TEMPERATURE SHIFT CALCULATION

Particulars Symbol Unit Value


Conductor Details
Conductor Code Name - - ACSR ZEBRA
No.of Aluminum wires Φ1 No/mm 54/3.18mm
No.of Steel wires Φ2 No/mm 7/3.18mm
2
Area of Cross Section A mm 484.48
KN 131.9
UTS of Conductor U
Kg 13445.5

Loading details (Assumed)


Every Day Stress as % of UTS (Considering FOS=4.5) - % 22.22
Every Day Temperature of conductor θ °C 32
Pretensioning Tension as % of UTS - % 22.22

Creep calculation ( Using Third edition of Transmission and Distribution Electrical Engineering book by
Colin Bayliss & Brian Hardy)
Time period Considered for creep t1 Yrs 10
Hrs 87600
Average every day stress (EDS/area) σ kgf/mm2 6.167
Every Day Temperature of conductor θ °C 32
μ - 0.377
β - 1.418
φ - 0.0171
Creep coefficients for ACSR conductors, Table 18.10a
δ - 0.1876
e - 2.7182818
K - 1.6
From formula 1 of Cl.No. 18.5.1.5,
Creep for t1 period = = mm/km 770.2
1.41
Equivalent Creep of Pretensioning
Pretensioning time t2 hrs 48
Stress during Pretensioning σ kgf/mm2 6.167
Equivalent Creep of pretensioning for t2 period

= mm/km 102.9
Therefore Creep Compensation Required
= mm/km 667.3
Coefficient of thermal expansion of the conductor a /°C 0.0000193

Therefore Equivalent Temperature shift

(ε1 - ε2) ÷ a = 34.6 °C

Note: The above calculations are made to the best of our knowledge from the available resources and assumed conditions.