Outside Edge Of A 2 in.
Grout Filled Hole
Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed Through (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Angled Wire No Clip
MDH-W2AW
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W2AWC) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W2 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
130 lbs.
COLA Compliant
Minimum Concrete 45º Wire Clip Bolted To Badger 30º- 45º
Edge Distance 4 in. [MDH3812] With 3/8"x1" Bolt And From Horiz
Wedge End Round Washer, Tightened Hand Tight
Minimum Between On Threaded Shaft Shall Plus (1/8) Turn. Wire Clip Assembly
Body Wedge
[MDH3812] Spacing 2 in. Be Aligned With Groove End View
Can Be Rotated In Plan (0º to 360º)
In Steel Decking From That Depicted. 45º Wire Clip
Minimum Distance From ad
Installed Or Abandoned 2 in. Used For Depicted Range Of Angles, Lo ire
See End View o W 45º- 60º
Anchorages Or Inserts T From Vert
W d
To Loa
ire

Minimum Distance 12 Gauge


From Outside Edge Of A 2 in. ASTM A641
Grout Filled Hole Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed At (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Deck Angled Wire With Clip
MDH-W2AWC
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

VERCO - PLW2,
Sand-Lightweight Or
VERCO - W2 FORMLOK™
Normal Weight Concrete
Or
(f’c Min = 3,000 psi)
VERCO - PLW3,
VERCO - W3 FORMLOK™
Steel Steel Decking Steel Deck
Decking Groove
Minimum (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Shall Face Down
Detail (MDH-SV)
BADGER INDUSTRIES Verco W2 / W3 BADGER INDUSTRIES
No-Drill™Hanger Concrete Filled
Steel Decking [MDH3812] Wedge End
Part # [MDH3812] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum FpT / FpC (1/2"-13) Hex Nut With Patent Pending In Steel Decking
Gravity + Seismic 255 lbs. (ASD) Threaded Threaded
AISI, IBC, CBC, City Of L.A. 382 lbs. (LRFD) Shaft With Barrel [MDH3812] [MDH3812]
COLA Compliant Wedge Lock 3/8"-16 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH3812] Spacing 4-1/2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Installation
Installed Or Abandoned 1-1/4 in.
Anchorages Or Inserts For Seismic Vertical Flat Surface
Wedge End Support Load Can Be Shall Face
Minimum Distance On Threaded Shaft Shall Installed In Either Hole. Down
From Outside Edge Of A 1 in. Be Aligned With Groove Compression Capacity
Grout Filled Hole In Steel Decking Of Vertical Support Rod Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Be Engineered End View
By Others FpT / FpC
203 Table 12.1 listed required loads, the Per Chart
maximum NFPA-13 single hanger pipe size
shall be (4") inch with a maximum of (1) - 3/8"
diameter vertical support rod installed in the
BADGER INDUSTRIES No-Drill™ [MDH3812]
depicted 3/8"-16 hole. Fits (3/8" & 1/2") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Or W3 Deck Seismic Vertical
MDH-SV
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
10/17/17

PLW3™or W3 FORMLOK™
3" Deep Deck
Galvanized or Phosphatized/Painted
VERCO DECKING, INC.www.vercodeck.com

Dimensions

4½" 7½" 12"

3"

4½"
36"

Trade Supports - Per NUSIG / Badger Industries Installation Details


GRAVITY: GRAVITY: SEISMIC:
MDH-W3VTR MDHU-W3VTR MDH-SV
MDH-W3CS38-0 MDHU-W3CS-0 MDH1258-SV
MDH-W3CS38-90 MDHU-W3CS-90 MDH5834-SV
MDH-W3CS38-180 MDHU-W3CS-180 MDH1258-PAR
MDH-W3DAF12 MDHU-W3DAF MDH1258-PS
MDH-W3DSF38 MDHU-W3DSF
MDH-W3DSF12 MDH1258-W3VTR
MDH-W3VW MDH5834-W3VTR
MDH-W3VWC
MDH-W3AW
MDH-W3AWC
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Shall Face Down
Detail (MDH-W3VTR)
BADGER INDUSTRIES Verco W3 BADGER INDUSTRIES
No-Drill™Hanger Concrete Filled
Steel Decking [MDH3812] Wedge End
Part # [MDH3812] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum (ASD) (1/2"-13) Hex Nut With Patent Pending In Steel Decking
Gravity Load Capacity Threaded
AISI, MSS-SP58, IBC, CBC,
309 lbs. Shaft With
Threaded
Barrel [MDH3812] [MDH3812]
OSHPD & COLA Compliant Wedge Lock 3/8"-16 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Or Rods Installation
Installed Or Abandoned 2 in.
Anchorages Or Inserts For Gravity Vertical Support Load Flat Surface
Wedge End Can Be Installed In Either Or Both Shall Face
Minimum Distance On Threaded Shaft Shall Holes. Total Accumulated Loads Down
From Outside Edge Of A 2 in. Be Aligned With Groove When (2) Threaded Rods Are
Grout Filled Hole In Steel Decking Installed In The Same [MDH3812] Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Not Exceed Listed Maximum End View
203 Table 12.1 listed required loads, the Capacity Per Chart Gravity Load
maximum NFPA-13 single hanger pipe
size shall be (4") inch with a maximum of
(1) - 3/8" diameter vertical support rod
BADGER INDUSTRIES No-Drill™ [MDH3812]
installed in the depicted 3/8"-16 hole. Fits (1/4", 3/8" & 1/2") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. For 1/4" Threaded Rod Size, Install 1/4" Rod
Through 3/8"-16 Hole In [MDH] And Secure With Double Hex Nuts. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Threaded Rod
MDH-W3VTR
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

~ BADGER INDUSTRIES ~ BADGER INDUSTRIES


Detail (MDH-W3CS38-0) Badger [MDH3812]
Torque-Off
BADGER INDUSTRIES Verco W3 (1/2"-13) Hex Nut With No-Drill™Hanger
Concrete Filled
No-Drill™Hanger Steel Decking Threaded Threaded
Patent Pending
Part # [MDH3812] Shaft With Barrel [MDH3812] 1/2"-13
Installations
Wedge Lock [MDH3812] Hole Not Used For
Maximum (ASD) End Washer 3/8"-16 Hole This Detail
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
309 lbs. Multiple Square Strut
Washers Used As
OSHPD & COLA Compliant
Spacers To Develop
Minimum Concrete An Off-Set Gap
Edge Distance 4 in. Between Steel Deck
[MDH3812] And Strut Member
Minimum Between Body Wedge
[MDH3812] Spacing 2 in.
End View 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From 12 Ga. 1-5/8"x1-5/8" (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Installed Or Abandoned 2 in. Square
Strut With Maximum Strut
Anchorages Or Inserts
(9/16"x1-1/8" x 2" o.c.) Washers
Minimum Distance Slotted Back Openings. Spacers, (TYP.) Strut Member Conn.,
From Outside Edge Of A 2 in. Per Detail (TYP.) To Center-most (3/8"-16) Hole
Grout Filled Hole (MDH-W3CS38-180) Of (1) [MDH3812] No-Drill™
Cantilevered Strut Can Min. Hanger With (3/8") Tap Bolt Min.
NOTE: For compliance with 2015 Be Orientated 180º
ANSI/UL 203 Table 12.1 listed required (1") And Square Strut Washer (1")
From That Depicted.
loads, the maximum NFPA-13 single Max. (4-1/2")
For All Other Orientations
hanger pipe size shall be (3-1/2") inch with Cantilever Greater
Load To End
See Detail
a maximum of (1) vertical support threaded Than (4-1/2") Shall Be
(MDHU-W3CS38-90) Of Cantilevered
rod per depicted [MDH3812] assembly. Engineered By Others
Body Wedge End View Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Cantilevered Strut With Spacers
MDH-W3CS38-0
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down
~ BADGER INDUSTRIES ~ Wedge End On
Detail (MDH-W3CS38-90) Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
BADGER INDUSTRIES Verco W3 Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Torque-Off
Concrete Filled
No-Drill™Hanger Steel Decking Hex Nut With No-Drill™Hanger In Steel Decking
Part # [MDH3812] Installations Threaded
Patent Pending
(1/2"-13) Barrel [MDH3812] 1/2"-13
Maximum (ASD) Threaded Shaft Lock [MDH3812] Hole Not Used For
Gravity Load Capacity 3/8"-16 Hole This Detail
AISI, MSS-SP58, IBC, CBC,
162 lbs. With Wedge
End
Washer

OSHPD & COLA Compliant


Minimum Concrete
Edge Distance 4 in.
12 Ga. 1-5/8"x1-5/8" [MDH3812] Body Wedge End For Proper
Minimum Between
[MDH3812] Spacing 2 in. Strut With Maximum Installation
(9/16"x1-1/8" x 2" o.c.) Flat Surface
Minimum Distance From Slotted Back Openings. 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Shall Face
Installed Or Abandoned 2 in. Cantilevered Strut Can (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Anchorages Or Inserts Be Rotated 360º About
Body Wedge
Its Connection To
Minimum Distance [MDH3812] No-Drill™ End View
From Outside Edge Of A 2 in. Body Wedge
Hanger, Provided Strut Min. Min.
Grout Filled Hole
Does Not Contact Steel
End View
(1") (1")
NOTE: For compliance with 2015 Decking. If Needed Add
Max. (4-1/2")
ANSI/UL 203 Table 12.1 listed required Square Strut Washers (TYP.) Strut Member Connected To Center-most
loads, the maximum NFPA-13 single Between Strut And [MDH] (3/8"-16) Hole Of (1) [MDH3812] No-Drill™Hanger
hanger pipe size shall be (3") inch with a To Develop An Off-Set Load To End With (3/8") Tap Bolt And Square Strut Washer
maximum of (1) vertical support threaded Gap Between Steel Of Cantilevered
rod per depicted [MDH3812] assembly. Deck And Strut Member Strut Member Cantilever Greater Than (4-1/2")
Shall Be Engineered By Others

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Cantilevered Strut
MDH-W3CS38-90
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper Installation
Square Strut Washers Only Required If
Flat Surface Shall Face
End Of Strut Extends Beyond Steel Deck
Down

~ BADGER INDUSTRIES ~ BADGER INDUSTRIES


Detail (MDH-W3CS38-180) Badger [MDH3812]
Torque-Off
BADGER INDUSTRIES Verco W3 (1/2"-13) Hex Nut With No-Drill™Hanger
Concrete Filled
No-Drill™Hanger Steel Decking Threaded Threaded
Patent Pending
Part # [MDH3812] Shaft With Barrel [MDH3812] 1/2"-13
Installations
Wedge Lock [MDH3812] Hole Not Used For
Maximum (ASD) End Washer 3/8"-16 Hole This Detail
Gravity Load Capacity [MDH3812]
AISI, MSS-SP58, IBC, CBC,
309 lbs. Threaded
OSHPD & COLA Compliant Shaft Wedge
End View
Minimum Concrete
Edge Distance 4 in. Multiple Square Strut Washers Used As Spacers To Develop
An Off-Set Gap Between Steel Deck And Strut Member Square Strut
Minimum Between Washers Spacers,
[MDH3812] Spacing 2 in. (TYP.)
12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Per Detail
Installed Or Abandoned 2 in. (MDH-W3CS38-0)
Anchorages Or Inserts
Cantilevered Strut
Minimum Distance (TYP.) Strut Member Conn., Can Be Orientated
From Outside Edge Of A 2 in. To Center-most (3/8"-16) Hole 180º From That
Grout Filled Hole Of (1) [MDH3812] No-Drill™ Depicted.
Min. Hanger With (3/8") Tap Bolt Min. For All Other
NOTE: For compliance with 2015 And Square Strut Washer Orientations
ANSI/UL 203 Table 12.1 listed required (1") (1")
See Detail
loads, the maximum NFPA-13 single Max. (4-1/2")
(MDH-W3CS38-90)
hanger pipe size shall be (2-1/2") inch with Load To End Cantilever Greater
a maximum of (1) vertical support threaded Than (4-1/2") Shall Be
Of Cantilevered
rod per depicted [MDH3812] assembly. Engineered By Others
Strut Member Shaft Wedge End View

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install [MDH] Prior To Connection Of Strut To
[MDH]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Cantilevered Strut With Spacers
MDH-W3CS38-180
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or VERCO - PLW3,


Normal Weight Concrete VERCO - W3 FORMLOK™
(f’c Min = 3,000 psi) Steel Decking
Steel Steel
Deck Deck
Groove Groove
(TYP.) (TYP.)

Off-Set Gap
Steel
BADGER INDUSTRIES BADGER INDUSTRIES Steel
Decking [MDH3812] 12 Ga. 1-5/8"x1-5/8" Strut With Maximum [MDH3812] Decking
Minimum No-Drill™Hanger (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings No-Drill™Hanger Minimum
20 Ga. 20 Ga.

~ BADGER INDUSTRIES ~ Multiple Square Strut Washers Used


Detail (MDH-W3DAF12) As Spacers To Develop An Off-Set
Gap Between Concrete Filled Steel
BADGER INDUSTRIES Verco W3 EQ. EQ.
Deck And Strut Span Member (TYP.)
Concrete Filled
No-Drill™Hanger Steel Decking Min. 1/2 Flute Min. 1/2 Flute (TYP.) Strut Member Connected To Wedge End
Part # [MDH3812] Installations (1/2"-13) Hole On Each Of (2) [MDH3812] No-Drill™
Load To Center Span Hangers With (1/2") Bolt And Square Strut Washer
Maximum (ASD)
Gravity Load Capacity Of Strut Member
AISI, MSS-SP58, IBC, CBC,
856 lbs. Capacity Of Strut See Detail (DAF-PV)
OSHPD & COLA Compliant Span Member And BADGER INDUSTRIES
Conn., Of Threaded Body Wedge
Minimum Concrete
4 in. Rod To Strut Shall Be Badger
[MDH3812]
Edge Distance End View
Engineered By Others Torque-Off No-Drill™Hanger Wedge End
Minimum Between Hex Nut With
[MDH3812] Spacing 4 in. Threaded
Patent Pending On Body Shall Be
Barrel Aligned With Groove
(1/2"-13)
Minimum Distance From Lock [MDH3812] 3/8"-16 Hole In Steel Decking
Threaded Shaft
Installed Or Abandoned 2 in. With Wedge Washer Not Used For This Conn.
Anchorages Or Inserts
End
Minimum Distance
From Outside Edge Of A 2 in.
Grout Filled Hole
NOTE: For compliance with 2015 ANSI/UL For Proper
203 Table 12.1 listed required loads, the Installation
maximum NFPA-13 single hanger pipe Wedge End On Threaded [MDH3812] Flat Surface
size shall be (6") inch with a maximum of Shaft Shall Be Aligned With 1/2"-13 Hole Shall Face
(1) vertical support threaded rod per Groove In Steel Decking Used For This Down
depicted double [MDH3812] assembly. Connection

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH]. Check For Off-Set Gap Between Steel
Decking And Strut Member.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Adjacent Flutes
MDH-W3DAF12
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface See Detail (DSF-PV)
Shall Face Down
Detail (MDH-W3DSF38) Wedge End On
BADGER INDUSTRIES Verco W3 Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
No-Drill™Hanger Concrete Filled
Steel Decking Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Part # [MDH3812] Torque-Off
Installations
Hex Nut With No-Drill™Hanger In Steel Decking
Maximum (ASD) Threaded
Patent Pending
Gravity Load Capacity (1/2"-13) Barrel [MDH3812] 1/2"-13
AISI, MSS-SP58, IBC, CBC,
856 lbs. Threaded Shaft Lock [MDH3812] Hole Not Used For
OSHPD & COLA Compliant With Wedge Washer 3/8"-16 Hole This Listed Capacity
End
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 4 in. Capacity Of Strut
For Proper
Span Member And
Installation
Minimum Distance From Conn., Of Threaded
Flat Surface
Installed Or Abandoned 2 in. Rod To Strut Shall
Shall Face
Anchorages Or Inserts Be Engineered By 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
(9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Others
Minimum Distance
From Outside Edge Of A 2 in. (TYP.) Strut Member
Body Wedge
Grout Filled Hole Connected To Center-most Body Wedge End View
NOTE: For compliance with 2015 ANSI/UL (3/8"-16) Hole On Each Of End View For Connections
203 Table 12.1 listed required loads, the (2) [MDH3812] No-Drill™ EQ. EQ. To (1/2"-13) Hole
maximum NFPA-13 single hanger pipe Hangers With (3/8") Bolt Min. (2") Min. (2") See Badger Detail
size shall be (6") inch with a maximum of And Square Strut Washer (MDH-W3DSF12)
(1) vertical support threaded rod per Which Has A Lower
depicted double [MDH3812] assembly. Load To Center Span Maximum Capacity
Of Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Same Flute Valley
MDH-W3DSF38
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
See Detail (DSF-PV)
Shall Face Down
Detail (MDH-W3DSF12) Wedge End On
BADGER INDUSTRIES Verco W3 Threaded Shaft Shall Be BADGER INDUSTRIES Wedge End
Aligned With Groove In
No-Drill™Hanger Concrete Filled
Steel Decking Steel Decking
Badger [MDH3812] On Body Shall Be
Aligned With Groove
Part # [MDH3812] Torque-Off
Installations
Hex Nut With No-Drill™Hanger In Steel Decking
Maximum (ASD) Threaded
Patent Pending
Gravity Load Capacity (1/2"-13) Barrel [MDH3812]
AISI, MSS-SP58, IBC, CBC,
619 lbs. Threaded Shaft Lock [MDH3812] 1/2"-13 Hole
OSHPD & COLA Compliant With Wedge Washer 3/8"-16 Hole
End
Minimum Concrete
Edge Distance 4 in.
Minimum Between
[MDH3812] Spacing 4 in. Capacity Of Strut
For Proper
Span Member And
Installation
Minimum Distance From Conn., Of Threaded
Flat Surface
Installed Or Abandoned 2 in. Rod To Strut Shall
Shall Face
Anchorages Or Inserts Be Engineered By 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
(9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Down
Others
Minimum Distance
From Outside Edge Of A 2 in. (TYP.) Strut Member
Body Wedge
Grout Filled Hole Connected To Wedge End Body Wedge End View
NOTE: For compliance with 2015 ANSI/UL (1/2"-13) Hole On Each Of End View For Connections
203 Table 12.1 listed required loads, the (2) [MDH3812] No-Drill™ EQ. EQ. To (3/8"-16) Hole
maximum NFPA-13 single hanger pipe Hangers With (1/2") Bolt Min. (2") Min. (2") See Badger Detail
size shall be (5") inch with a maximum of And Square Strut Washer (MDH-W3DSF38)
(1) vertical support threaded rod per
depicted double [MDH3812] assembly. Load To Center Span
Of Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDH] Components Prior
To Connection Of Strut To Double [MDH] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Same Flute Valley
MDH-W3DSF12
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W3VW) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W3 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
170 lbs.
COLA Compliant
For Proper
Minimum Concrete Installation
Edge Distance 4 in. Flat Surface
Wedge End 12 Gauge ASTM A641 Wire
Installed Through 3/8" Hole Shall Face
Minimum Between On Threaded Shaft Shall
[MDH3812] Spacing 2 in. Be Aligned With Groove In [MDH3812] With Loop Down
In Steel Decking Return Tight To Outside Of
Minimum Distance From [MDH3812] Body, See End
Installed Or Abandoned 2 in. View
Anchorages Or Inserts
Minimum Distance Body Wedge
From Outside Edge Of A 2 in. End View
Grout Filled Hole Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed At (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Wire No Clip
MDH-W3VW
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
On Body Shall Be
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger Aligned With Groove
Torque-Off
Detail (MDH-W3VWC) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W3 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
166 lbs.
COLA Compliant
For Proper
Minimum Concrete 90º Wire Clip Bolted To Badger Installation
Edge Distance 4 in. [MDH3812] With 3/8"x1" Bolt And Flat Surface
Wedge End Round Washer, Tightened Hand Shall Face
Minimum Between On Threaded Shaft Shall Tight Plus (1/8) Turn. Wire Clip
[MDH3812] Spacing 2 in. Be Aligned With Groove
Down
Assembly Can Be Rotated In Plan
In Steel Decking (0º to 360º) From That Depicted Body Wedge
Minimum Distance From
Installed Or Abandoned 2 in. End View
12 Gauge
Anchorages Or Inserts ASTM A641
Minimum Distance Wire
From Outside Edge Of A 2 in.
Grout Filled Hole
Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed At (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Vertical Wire With Clip
MDH-W3VWC
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W3AW) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W3 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
130 lbs.
COLA Compliant
Minimum Concrete Load 05º- 45º
Edge Distance 4 in. To Wire From
Wedge End 45º- 85º Horiz
Minimum Between On Threaded Shaft Shall From Body Wedge
[MDH3812] Spacing 2 in. Be Aligned With Groove 12 Gauge ASTM A641 Wire Vert End View
In Steel Decking Installed Through 3/8" Hole
Minimum Distance From In [MDH3812] With Loop
Installed Or Abandoned 2 in. Return Tight To Outside Of
Anchorages Or Inserts
W d

[MDH3812] Body, See End


To Loa
ire

Minimum Distance View


From Outside Edge Of A 2 in.
Grout Filled Hole
Load To Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed Through (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Angled Wire No Clip
MDH-W3AW
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

BADGER INDUSTRIES
[MDH3812] Wedge End
~ BADGER INDUSTRIES ~ Badger
No-Drill™Hanger
On Body Shall Be
Torque-Off Aligned With Groove
Detail (MDH-W3AWC) (1/2"-13) In Steel Decking
Hex Nut With Patent Pending
Threaded Threaded
BADGER INDUSTRIES Verco W3 Shaft With Barrel Wedge End Hole
Concrete Filled [MDH3812]
No-Drill™Hanger Steel Decking Wedge Lock Not Used For Wire
3/8"-16 Hole
Part # [MDH3812] Installations End Washer Connections

Maximum (ASD)
Load Capacity
AISI, IBC, CBC, OSHPD &
130 lbs.
COLA Compliant
Minimum Concrete 45º Wire Clip Bolted To Badger 30º- 45º
Edge Distance 4 in. [MDH3812] With 3/8"x1" Bolt And From Horiz
Wedge End Round Washer, Tightened Hand Tight
Minimum Between On Threaded Shaft Shall Plus (1/8) Turn. Wire Clip Assembly
Body Wedge
[MDH3812] Spacing 2 in. Be Aligned With Groove End View
Can Be Rotated In Plan (0º to 360º)
In Steel Decking From That Depicted. 45º Wire Clip
Minimum Distance From ad
Installed Or Abandoned 2 in. Used For Depicted Range Of Angles, Lo ire
See End View o W 45º- 60º
Anchorages Or Inserts T From Vert
W d
To Loa
ire

Minimum Distance 12 Gauge


From Outside Edge Of A 2 in. ASTM A641
Grout Filled Hole Wire

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. Wire Can Be Installed Prior To, Or After Installation
Of Badger [MDH].
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check That Proper Wire Tie Assembly Is Installed At (3/8"-16) Hole.

~ BADGER INDUSTRIES ~
MDH3812 - Verco W3 Deck Angled Wire With Clip
MDH-W3AWC
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
~ BADGER INDUSTRIES ~ Shall Face Down
Detail (MDHU-W3VTR)
BADGER INDUSTRIES
BADGER INDUSTRIES Verco W3
[MDHU] Universal Wedge End
Concrete Filled
No-Drill™Hanger Steel Decking Badger On Body Shall Be
Part # [MDHU] Installations Torque-Off No-Drill™Hanger Aligned With Groove
(3/4"-10) Hex Nut With Patent Pending In Steel Decking
Maximum (ASD) Threaded Threaded
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
718 lbs. Shaft With
Wedge
Barrel
Lock
Slotted Opening
Strut Nut Sized To
Fit Threaded Rod
OSHPD & COLA Compliant With 3/4" Hole
End Washer
Minimum Concrete
Edge Distance 12 in.
Same Valley Minimum
Between [MDHU] Spacing 12 in.
For Proper
Minimum Distance From Installation
Installed Or Abandoned 2 in. BADGER [MDHU] Fits Flat Surface
Anchorages Or Inserts Wedge End
Shall Face
On Threaded Shaft Shall (3/8", 1/2", 5/8" & 3/4") Down
Minimum Distance Be Aligned With Groove
From Outside Edge Of A 2 in. Threaded Rod Sizes Body Wedge
In Steel Decking
Grout Filled Hole End View
NOTE: For compliance with 2015 ANSI/UL Gravity Load
203 Table 12.1 listed required loads, the
maximum NFPA-13 single hanger pipe
size shall be (5") inch.

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of
The Grooves In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until
Both Wedge Ends Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue
To Tighten The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer
Compressed, The Hex Nut Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDHU] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod With Strut Nut Connection Into [MDHU].

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Vertical Threaded Rod
MDHU-W3VTR
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down

~ BADGER INDUSTRIES ~
Detail (MDHU-W3CS-0) Badger BADGER INDUSTRIES
Torque-Off
BADGER INDUSTRIES Verco W3 (3/4"-10) Hex Nut With [MDHU]
Concrete Filled
No-Drill™Hanger Steel Decking
Threaded Threaded
No-Drill™Hanger
Shaft With Strut Nut
Part # [MDHU] Installations Barrel
Sized To
Wedge Lock Patent Pending
Maximum (ASD) End Washer Fit Bolt
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
637 lbs. Multiple Square Strut
Washers Used As
OSHPD & COLA Compliant
Spacers To Develop
Minimum Concrete An Off-Set Gap
Edge Distance 12 in. Between Steel Deck
[MDHU] And Strut Member
Same Valley Minimum Body Wedge
Between [MDHU] Spacing 12 in.
End View 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From 12 Ga. 1-5/8"x1-5/8" (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Installed Or Abandoned 2 in. Strut With Maximum Square
Anchorages Or Inserts (9/16"x1-1/8" x 2" o.c.) Strut
Slotted Back Openings. Washers
Minimum Distance Spacers, (TYP.) Strut Member
Per Detail
From Outside Edge Of A 2 in. (MDHU-W3CS-180), (TYP.) Connected To [MDHU]
Grout Filled Hole No-Drill™Hanger With (1/2")
And With Reduction In
Capacity Cantilevered Min. Diameter Bolt, Square Strut Min.
NOTE: For compliance with 2015
ANSI/UL 203 Table 12.1 listed required Strut Can Be Orientated (1") Washer And Strut Nut (1")
loads, the maximum NFPA-13 single 180º From That Depicted. Max. (4-1/2")
hanger pipe size shall be (4") inch with a For All Other Orientations Cantilever Greater
Load To End
maximum of (1) vertical support threaded See Detail (MDHU-W3CS-90) Than (4-1/2") Shall Be
Of Cantilevered
rod per depicted [MDHU] assembly. Engineered By Others
Body Wedge End View Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval From
The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel Decking.
Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away From Dented Or
Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU] Body
Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of The Grooves
In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both Wedge Ends
Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue To Tighten The Torque-
Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed, The Hex Nut
Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. Install [MDHU] Prior To Connection Of Strut To [MDHU]. Tighten
Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDHU] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDHU].

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Cantilevered Strut With Spacers
MDHU-W3CS-0
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
Shall Face Down
~ BADGER INDUSTRIES ~ Wedge End On
Detail (MDHU-W3CS-90) Threaded Shaft Shall Be Badger BADGER INDUSTRIES
Aligned With Groove In Torque-Off
BADGER INDUSTRIES Verco W3 Steel Decking Hex Nut With [MDHU]
Concrete Filled
No-Drill™Hanger Steel Decking
Threaded
Barrel
No-Drill™Hanger Strut Nut
Part # [MDHU] Installations
Lock Patent Pending Sized To
(3/4"-10) Fit Bolt
Maximum (ASD) Threaded Washer
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
170 lbs. Shaft With
Wedge End
OSHPD & COLA Compliant
Minimum Concrete
Edge Distance 12 in. [MDHU] Body
12 Ga. 1-5/8"x1-5/8"
Wedge End View
Strut With Maximum
Same Valley Minimum
Between [MDHU] Spacing 12 in. (9/16"x1-1/8" x 2" o.c.)
Slotted Back Openings.
Minimum Distance From Cantilevered Strut Can 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Installed Or Abandoned 2 in. Be Rotated 360º About (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Anchorages Or Inserts Its Connection To
[MDHU] No-Drill™
Minimum Distance
From Outside Edge Of A 2 in.
Hanger, Provided Strut Body Wedge
Does Not Contact Steel Min. Min.
Grout Filled Hole End View
Decking. If Needed Add (1") (1")
NOTE: For compliance with 2015 Square Strut Washers
Max. (4-1/2")
ANSI/UL 203 Table 12.1 listed required Between Strut And (TYP.) Strut Member Connected To [MDHU]
loads, the maximum NFPA-13 single [MDHU] To Develop An No-Drill™Hanger With (1/2") Diameter
hanger pipe size shall be (2-1/2") inch with Off-Set Gap Between Load To End Bolt, Square Strut Washer And Strut Nut
a maximum of (1) vertical support threaded Steel Deck And Strut Of Cantilevered
rod per depicted [MDHU] assembly. Member Strut Member Cantilever Greater Than (4-1/2")
Shall Be Engineered By Others

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of
The Grooves In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until
Both Wedge Ends Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue
To Tighten The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer
Compressed, The Hex Nut Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. Install [MDHU] Prior To Connection
Of Strut To [MDHU]. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDHU] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDHU].

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Cantilevered Strut
MDHU-W3CS-90
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
Square Strut Washers Only Required If For Proper Installation
End Of Strut Extends Beyond Steel Deck Flat Surface Shall Face
Down

~ BADGER INDUSTRIES ~
Detail (MDHU-W3CS-180) Badger BADGER INDUSTRIES
Torque-Off
BADGER INDUSTRIES Verco W3 (3/4"-10) Hex Nut With [MDHU]
Concrete Filled
No-Drill™Hanger Steel Decking
Threaded Threaded
No-Drill™Hanger
Shaft With Strut Nut
Part # [MDHU] Installations Barrel
Wedge Lock Patent Pending Sized To
Maximum (ASD) End Washer Fit Bolt
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
415 lbs. [MDHU]
Threaded
OSHPD & COLA Compliant Shaft Wedge
Minimum Concrete End View
Edge Distance 12 in. Multiple Square Strut Washers Used As Spacers To Develop
An Off-Set Gap Between Steel Deck And Strut Member Square Strut
Same Valley Minimum Washers Spacers,
Between [MDHU] Spacing 12 in. (TYP.)
12 Ga. 1-5/8"x1-5/8" Strut With Maximum
Minimum Distance From (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings Per Detail
Installed Or Abandoned 2 in. (MDHU-W3CS-0)
Anchorages Or Inserts Cantilevered Strut
Minimum Distance Can Be Orientated
(TYP.) Strut Member Connected 180º From That
From Outside Edge Of A 2 in. To [MDHU] No-Drill™Hanger With
Grout Filled Hole Depicted.
(1/2") Diameter Bolt, Square Strut For All Other
NOTE: For compliance with 2015 Min. Washer And Strut Nut Min.
(1") (1") Orientations
ANSI/UL 203 Table 12.1 listed required See Detail
loads, the maximum NFPA-13 single Max. (4-1/2") (MDHU-W3CS-90)
hanger pipe size shall be (4") inch with a Load To End Cantilever Greater
maximum of (1) vertical support threaded Than (4-1/2") Shall Be
Of Cantilevered
rod per depicted [MDHU] assembly. Engineered By Others
Strut Member Shaft Wedge End View

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval From
The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel Decking.
Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away From Dented Or
Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU] Body
Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of The Grooves
In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both Wedge Ends
Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue To Tighten The Torque-
Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed, The Hex Nut
Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. Install [MDHU] Prior To Connection Of Strut To [MDHU]. Tighten
Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDHU] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To [MDHU].

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Cantilevered Strut With Spacers
MDHU-W3CS-180
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or VERCO - PLW3,


Normal Weight Concrete VERCO - W3 FORMLOK™
(f’c Min = 3,000 psi) Steel Decking
Steel Steel
Deck Deck
Groove Groove
(TYP.) (TYP.)

Off-Set Gap
Steel
BADGER INDUSTRIES BADGER INDUSTRIES Steel
Decking [MDHU] 12 Ga. 1-5/8"x1-5/8" Strut With Maximum [MDHU] Decking
Minimum No-Drill™Hanger (9/16"x1-1/8" x 2" o.c.) Slotted Back Openings No-Drill™Hanger Minimum
20 Ga. 20 Ga.

~ BADGER INDUSTRIES ~ Multiple Square Strut Washers Used


Detail (MDHU-W3DAF) As Spacers To Develop An Off-Set
Gap Between Concrete Filled Steel
BADGER INDUSTRIES Verco W3 EQ. EQ.
Deck And Strut Span Member (TYP.)
Concrete Filled
No-Drill™Hanger Steel Decking Min. 1/2 Flute Min. 1/2 Flute (TYP.) Strut Member Connected To
Part # [MDHU] Installations Each Of (2) [MDHU] No-Drill™ Hangers
Load To Center Span With Minimum (1/2") Diameter Bolt
Maximum (ASD) Square Strut Washer And Strut Nut
Gravity Load Capacity Of Strut Member
AISI, MSS-SP58, IBC, CBC,
1,496 lbs. Capacity Of Strut Span Member And
OSHPD & COLA Compliant Conn., Of Threaded Rod To Strut Shall See Detail (DAF-PV)
Be Engineered By Others
Minimum Concrete
Edge Distance 12 in. Body Wedge
Badger BADGER INDUSTRIES End View
Same Valley Minimum
Between [MDHU] Spacing 12 in. Torque-Off
[MDHU] Universal
(3/4"-10) Hex Nut With Wedge End
Threaded On Body Shall Be
Minimum Distance From
Shaft With
Threaded
Barrel
No-Drill™Hanger Aligned With Groove
Installed Or Abandoned 2 in.
Anchorages Or Inserts Wedge Lock Patent Pending In Steel Decking
End Washer
Minimum Distance
From Outside Edge Of A 2 in.
Grout Filled Hole
NOTE: For compliance with 2015 ANSI/UL
203 Table 12.1 listed required loads, the For Proper
maximum NFPA-13 single hanger pipe Installation
size shall be (8") inch with a maximum of Flat Surface
(1) vertical support threaded rod per Wedge End On Threaded Shaft Shall Be
Shall Face
depicted double [MDHU] assembly. Aligned With Groove In Steel Decking
Down

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of
The Grooves In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until
Both Wedge Ends Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue
To Tighten The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer
Compressed, The Hex Nut Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDHU]
Components Prior To Connection Of Strut To Double [MDHU] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDHU]. Check For Off-Set Gap Between Steel
Decking And Strut Member.

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Vertical Adjacent Flutes
MDHU-W3DAF
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking
Steel Steel Deck Steel Deck
Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
Flat Surface
~ BADGER INDUSTRIES ~ See Detail (DSF-PV)
Shall Face Down
Detail (MDHU-W3DSF) Chisel Point End On
Threaded Shaft Shall Be Badger BADGER INDUSTRIES
BADGER INDUSTRIES Verco W3 Aligned With Groove In Torque-Off
[MDHU]
Concrete Filled Steel Decking Hex Nut With
No-Drill™Hanger Steel Decking
Part # [MDHU] Installations
Threaded
Barrel
No-Drill™Hanger
Maximum (ASD) (3/4"-10) Lock Patent Pending
Gravity Load Capacity Threaded Washer
AISI, MSS-SP58, IBC, CBC,
966 lbs. Shaft With
OSHPD & COLA Compliant Wedge End
Minimum Concrete
Edge Distance 12 in.
Capacity Of Strut
Span Member And
Same Valley Minimum
Between [MDHU] Spacing 8-1/2 in. Conn., Of Threaded
Rod To Strut Shall
Minimum Distance From Be Engineered By
Installed Or Abandoned 2 in. Others
Anchorages Or Inserts 12 Ga. 1-5/8"x1-5/8" Strut With Maximum
(9/16"x1-1/8" x 2" o.c.) Slotted Back Openings
Minimum Distance
From Outside Edge Of A 2 in. (TYP.) Strut Member
Grout Filled Hole Connected To Each Of (2) Body Wedge
[MDHU] No-Drill™ Hangers End View
NOTE: For compliance with 2015 ANSI/UL With Minimum (1/2")
203 Table 12.1 listed required loads, the EQ. EQ.
Diameter Bolt Square Strut Min. (4-1/2") Min. (4-1/2")
maximum NFPA-13 single hanger pipe
size shall be (6") inch with a maximum of Washer And Strut Nut
(1) vertical support threaded rod per
Load To Center Span
depicted double [MDHU] assembly.
Of Strut Member

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (12") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDHU], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDHU]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDHU] Body Facing Down. Overall Length Of [MDHU] Shall Be Perpendicular To The Length Of
The Grooves In The Steel Decking. Next, While Holding [MDHU] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until
Both Wedge Ends Of The [MDHU] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDHU] Body In Place With One Hand, Continue
To Tighten The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer
Compressed, The Hex Nut Loose On The Threaded Shaft And The [MDHU] Wedged Between The Opposing Steel Deck Grooves. Install Each Of The (2) [MDHU]
Components Prior To Connection Of Strut To Double [MDHU] Components. Tighten Strut Assembly Connections Hand Tight Plus (1/4) Turn.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDHU] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Strut Assembly And Connection To Each [MDHU].

~ BADGER INDUSTRIES ~
MDHU - Verco W3 Deck Vertical Same Flute Valley
MDHU-W3DSF
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Detail (MDH1258-W3VTR) Shall Face Down

BADGER INDUSTRIES Verco W3 BADGER INDUSTRIES


Concrete Filled
No-Drill™Hanger Steel Decking [MDH1258] Wedge End
Part # [MDH1258] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum (ASD) (3/4"-10) Hex Nut With Patent Pending In Steel Decking
Gravity Load Capacity
AISI, MSS-SP58, IBC, CBC,
461 lbs. Threaded
Shaft With
Threaded
Barrel [MDH1258] [MDH1258]
OSHPD & COLA Compliant Wedge Lock 5/8"-11 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH1258] Spacing 4-1/2 in.
Minimum Distance From For Proper
Installed Or Abandoned 1-1/4 in. (TYP.) Threaded Rod Or Rods Installation
Anchorages Or Inserts For Gravity Vertical Support Load Flat Surface
Wedge End Can Be Installed In Either Or Both Shall Face
Minimum Distance On Threaded Shaft Shall Holes. Total Accumulated Loads Down
From Outside Edge Of A 1 in. Be Aligned With Groove When (2) Threaded Rods Are
Grout Filled Hole In Steel Decking Installed In The Same [MDH1258] Body Wedge
NOTE: For compliance with 2015 Shall Not Exceed Listed Maximum End View
ANSI/UL 203 Table 12.1 listed required Capacity Per Chart Gravity Load
loads, the maximum NFPA-13 single
hanger pipe size shall be (4") inch with a
maximum of (1) vertical support rod per
BADGER INDUSTRIES No-Drill™ [MDH1258]
[MDH1258]. Fits (1/2" & 5/8") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (7-1/2") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH1258 - Verco W3 Deck Vertical Threaded Rod
MDH1258-W3VTR
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Detail (MDH5834-W3VTR) Shall Face Down

BADGER INDUSTRIES Verco W3 BADGER INDUSTRIES


Concrete Filled
No-Drill™Hanger Steel Decking [MDH5834] Wedge End
Part # [MDH5834] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum (ASD) (3/4"-10) Hex Nut With Patent Pending In Steel Decking
Gravity Load Capacity Threaded
AISI, MSS-SP58, IBC, CBC,
461 lbs. Shaft With
Threaded
Barrel [MDH5834] [MDH5834]
OSHPD & COLA Compliant Wedge Lock 5/8"-11 Hole 3/4"-10 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH5834] Spacing 4-1/2 in.
Minimum Distance From For Proper
Installed Or Abandoned 1-1/4 in. (TYP.) Threaded Rod Or Rods Installation
Anchorages Or Inserts For Gravity Vertical Support Load Flat Surface
Wedge End Can Be Installed In Either Or Both Shall Face
Minimum Distance On Threaded Shaft Shall Holes. Total Accumulated Loads Down
From Outside Edge Of A 1 in. Be Aligned With Groove When (2) Threaded Rods Are
Grout Filled Hole In Steel Decking Installed In The Same [MDH5834] Body Wedge
NOTE: For compliance with 2015 Shall Not Exceed Listed Maximum End View
ANSI/UL 203 Table 12.1 listed required Capacity Per Chart Gravity Load
loads, the maximum NFPA-13 single
hanger pipe size shall be (4") inch with a
maximum of (1) vertical support rod per
BADGER INDUSTRIES No-Drill™ [MDH5834]
[MDH5834]. Fits (5/8" & 3/4") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (7-1/2") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH5834 - Verco W3 Deck Vertical Threaded Rod
MDH5834-W3VTR
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

VERCO - PLW2,
Sand-Lightweight Or
VERCO - W2 FORMLOK™
Normal Weight Concrete
Or
(f’c Min = 3,000 psi)
VERCO - PLW3,
VERCO - W3 FORMLOK™
Steel Steel Decking Steel Deck
Decking Groove
Minimum (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Shall Face Down
Detail (MDH-SV)
BADGER INDUSTRIES Verco W2 / W3 BADGER INDUSTRIES
No-Drill™Hanger Concrete Filled
Steel Decking [MDH3812] Wedge End
Part # [MDH3812] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum FpT / FpC (1/2"-13) Hex Nut With Patent Pending In Steel Decking
Gravity + Seismic 255 lbs. (ASD) Threaded Threaded
AISI, IBC, CBC, City Of L.A. 382 lbs. (LRFD) Shaft With Barrel [MDH3812] [MDH3812]
COLA Compliant Wedge Lock 3/8"-16 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH3812] Spacing 4-1/2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Installation
Installed Or Abandoned 1-1/4 in.
Anchorages Or Inserts For Seismic Vertical Flat Surface
Wedge End Support Load Can Be Shall Face
Minimum Distance On Threaded Shaft Shall Installed In Either Hole. Down
From Outside Edge Of A 1 in. Be Aligned With Groove Compression Capacity
Grout Filled Hole In Steel Decking Of Vertical Support Rod Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Be Engineered End View
By Others FpT / FpC
203 Table 12.1 listed required loads, the Per Chart
maximum NFPA-13 single hanger pipe size
shall be (4") inch with a maximum of (1) - 3/8"
diameter vertical support rod installed in the
BADGER INDUSTRIES No-Drill™ [MDH3812]
depicted 3/8"-16 hole. Fits (3/8" & 1/2") Threaded Rod Sizes
Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W2 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (4") Away From
Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH3812 - Verco W2 Or W3 Deck Seismic Vertical
MDH-SV
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Detail (MDH1258-SV) Shall Face Down

BADGER INDUSTRIES Verco W3 BADGER INDUSTRIES


Concrete Filled
No-Drill™Hanger Steel Decking [MDH1258] Wedge End
Part # [MDH1258] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum FpT / FpC (3/4"-10) Hex Nut With Patent Pending In Steel Decking
Gravity + Seismic 537 lbs. (ASD) Threaded Threaded
AISI, IBC, CBC, City Of L.A. 806 lbs. (LRFD) Shaft With Barrel [MDH1258] [MDH1258]
COLA Compliant Wedge Lock 5/8"-11 Hole 1/2"-13 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH1258] Spacing 4-1/2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Installation
Installed Or Abandoned 1-1/4 in.
Anchorages Or Inserts For Seismic Vertical Flat Surface
Wedge End Support Load Can Be Shall Face
Minimum Distance On Threaded Shaft Shall Installed In Either Hole. Down
From Outside Edge Of A 1 in. Be Aligned With Groove Compression Capacity
Grout Filled Hole In Steel Decking Of Vertical Support Rod Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Be Engineered
FpT / FpC
End View
203 Table 12.1 listed required loads, the By Others
maximum NFPA-13 single hanger pipe size
shall be (4") inch with a maximum of (1) - 5/8"
diameter vertical support rod installed in the
BADGER INDUSTRIES No-Drill™ [MDH1258]
depicted 5/8"-11 hole. Fits (1/2" & 5/8") Threaded Rod Sizes

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (7-1/2") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH1258 - Verco W3 Deck Seismic Vertical
MDH1258-SV
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
VERCO - PLW3, Normal Weight Concrete
VERCO - W3 FORMLOK™ (f’c Min = 3,000 psi)
Steel Decking

Steel Steel Deck Steel Deck


Decking Groove Groove
Minimum (TYP.) (TYP.)
20 Ga.
For Proper
Installation
~ BADGER INDUSTRIES ~ Flat Surface
Detail (MDH5834-SV) Shall Face Down

BADGER INDUSTRIES Verco W3 BADGER INDUSTRIES


Concrete Filled
No-Drill™Hanger Steel Decking [MDH5834] Wedge End
Part # [MDH5834] Installations Badger On Body Shall Be
Torque-Off No-Drill™Hanger Aligned With Groove
Maximum FpT / FpC (3/4"-10) Hex Nut With Patent Pending In Steel Decking
Gravity + Seismic 537 lbs. (ASD) Threaded Threaded
AISI, IBC, CBC, City Of L.A. 806 lbs. (LRFD) Shaft With Barrel [MDH5834] [MDH5834]
COLA Compliant Wedge Lock 5/8"-11 Hole 3/4"-10 Hole
End Washer
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Between
[MDH5834] Spacing 4-1/2 in.
Minimum Distance From For Proper
(TYP.) Threaded Rod Installation
Installed Or Abandoned 1-1/4 in.
Anchorages Or Inserts For Seismic Vertical Flat Surface
Wedge End Support Load Can Be Shall Face
Minimum Distance On Threaded Shaft Shall Installed In Either Hole. Down
From Outside Edge Of A 1 in. Be Aligned With Groove Compression Capacity
Grout Filled Hole In Steel Decking Of Vertical Support Rod Body Wedge
NOTE: For compliance with 2015 ANSI/UL Shall Be Engineered
FpT / FpC
End View
203 Table 12.1 listed required loads, the By Others
maximum NFPA-13 single hanger pipe size
shall be (4") inch with a maximum of (1) - 5/8"
diameter vertical support rod installed in the
BADGER INDUSTRIES No-Drill™ [MDH5834]
depicted 5/8"-11 hole. Fits (5/8" & 3/4") Threaded Rod Sizes

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand Loads Shall Be Sealed And Signed Per Engineering By Others. Obtain Approval
From The Project Structural Engineer Of Record For Usage. Read And Comply With All Notices And Instructions. Do Not Use This Detail For Non-Verco W3 Steel
Decking. Grooves Shall Be Located On The Webs Of Adjacent Steel Decking Ribs/Flutes, And At The Same Elevation As Each Other. Stay A Minimum (7-1/2") Away
From Dented Or Damaged Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Inspect Grooves Prior To Installation.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger [MDH]
Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The Length Of The
Grooves In The Steel Decking. Next, While Holding [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off Hex Nut Until Both
Wedge Ends Of The [MDH] Are Wedged Into The Opposing Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One Hand, Continue To Tighten
The Torque-Off Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between The Opposing Steel Deck Grooves. See Jam Nut Notice.
POST INSTALLATION VISUAL INSPECTION: Check That Grooves On Adjacent Steel Decking Webs Are At The Same Elevation. Check That Flat Surface Of The
[MDH] Body Is Facing Down From Underside Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular
Alignment Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock Washer Between Threaded Barrel And Body. Check
For Torque-Off Hex Nut Separation From Threaded Barrel. Check For Proper Threaded Rod Connection To [MDH].

~ BADGER INDUSTRIES ~
MDH5834 - Verco W3 Deck Seismic Vertical
MDH5834-SV
(Elev. View) - (Not To Scale) - (Read No-Drill™Hanger General Notes Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
Metal Decking: Normal Weight Concrete
VERCO - PLW3, (f’c Min = 3,000 psi)
VERCO - W3 FORMLOK™
Steel Deck BADGER INDUSTRIES Steel Deck
Steel
Groove [MDH1258] Or [MDH5834] Groove
Decking
(TYP.) (TYP.)
Minimum
20 Ga.
For Proper Badger SSC
Installation
Flat Surface
Shall Face Down
ELEV. VIEW
WARNING: All Seismic Hardware Is Not Alike. BADGER INDUSTRIES (SSC)
Listed Capacities Based On Design Conditions Horizontal

Vertical
Fp Seismic Hardware Connection To
Specific To The Badger Industries (SSC) Center-most Hole In [MDH] Using Tap Bolt
Seismic Hardware, Thus No Substitutions. Per Chart Brace Angle
With Lock Washer. (No Substitution)
Per Chart
Minimum (2") Inch Long ASTM A307 Or Better
IBC, AISI, ASCE 7, CBC, Tap Bolt With Lock Washer. Tighten Until Lock
~ BADGER INDUSTRIES ~ Washer Is Compressed Flat-To-Flat
OSHPD and NFPA Compliant
Detail (MDH-SSC-PAR)
Brace Angle From Vertical (+ / -) (2-1/2º)
BADGER INDUSTRIES 30º to 44º 45º to 60º 61º to 75º Notice:
Maximum Maximum Maximum
MDH Seismic Hardware GENERAL USAGE: Project Specific / Application Specific Usage Design
Part Number Part Number Fp (LRFD) Fp (LRFD) Fp (LRFD) Demand Loads Shall Be Sealed And Signed Per Engineering By Others.
Prior To Installation Obtain Approval From The Project Structural Engineer Of
MDH1258 Record For Usage. Do Not Use On Non-Verco W3 Formlok Steel Decking.
Or SSC 328 lbs. 554 lbs. 711 lbs. Grooves Shall Be Located On Adjacent Metal Decking Flutes, And Orientated
Opposite Of, And At The Same Elevation As Each Other. Stay A Minimum
MDH5834 (7-1/2") Away From Dented Or Damaged Steel Decking Grooves, And Steel
Decking Edges, Openings And Closures. Fp Values Account For Badger
Industries Seismic Hardware Eccentric Loading. Weaker Components /
Conditions Within Overall Design And Application Including, But Not Limited
PLAN VIEW To The Building Structure Capacity Shall Control.
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel
(TYP.) (1 Of 1) Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger
BADGER INDUSTRIES [MDH] Body Wedge End Into Steel Decking Groove With Flat Surface Of
[MDH] Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular
[MDH1258] Or [MDH5834] To The Length Of The Grooves In The Steel Decking. Next, While Holding
With Seismic Hardware Connected [MDH] Body Wedge End Tight Into Steel Decking Groove With One Hand,
To Center-most Hole In [MDH] Tighten Torque-Off Hex Nut Until Both Wedge Ends Of The [MDH] Are
(TYP.) Steel Decking
Rib/Flute Orientation

Wedged Into The Opposing Steel Decking Grooves. While Still Holding The
[MDH] Body In Place With One Hand, Continue To Tighten The Torque-Off
Hex Nut With An Open End Wrench Until The Hex Nut Portion Has Broken
Away From The Threaded Barrel Leaving The Lock Washer Compressed,
The Hex Nut Loose On The Threaded Shaft And The [MDH] Wedged Between
The Opposing Steel Deck Grooves. The Badger [MDH] Is Ready For
Installation Of Badger Seismic Hardware Per This Detail. Usage Is Limited
To (1) Badger Seismic Hardware Bracket Per Each Badger [MDH] Installation.
(TYP.) (1 Of 1) Check That Flat Surface Of The [MDH] Body Is Facing Down From Underside
BADGER INDUSTRIES Of Steel Decking. Check For Engagement Of Both Wedge Ends Into Steel
Deck Grooves. Check For Perpendicular Alignment Of [MDH] Body Length
(SSC) With The Length Of The Steel Decking Grooves. Check For Compressed
Seismic Hardware Lock Washer Between Threaded Barrel And Body. Check For Torque-Off
Orientated Parallel (+ / -) (2-1/2º) Hex Nut Separation From Threaded Barrel. Check For Badger Seismic
Hardware Bracket Flat-To-Flat To [MDH]. Check For Compressed Lock
With The Length Of The [MDH] Washer And Exposed Bolt Threads Through Top Of [MDH] Body.
(No Substitution)

~ BADGER INDUSTRIES ~
Metal Deck Hanger - Seismic Brace - Parallel
MDH-SSC-PAR
(Not To Scale) - (Read MDH General Notice Prior To Usage)
~ INSTALLATION DETAIL ~
10/17/17

Sand-Lightweight Or
Metal Decking: Normal Weight Concrete
VERCO - PLW3, (f’c Min = 3,000 psi)
VERCO - W3 FORMLOK™
Steel Deck BADGER INDUSTRIES Steel Deck
Steel
Groove [MDH1258] Or [MDH5834] Groove
Decking
(TYP.) (TYP.)
Minimum
20 Ga.
For Proper Badger SSC
Installation
Flat Surface ELEV. VIEW
Shall Face Down
WARNING: All Seismic Hardware Is Not Alike. BADGER INDUSTRIES (SSC)
Listed Capacities Based On Design Conditions Horizontal Seismic Hardware Connection To

Vertical
Specific To The Badger Industries (SSC) Fp Center-most Hole In [MDH] Using Tap Bolt
Seismic Hardware, Thus No Substitutions. Per Chart Brace Angle With Lock Washer. (No Substitution)
Per Chart Minimum (2") Inch Long ASTM A307 Or Better
Tap Bolt With Lock Washer. Tighten Until Lock
~ BADGER INDUSTRIES ~ IBC, AISI, ASCE 7, CBC, Washer Is Compressed Flat-To-Flat
OSHPD and NFPA Compliant
Detail (MDH-SSC-PS) (TYP.) (1 Of 1)
Brace Angle From Vertical (+ / -) (2-1/2º)
BADGER INDUSTRIES
BADGER INDUSTRIES 30º to 44º 45º to 60º 61º to 75º
Maximum Maximum Maximum [MDH1258] Or [MDH5834]
MDH Seismic Hardware With Seismic Hardware Connected
Part Number Part Number Fp (LRFD) Fp (LRFD) Fp (LRFD)
To Center-most Hole In [MDH]

MDH1258
Or SSC 188 lbs. 304 lbs. 306 lbs.
MDH5834

Notice:
GENERAL USAGE: Project Specific / Application Specific Usage Design Demand PLAN Seismic
Loads Shall Be Sealed And Signed Per Engineering By Others. Prior To Installation
Obtain Approval From The Project Structural Engineer Of Record For Usage. Do VIEW Hardware
Not Use On Non-Verco W3 Formlok Steel Decking. Grooves Shall Be Located On Orientation
Adjacent Metal Decking Flutes, And Orientated Opposite Of, And At The Same Placements
Elevation As Each Other. Stay A Minimum (7-1/2") Away From Dented Or Damaged
Steel Decking Grooves, And Steel Decking Edges, Openings And Closures. Fp For This
Values Account For Badger Industries Seismic Hardware Eccentric Loading. Half Not
Weaker Components / Conditions Within Overall Design And Application Including, Tested,
(TYP.) Steel Decking
Rib/Flute Orientation

But Not Limited To The Building Structure Capacity Shall Control. Thus Not
INSTALLATION: Prior To Placement Of The Badger [MDH], Clean The Steel Allowed
Decking Grooves To Expose Plated Decking Metal. Accurately Place Badger
[MDH] Body Wedge End Into Steel Decking Groove With Flat Surface Of [MDH]
Body Facing Down. Overall Length Of [MDH] Shall Be Perpendicular To The
Length Of The Grooves In The Steel Decking. Next, While Holding [MDH] Body
Wedge End Tight Into Steel Decking Groove With One Hand, Tighten Torque-Off
Hex Nut Until Both Wedge Ends Of The [MDH] Are Wedged Into The Opposing
Steel Decking Grooves. While Still Holding The [MDH] Body In Place With One
Hand, Continue To Tighten The Torque-Off Hex Nut With An Open End Wrench
Until The Hex Nut Portion Has Broken Away From The Threaded Barrel Leaving
The Lock Washer Compressed, The Hex Nut Loose On The Threaded Shaft And (TYP.) (1 Of 1)
The [MDH] Wedged Between The Opposing Steel Deck Grooves. The Badger [MDH] Is Ready For
Installation Of Badger Seismic Hardware Per This Detail. Usage Is Limited To (1) Badger Seismic BADGER INDUSTRIES
Hardware Bracket Per Each Badger [MDH] Installation. (SSC)
Check That Flat Surface Of The [MDH] Body Is Facing Down From Underside Of Steel Decking. Check Seismic Hardware
For Engagement Of Both Wedge Ends Into Steel Deck Grooves. Check For Perpendicular Alignment Perpendicular Or Splayed
Of [MDH] Body Length With The Length Of The Steel Decking Grooves. Check For Compressed Lock
Washer Between Threaded Barrel And Body. Check For Torque-Off Hex Nut Separation From To The Length Of The [MDH]
Threaded Barrel. Check For Badger Seismic Hardware Bracket Flat-To-Flat To [MDH]. Check For (No Substitution)
Compressed Lock Washer And Exposed Bolt Threads Through Top Of [MDH] Body.

~ BADGER INDUSTRIES ~
Metal Deck Hanger - Seismic Brace - Perpendicular / Splayed
MDH-SSC-PS
(Not To Scale) - (Read MDH General Notice Prior To Usage)
~ OSHPD COMPLIANCE NOTICE ~

~ OSHPD L EVEL 1 & 2 USAGE ~


Until further notice the use of Badger No-Drill™ Hangers on OSHPD
Level 1 & 2 projects shall be limited to vertical supports for items
(1 thru 6) listed in the OSHPD Usage Chart below. See Badger
Industries Installation Details (MDH-OEIU), (MDH-OE2SF) and
(MDH-OE2AF) for chart listed usage.
OSHPD currently does not offer OPM preapprovals for individual
components. However, Badger Industries is actively pursuing
recognition by OSHPD to expand usage of our No-Drill™ Hangers.

~ OSHPD Usage Chart ~


Badger Industries Metal Deck Hangers May Be Used With The Following
Components And Distributed Systems, Per CBC 2013, 1616A.1.18.
Item For Larger Components And Distributed System Sizes Contact Badger
No. Industries For A Project Specific / Application Specific Submittal.
[1] 2" inch and smaller sch.10 and thinner steel piping filled with water or gas.
[1a] 1-1/2" inch and smaller sch. 40 steel piping filled with water or gas.
[1b] 1-1/2" inch and smaller sch. 80 steel piping filled with water or gas.
[2] 2" inch and smaller type K, L or M copper piping filled with water or gas.
[2a] 3" inch and smaller type K, L or M copper piping filled with gas.
[3] 2" inch and smaller cast-iron soil piping - filled or vent.
[3a] 3" inch and smaller cast-iron soil piping - vent only.
[4] 2-1/2" inch and smaller EMT conduit.
[4a] 2" inch and smaller IMC or RMC conduit.
[5] Architectural, mechanical and electrical component weights 20 pounds (89N)
or less, including but not limited to equip., registers, diffusers, light fixtures, etc.
[5a] Distributed systems, 5 lb/ft (73 N/m) or less, including but not limited to conduit
supports, pipe supports, HVAC duct supports, low voltage supports, etc.

[6] Trapeze supports for conduits, piping, ductwork, etc., whereby no single item
exceeds the limits set forth above and the total operating weight of the item(s)
being supported by the trapeze is less than 10 lb/ft.
~ INSTALLATION DETAIL ~

Metal Decking: Sand-Lightweight Or


VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK, (f’c Min = 3,000 psi)
Minimum VERCO - PLW3,
20 GA. VERCO - W3 FORMLOK
Steel Badger Industries
Metal Deck [MDH3812] Metal Deck
Decking
Groove Groove
(TYP.) (TYP.)
(TYP.)
(1 Of 1) Metal Deck
~ BADGER INDUSTRIES ~ BADGER INDUSTRIES
Detail (MDH-OEIU) (TYP.) Threaded Rod
Groove
BADGER INDUSTRIES AISI, MSS-SP58,
Shall Be Exposed At [MDH3812] Badger
Top. Top Of Threaded
No-Drill™Hanger IBC, CBC, COLA
and OSHPD Rod Shall Not Contact No-Drill™Hanger Torque-Off
Hex Nut With
Part # [MDH3812] Compliant Metal Decking Patent Pending Threaded
Through Hole Through Hole [MDH3812] Barrel (1/2"-13)
Threaded Rod Size (3/8") or (1/2") With (1/2"-13) With (3/8"-16) Lock
Body Threaded Shaft
See OSHPD Exempt Item Usage Chart This Detail. Threaded Conn. Threads Washer With Wedge End

Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Spacing Between
Metal Deck Hangers 4-1/2 in. Wedge End
For Proper Installed (3/8") Proper Installation On Threaded Shaft
Minimum Distance Installation Threaded Rod Flat Surface Shall Shall Be Aligned With
From Center Of Installed Or Flat Surface Placement Face Down
In-Place Abandoned Concrete 1-1/4" in. Groove In Metal Decking
Shall Face Down. Example
Anchors Or Inserts
Wedge End On
Minimum Distance (ASD) Notice:
Body Shall Be
From Outside Edge Of A 1" in. Aligned With Groove
Per Chart GENERAL USAGE: Prior To Installation Obtain
Grout Filled Hole In Metal Decking Approval From The Project Structural Engineer Of
Record For Usage. Do Not Use On Metal Decking
Without Continuous Grooves. Grooves Shall Be
Located On Adjacent Metal Decking Flutes, And
~ OSHPD Usage Chart ~ Orientated Opposite Of, And At The Same Elevation As
Each Other. Stay A Minimum (7-1/2") Away From
Badger Industries Metal Deck Hangers May Be Used With The Following Dented Or Damaged Metal Decking Grooves, And Metal
Components And Distributed Systems, Per CBC 2013, 1616A.1.18. Decking Edges, Openings And Closures.
Item For Larger Components And Distributed System Sizes Contact Badger INSTALLATION: Prior To Placement Of The Badger
No. Industries For A Project Specific / Application Specific Submittal. [MDH3812], Clean Metal Decking Grooves To Expose
Plated Decking Metal. Accurately Place Badger
[1] 2" inch and smaller sch.10 and thinner steel piping filled with water or gas. [MDH3812] Chisel Point Ends Into Metal Decking
Grooves, With Flat Surface Of [MDH3812] Body Facing
[1a] 1-1/2" inch and smaller sch. 40 steel piping filled with water or gas. Down From Underside Of Metal Decking. Overall
[1b] 1-1/2" inch and smaller sch. 80 steel piping filled with water or gas. Length Of [MDH3812] Shall Be Perpendicular To The
Length Of The Grooves In The Metal Decking. Next,
While Holding [MDH3812] Body Chisel Point End Tight
[2] 2" inch and smaller type K, L or M copper piping filled with water or gas. Into Metal Decking Groove With One Hand, Tighten
[2a] 3" inch and smaller type K, L or M copper piping filled with gas. Torque-Off Hex Nut With Other Hand Until Both Chisel
Point Ends Of The [MDH3812] Are Tight And Securely
[3] 2" inch and smaller cast-iron soil piping - filled or vent. Wedged Into The Opposing Metal Decking Grooves.
While Holding The [MDH3812] Body In Place With One
[3a] 3" inch and smaller cast-iron soil piping - vent only. Hand, Continue To Tighten The Torque-Off Hex Nut
With An Open End Wrench Until The Hex Nut Portion
[4] 2-1/2" inch and smaller EMT conduit. Has Broken Away From The Threaded Barrel Leaving
Lock Washer Compressed, The Hex Nut Loose On The
[4a] 2" inch and smaller IMC or RMC conduit. Threaded Shaft And The [MDH3812] Tightly Wedged
Between The Opposing Metal Deck Grooves. For W3
[5] Architectural, mechanical and electrical component weights 20 pounds (89N) Deck Size Badger [MDH1258] Or [MDH5834] With
or less, including but not limited to equip., registers, diffusers, light fixtures, etc. (1/2", 5/8" Or 3/4") Threaded Rod Size Can Be
Substituted For [MDH3812].
[5a] Distributed systems, 5 lb/ft (73 N/m) or less, including but not limited to conduit
supports, pipe supports, HVAC duct supports, low voltage supports, etc. VISUAL INSPECTION: Check That Flat Surface Of
Body Is Facing Down From Underside Of Metal
Decking. Check For Engagement Of Both Chisel Points
[6] Trapeze supports for conduits, piping, ductwork, etc., whereby no single item Into Metal Deck Grooves. Check For Perpendicular
exceeds the limits set forth above and the total operating weight of the item(s) Alignment Of Body To Metal Deck With The Length Of
The Metal Decking Grooves. Check For Compressed
being supported by the trapeze is less than 10 lb/ft. Lock Washer Between Threaded Barrel And Body.
Check For Torque-Off Hex Nut Separation From
~ BADGER INDUSTRIES ~ Threaded Barrel. Check For Threaded Rod Exposed
Through Top Of Body.
Metal Deck Hanger™ - OSHPD Exempt Item Usage INSPECTION FREQUENCY: Per Project Structural
MDH-OEIU (Elev. View) - (Not To Scale)
Engineer Of Record Requirements.
~ INSTALLATION DETAIL ~

Metal Decking: Sand-Lightweight Or


VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK, (f’c Min = 3,000 psi)
Minimum VERCO - PLW3,
20 GA. VERCO - W3 FORMLOK
Steel Badger Industries
Metal Deck [MDH3812] Metal Deck
Decking
Groove Groove
(TYP.) (TYP.)
(TYP.) Metal (TYP.)
Deck Groove Metal Deck
(1 Of 2) Groove
~ BADGER INDUSTRIES ~ End Of Bolt Shall Be Exposed BADGER INDUSTRIES
Detail (MDH-OE2SF) For Visual Inspection. Strut
Can Be Connected To Badger [MDH3812]
BADGER INDUSTRIES AISI, MSS-SP58, Metal Deck Hanger Using
No-Drill™Hanger
No-Drill™Hanger IBC, CBC, COLA Either (3/8") Or (1/2")
and OSHPD Threaded Hole In Metal Patent Pending
Part # [MDH3812] Compliant Deck Hanger
Minimum Bolt Conn., Size (3/8")
Use In Conjunction With Detail (MDH-OEIU)
Minimum Concrete
Edge Distance 7-1/2 in.
Minimum Spacing Between Strut Span Member (12 ga. 1-5/8"x1-5/8") With
Metal Deck Hangers 4-1/2 in. ELEV. VIEW Maximum (9/16") Diameter Round Holes, Or
Maximum (9/16"x1-1/8") Slotted Holes In Back
Maximum Spacing Between
Metal Deck Hangers (with) Of Strut. Strut Shall Not Contact Metal Decking
12 Gauge 1-5/8"x1-5/8" Strut 84 in.
Span Member
Secure Strut To Badger Metal Deck Hanger Using ASTM A307 Or
Minimum Distance
From Center Of Installed Or Stronger Bolt Or Threaded Rod With Square Strut Washer. Tighten
In-Place Abandoned Concrete 1-1/4" in. Bolt Hand Tight Plus (1/8) Turn
Anchors Or Inserts
Minimum Distance (1 Of 2) (1 Of 2)
From Outside Edge Of A 1" in. Badger Industries Badger Industries
Grout Filled Hole [MDH3812] [MDH3812]
Per Chart Per Chart

Notice:
GENERAL USAGE: This Detail Is Intended
To Be Used In Conjunction With Badger
Detail (MDH-OEIU). Prior To Installation
Obtain Approval From The Project Structural
Engineer Of Record For Usage.
INSTALLATION: Both Of The (2) Required PLAN VIEW PLAN VIEW
Badger Metal Deck Hangers Shall Be
Located In The Same Metal Deck Valley. Strut Span Member Strut Span Member
Vertical Support Not Depicted For Clarity Perpendicular To Metal Deck Skewed To Metal Deck
Shall Be Connected To Strut Span Member
Using A Strut Nut, Strut Washer, And Hex Hangers. Bolted Conn., To Hangers. Bolted Conn., To
Nut. Vertical Support Can Be Located Along Bolted Conn., Maximum Span Bolted Conn., Maximum
The Strut Span Member Length, Anywhere Length Per Chart Span Length Per Chart
Between Bolted Conn., To The Badger
Metal Deck Hangers. Strut Span Member
Shall Not Contact Metal Decking.
SUBSTITUTIONS: For W3 Deck Size
Badger [MDH1258] Metal Deck Hangers
Can Be Substituted For Both Depicted
Badger [MDH3812] Metal Deck Hangers. (2 Of 2) (2 Of 2)
Badger Industries Badger Industries
[MDH3812] [MDH3812]
Per Chart Per Chart

~ BADGER INDUSTRIES ~
Metal Deck Hanger™ - Double Same Flute
MDH-OE2SF (Elev. & Plan Views) - (Not To Scale)
~ INSTALLATION DETAIL ~

Metal Decking: Sand-Lightweight Or


VERCO - PLW2, Normal Weight Concrete
VERCO - W2 FORMLOK, (f’c Min = 3,000 psi)
Minimum VERCO - PLW3,
20 GA. VERCO - W3 FORMLOK
Steel Badger Industries
Metal Deck [MDH3812] Metal Deck
Decking
Groove Groove
(TYP.) (TYP.)

(1 Of 2) (TYP.)
BADGER INDUSTRIES Metal Deck
~ BADGER INDUSTRIES ~ Groove
End Of Bolt Shall Be Exposed For [MDH3812]
Detail (MDH-OE2AF) Visual Inspection. Strut Can Be
Connected To Badger Metal Deck No-Drill™Hanger
BADGER INDUSTRIES AISI, MSS-SP58,
Hanger Using Either (3/8") Or (1/2") Patent Pending
No-Drill™Hanger IBC, CBC, COLA
and OSHPD Threaded Hole In
Part # [MDH3812] Compliant Metal Deck Hanger
Minimum Bolt Conn., Size (3/8")
Use In Conjunction With Detail (MDH-OEIU)
Stack Multiple Square Strut Washers To
Minimum Concrete Develop A Rigid Spacer Off-Set To Keep
Edge Distance 7-1/2 in. ELEV. VIEW
Strut From Contacting Metal Decking
Minimum Spacing Between
Metal Deck Hangers 4-1/2 in.
Strut Span Member (12 ga. 1-5/8"x1-5/8") With
Maximum Spacing Between Maximum (9/16") Diameter Round Holes, Or
Metal Deck Hangers (with)
12 Gauge 1-5/8"x1-5/8" Strut 84 in. Maximum (9/16"x1-1/8") Slotted Holes In Back
Span Member Of Strut. Strut Shall Not Contact Metal Decking

Minimum Distance
From Center Of Installed Or
In-Place Abandoned Concrete 1-1/4" in. (1 Of 2) Secure Strut To Badger Metal Deck Hanger Using ASTM A307 Or
Anchors Or Inserts Badger Industries Stronger Bolt Or Threaded Rod With Square Strut Washer. Tighten
Bolt Hand Tight Plus (1/8) Turn
Minimum Distance [MDH3812]
From Outside Edge Of A 1" in. Per Chart
Grout Filled Hole

Strut Span Member


Skewed To Metal Deck
Hangers. Bolted Conn., To PLAN VIEW
Notice: Bolted Conn., Maximum
GENERAL USAGE: This Detail Is Intended To Be Used In Conjunction With Span Length Per Chart (2 Of 2)
Badger Detail (MDH-OEIU). Prior To Installation Obtain Approval From The Badger Industries
Project Structural Engineer Of Record For Usage.
[MDH3812]
INSTALLATION: Both Of The (2) Required Badger Metal Deck Hangers Shall Per Chart
Be Located In Different Metal Deck Valleys. Individual Metal Deck Hangers Can
Be Rotated In Plan 180º Degrees From That Depicted. Vertical Support Not
Depicted For Clarity Shall Be Connected To Strut Span Member Using A Strut
Nut, Strut Washer, And Hex Nut. Vertical Support Can Be Located Along The
Strut Span Member Length, Anywhere Between Bolted Conn., To The Badger Strut Span Member
Metal Deck Hangers. Strut Span Member Shall Not Contact Metal Decking. Parallel To Metal Deck (2 Of 2)
SUBSTITUTIONS: For W3 Deck Size Badger [MDH1258] Metal Deck Hangers Hangers. Bolted Conn., Badger Industries
Can Be Substituted For Both Depicted Badger [MDH3812] Metal Deck Hangers. To Bolted Conn., Maximum PLAN VIEW [MDH3812]
Span Length Per Chart Per Chart

(1 Of 2)
Badger Industries
[MDH3812]
Per Chart
~ BADGER INDUSTRIES ~
Metal Deck Hanger™ - Double Adjacent Flute
MDH-OE2AF (Elev. & Plan Views) - (Not To Scale)
~ CITY Of LOS ANGELES USAGE ~
REPORT: LARR 26090
BOARD OF
CITY OF LOS ANGELES DEPARTMENT OF
BUILDING AND SAFETY CALIFORNIA BUILDING AND SAFETY
COMMISSIONERS 201 NORTH FIGUEROA STREET
____ LOS ANGELES, CA 90012

VAN AMBATIELOS ____


PRESIDENT
FRANK M. BUSH
E. FELICIA BRANNON GENERAL MANAGER
VICE PRESIDENT SUPERINTENDENT OF BUILDING

JOSELYN GEAGA-ROSENTHAL ERIC GARCETTI OSAMA YOUNAN, P.E.


GEORGE HOVAGUIMIAN MAYOR EXECUTIVE OFFICER
JAVIER NUNEZ

____ ____

Jobsite Supply Co. RESEARCH REPORT: RR 26090


4720 Mission Gorge Place (CSI # 13080)
San Diego, CA 92120

Attn: Brad Lawhorn REEVALUATION DUE


(714) 929-8668 DATE: May 1, 2018
Issued Date: May 1, 2017
Code: 2017 LABC

GENERAL APPROVAL – Initial Approval – Badger Industries Seismic and Vertical


Components

DETAILS

The Badger Industries seismic SSC and SSC-RF components are composed of ASTM A1011
CS, Grade 33 or equivalent minimum 33,000 psi yield strength carbon steel. Pivot pin is
composed of (1/2”) diameter ASTM A307 equivalent carbon steel. A slotted tabbed washer size
to fit connection is provided with, and is required to be installed with each Badger Industries
SSC-RF seismic bracket. Seismic brackets can be used for upper or lower brace end connections.
The Allowable and (LRFD) capacities are listed in Attachment 1 and Attachment 2.

The Badger Industries seismic SHCA components are composed of ASTM A1011 CS, Grade 33
or equivalent minimum 33,000 psi yield strength carbon steel. V-Bolt is composed of (1/4”)
diameter ASTM A307 or equivalent carbon steel. The Allowable and (LRFD) capacities are
listed in Attachment 3.

The Badger Industries seismic MDH3812, MDH1258, and MDH 5834 components are
composed of a minimum 33,000 psi yield strength carbon steel body. MDH3812 is composed of
(1/2”) diameter ASTM A307 or equivalent carbon steel shaft, and the MDH1258, and the
MDH5834 is composed of (3/4”) diameter ASTM A307 or equivalent steel shaft. The Allowable
and (LRFD) capacities are listed in Attachment 4.

RR 26090
Page 1 of 3

LADBS G-5 (Rev.11/23/2016) AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER


Badger Industries
RE: Badger Seismic Bracing And Vertical Components
The approval is subject to the following conditions:

1. This approval is limited to mechanical, electrical, ductwork equipment, and plumbing


components.
2. The use of Badger Industries components is for interior use only.
3. The tabulated allowable and/or (LRFD) loads shall not be increased for duration of
loading.
4. The values listed in attachments 1 and 2 are for the Badger Industries components
only. Calculations demonstrating the applied loads are not greater than the loads for
each individual components within the assembly shall be submitted for plan check at
the time of permit application.
5. The values listed in attachment 3 are for the compression capacity of the listed
assembly. Calculations demonstrating the applied loads are not greater than the loads
for each individual component within the assembly shall be submitted for plan check
at the time of permit application.
6. The values listed in attachment 4 are for the Badger Industries components when used
for vertical connections only. Calculations demonstrating the applied loads are not
greater than the loads for each individual component within the assembly shall be
submitted for plan check at the time of permit application.
7. The Badger Industries seismic components and assemblies installations shall be in
accordance with the manufacturer’s most current instructions and the requirements
herein. A copy of this report and the installation instruction shall be provided at each
job site by the installing contractor.
8. Periodic Special Inspection required during installation and anchorage of piping and
ductwork designed to carry hazardous material in structures in accordance with
LABC 1705.11.6

RR 26090
Page 2 of 3

LADBS G-5 (Rev.11/23/2016) AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER


Badger Industries
RE: Badger Seismic Bracing And Vertical Components
DISCUSSION

This report is in compliance with the 2017 City of Los Angeles Building Code.

This approval is based on load tests provided by CEL Consulting.

Addressee to whom this Research Report is issued is responsible for providing copies of it,
complete with any attachments indicated, to architects, engineers and builders using items
approved herein in design or construction which must be approved by Department of Building
and Safety Engineers and Inspectors.

This general approval of an equivalent alternate to the Code is only valid where an engineer
and/or inspector of this Department has determined that all conditions of this Approval have
been met in the project in which it is to be used.

___________________________________

QUAN NGHIEM, Chief


Engineering Research Section
201 N. Figueroa St., Room 880
Los Angeles, CA 90012
Phone - 213-202-9816
Fax - 213-202-9943

Attachments: Badger Industries Details (4 Pages)

LD
RR26090
R05/18/17
TLB1700167
1705.11.6, 2210, 2210A

RR 26090
Page 3 of 3

LADBS G-5 (Rev.11/23/2016) AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER


LARR 26090 Attachment 1

BADGER INDUSTRIES - Part SSC


Badger SSC

SB
Connection

EM
Size Per

T
Pi
Chart

vo
Vertical

tA
rm
NOTES:
Brace
Capacity of bracket based on seismic testing Angle
considering both tension and compression.
To convert listed brace angle capacity to Per Chart
horizontal capacity multiply listed capacity

M
by (sin) of the brace angle.

ax
.L
oa
d
Pe
Allowable Load with Factor Of Safety = 3.0

rC
ha
Connection Bracing
30º to 44º 45º to 60º 61º to 75º

rt
Size Type

1/2 In. Rigid 1,602 lbs. 1,602 lbs. 1,195 lbs.

5/8 In. Rigid 1,602 lbs. 1,602 lbs. 1,195 lbs.

(LRFD) Load with Factor Of Safety = 2.0


Connection Bracing
Size Type 30º to 44º 45º to 60º 61º to 75º

1/2 In. Rigid 2,403 lbs. 2,403 lbs. 1,793 lbs.

5/8 In. Rigid 2,403 lbs. 2,403 lbs. 1,793 lbs.

BADGER - Stocking Master Dist: MANUFACTURER:


BADGER INDUSTRIES
www.seismicbracing.com
(925) 788-1301
P.O. Box 0933
Contact: Brad Lawhorn (714) 929-8668 Alamo, CA 94507
LARR 26090 Attachment 2

BADGER INDUSTRIES - Part SSC-RF

M
ax
.
Lo
ad
Pe
rC
ha
rt
Brace
x/x
Angle x/x

Vertical
Per Chart
NOTES:

SB
Capacity of bracket based on seismic testing
considering both tension and compression.

EM
To convert listed brace angle capacity to Connection

T
horizontal capacity multiply listed capacity Size Per

Pi
by (sin) of the brace angle.

vo
Chart

tA
rm
STW
Allowable Load with Factor Of Safety = 3.0 Washer
Badger
Connection Bracing SSC-RF Sized To
30º to 44º 45º to 60º 61º to 75º 76º to 90º
Size Type Fit Conn.
3/8 In. Rigid 1,451 lbs. 1,142 lbs. 889 lbs. 821 lbs.

1/2 In. Rigid 1,451 lbs. 1,142 lbs. 889 lbs. 821 lbs.

5/8 In. Rigid 1,451 lbs. 1,142 lbs. 889 lbs. 821 lbs.

3/4 In. Rigid 1,451 lbs. 1,142 lbs. 889 lbs. 821 lbs.

(LRFD) Load with Factor Of Safety = 2.0


Connection Bracing
Size Type 30º to 44º 45º to 60º 61º to 75º 76º to 90º

3/8 In. Rigid 2,176 lbs. 1,714 lbs. 1,333 lbs. 1,232 lbs.

1/2 In. Rigid 2,176 lbs. 1,714 lbs. 1,333 lbs. 1,232 lbs.

5/8 In. Rigid 2,176 lbs. 1,714 lbs. 1,333 lbs. 1,232 lbs.

3/4 In. Rigid 2,176 lbs. 1,714 lbs. 1,333 lbs. 1,232 lbs.

BADGER - Stocking Master Dist: MANUFACTURER:


BADGER INDUSTRIES
www.seismicbracing.com
(925) 788-1301
P.O. Box 0933
Contact: Brad Lawhorn (714) 929-8668 Alamo, CA 94507
LARR 26090 Attachment 3

BADGER INDUSTRIES - Part SHCA


932 lbs Allowable Load with Factor Of Safety = 3
1,398 lbs (LRFD) Load with Factor Of Safety = 2
Compression capacity Of single strut vertical member at maximum length.

Max. (1/4")
Gap, (TYP.)
Max. Max.
BADGER (6") (6")
INDUSTRIES
Part SHCA

(12 ga. 1-5/8"x1-5/8")


Max. (1 And 2 Of 2)
Single Strut Vertical
(10'-0") Badger (SHCA)
Member, (TYP.)
Clamp Assemblies
(TYP.)

(12 Ga.)
Strut Per
Detail a5 a5 Max.
(3")

a5 - a5 a5 a5 Max.
(3")
Tighten Both
Break-Off
Hex Nuts
Evenly Until
Hex Head
Breaks Away Item Being Supported By
Seismic Bracing Not Threaded Rod. Strut
Shown For Clarity Trapeze Or Equipment

Seismic Bracing Not Item Being Supported By Single Hanger


Shown For Clarity

BADGER - Stocking Master Dist: MANUFACTURER:


BADGER INDUSTRIES
www.seismicbracing.com
(925) 788-1301
P.O. Box 0933
Contact: Brad Lawhorn (714) 929-8668 Alamo, CA 94507
LARR 26090 Attachment 4

BADGER INDUSTRIES - Part MDH3812


255 lbs Allowable Load with Factor Of Safety = 3
382 lbs (LRFD) Load with Factor Of Safety = 2
Capacity Of MDH3812 based on seismic testing considering both tension and compression.

Vertical
BADGER INDUSTRIES - Part MDH1258 & MDH5834
537 lbs Allowable Load with Factor Of Safety = 3
806 lbs (LRFD) Load with Factor Of Safety = 2
Capacity Of MDH1258 based on seismic testing considering both tension and compression.
Vertical

BADGER - Stocking Master Dist: MANUFACTURER:


BADGER INDUSTRIES
www.seismicbracing.com
(925) 788-1301
P.O. Box 0933
Contact: Brad Lawhorn (714) 929-8668 Alamo, CA 94507
BADGER INDUSTRIES No-Drill™ Hangers
Integrated Lean Constuction Through Innovation