Creep calculation ( Using Third edition of Transmission and Distribution Electrical Engineering book by
Colin Bayliss & Brian Hardy)
Time period Considered for creep t1 Yrs 10
Hrs 87600
Average every day stress (EDS/area) σ kgf/mm2 6.167
Every Day Temperature of conductor θ °C 32
μ - 0.377
β - 1.418
φ - 0.0171
Creep coefficients for ACSR conductors, Table 18.10a
δ - 0.1876
e - 2.7182818
K - 1.6
From formula 1 of Cl.No. 18.5.1.5,
Creep for t1 period = = mm/km 770.2
1.41
Equivalent Creep of Pretensioning
Pretensioning time t2 hrs 48
Stress during Pretensioning σ kgf/mm2 6.167
Equivalent Creep of pretensioning for t2 period
= mm/km 102.9
Therefore Creep Compensation Required
= mm/km 667.3
Coefficient of thermal expansion of the conductor a /°C 0.0000193
Note: The above calculations are made to the best of our knowledge from the available resources and assumed conditions.