Вы находитесь на странице: 1из 18

MINISTRY OF ROAD TRANSPORT &HIGHWAY (Government

Configuration From Km 0.000(Design Km 0.000) To Km 16.440 (D


NAME OF PROJECT Existing 3.470 Km Of Rudraprayag Bypass Of Nh-109 Through An
Name of Client Chief Engineer, National Highway PWD Dehradun
Name of Authority Engineer Highway Engineering Consultant In Association with Ltelford Con
Name of Contractor R.G.Buldwell Engineers Ltd.
Weather Record month of September - 2019
Weather Rainfall Temperature °C. Humid
S.No. Date (in mm) Min. Min.
Max.
1 01.09.2019 RAINY(31mm) 18.7 27 40
2 02.09.2019 SUNNY 23.0 31 44
3 03.09.2019 CLOUDY 18.0 27 45
4 04.09.2019 CLOUDY 21.0 29 46
5 05.09.2019 SUNNY 22.0 29 58
6 06.09.2019 SUNNY 22.0 31 48
7 07.09.2019 CLOUDY 21.0 30 44
8 08.09.2019 RAINY(32mm) 17.0 29 42
9 09.09.2019 SUNNY 24.0 33 40
10 10.09.2019 SUNNY 25.0 33 34
11 11.09.2019 SUNNY 25.0 33 31
12 12.09.2019 CLOUDY 24.0 32 41
13 13.09.2019 SUNNY 24.0 32 36
14 14.09.2019 SUNNY 24.0 32 38
15 15.09.2019 SUNNY 23.0 33 36
16 16.09.2019 CLOUDY 23.0 32 34
17 17.09.2019 SUNNY 22.0 32 31
18 18.09.2019 SUNNY 22.0 31 33
19 19.09.2019 SUNNY 22.0 31 28
20 20.09.2019 SUNNY 22.0 31 26
21 21.09.2019 SUNNY 22.0 31 30
22 22.09.2019 SUNNY 21.0 30 33
23 23.09.2019 RAINY(35mm) 22.0 30 34
24 24.09.2019 SUNNY 23.0 31 35
25 25.09.2019 SUNNY 22.0 31 36
26 26.09.2019 CLOUDY 23.0 29 38
27 27.09.2019 SUNNY 23.0 29 40
28 28.09.2019 RAINY(75mm) 22.0 28 34
29 29.09.2019 RAINY(150mm) 22.0 28 37
30 30.09.2019 RAINY(55mm) 21.0 27 29

Contractor Rep. Authority


(Government of india)
00) To Km 16.440 (Design Km 18.700) Including
Nh-109 Through An Engineering, Procurement &
adun
on with Ltelford Consulting Engineers Pvt.Ltd.

mber - 2019
Humidity % Remarks
Min. Max.
40 88
44 87
45 88
46 92
58 87
48 82
44 83
42 80
40 83
34 84
31 83
41 83
36 84
38 83
36 79
34 82
31 78
33 71
28 63
26 67
30 70 70
33 74
34 70
35 71
36 78
38 85
40 85
34 82
37 89
29 86

Authority Engineer Rep.


Widening and Strengthening of Existing Iintermediate 2-Lane With Paved Shoulder Configuration From Km.0+00(Design km.000 to km. 16.440 (design km.18.700) Including Existing 3.470 km. of Rud
Bypass of NH-109 Through An Engineering Procurement & Construction on EPC Contract in the State of Uttarakhand.

TEST SUMMARY FOR THE MONTH OF SEPTEMBER 2019

No.of Test Conducted Previous No. of Test Conducted During this Cum.No. of Test conducted up to No.of test conducted b
Month Month this months authority engineer
SI NO. Type Of Test Frequency Test Method No of No of No of
Upto
test Conduct Pass Fail test Conduct Pass Fail test Conduct Pass Fail
ed ed ed Last
Require Require Require
Month
d d d
A) OGL (M²)

1 test/150
1 Proctor Test RM/ Site IS: 2720, Part 8 0 0 0 0 0 0 0 0 0 0 0 0 18

1 test/3000 m² IS: 2720, Part


2 Field Density 28 0 0 0 0 0 0 0 0 0 0 0 0 54

Gradtion/Sand
Content 2 test/3000 m² IS: 2720, Part 4 0 0 0 0 0 0 0 0 0 0 0 0 20

4 Atterberg's Limit 2 test/3000 m² IS: 2720, Part 5 0 0 0 0 0 0 0 0 0 0 0 0 25

6 Free Swelling Index 2 test/3000 m² IS: 2720, Part 0 0 0 0 0 0 0 0 0 0 0 0 23


40

B) SUB GRADE Materials

1 Atterberg's Limit 1 test/1500 m³ IS: 2720, Part 5 25 27 25 2 0 0 0 0 25 27 25 2 64

2 GSA 1 test/1500 m³ IS: 2720, Part 4 30 34 30 4 0 0 0 0 30 34 30 4 71

3 Proctor Test 1 test/1500 m³ IS: 2720, Part 8 2 2 2 0 0 0 0 0 2 2 2 0 13

Free Swelling Index 1 test/1500 m³ IS: 2720, Part


4 40 25 25 25 0 0 0 0 0 25 25 25 0 30

1 test/3000 m³ IS: 2720, Part


5 CBR 16 1 1 1 0 0 0 0 0 1 1 1 0 9
Field Density (in 1 set of ten IS: 2720, Part
6 Set) test/2000 m² 28 90 95 90 5 0 0 0 0 90 95 90 5 470

C) GSB Materials

1 Atterberg's Limit 1 test/400 m³ IS: 2720, Part 5 21 21 21 0 21 21 21 0 43

2 Sieve Analysis 1 test/400 m³ IS: 2786 ,Part 1 20 22 20 2 20 22 20 2 47

3 AIV 1 test/400 m³ IS: 2720, Part 2 18 20 18 2 18 20 18 2 45

IS: 2720, Part


4 CBR As Required 16 0 0 0 0 0 0 0 0 4

Field Density In
5 (Sets) 1 test/1000 m² IS: 2720, Part 8 47 52 47 5 47 52 47 5 182

D) WMM Materials

1 Atterberg's Limit 1 test/200 m³ IS: 2720, Part 5 51 51 51 0 51 51 51 0 56

2 Sieve Analysis 1 test/200 m³ 50 51 50 1 50 51 50 1 58

Aggregate Impact 1 test/1000 m³ IS: 2386, Part 4


3
Value 17 17 17 0 17 17 17 0 47

Comb. Flakiness
4
Elongation 1 test/500 m³ IS: 2386, Part 1 15 15 15 0 15 15 15 0 52

Field Density (In 1 set of three


5
Set) test/1000 m² IS: 2720, Part 5 65 69 65 4 65 69 65 4 267

E) Bituminous Emulsion Prime Coat Materials

Rate of Spread of
1
Binder 3 tests/day MORTH 72 78 72 6 72 78 72 6 59

F) Bituminous Emulsion Tack Coat Materials


Rate of Spread of
1
Binder 3 tests/day MORTH 72 75 72 3 72 75 72 3 53

G) Dense-Graded Bituminous Macadam Materials

Aggregate Impact 1 test per 350 IS: 2386, Part 4


1
Value m³ 154 164 154 10 154 164 154 10 49

Comb. Flakiness & 1 test per 350


2
Elongation m³ IS: 2386, Part 1 154 160 154 6 154 160 154 6 48
1 set for
Extraction & individual
3
Gradation constituent & IS: 2386, Part 1 52 57 52 5 52 57 52 5 49
mixed
3 test for
aggregate from
4 Mix Grading stability,
dryer for flow
each IS: 2386, Part 1 78 88 78 10 78 88 78 10 32
Stability and Voids value, density
400 tonne of
analysis of Mix mixand void to
subject
content for
minimum of 2
5 including therotical each 400 tonne AASHTO T245 90 90 90 0 90 90 90 0 52
test/day
maximum specific of mix per
subject
plant.
of loose mix.
Density of to minimum of
6
Compacted layer 12test/day
test/700per m² ASTM: D2726 78 78 78 0 78 78 78 0 0
plant.

H) BITUMINOUS CONCRETE

1 Quality of Binder 1 test/lot IS:73, IS:15462 0 0 0 0 0 0 0 0 0

Aggregate Impact 1 test per 350 IS: 2386, Part 4


2
Value m³
0 0 0 0 0 0 0 0 0

Comb. Flakiness & 1 test per 350 IS: 2386, Part 1


3
Elongation m³
0 0 0 0 0 0 0 0 0

4 Soundness Test 1 test/source IS: 2386, Part 5 0 0 0 0 0 0 0 0 0

5 Water Absorption 1 test/source IS: 2386, Part 3 0 0 0 0 0 0 0 0 0

Sand Equivalent
6
Test 1 test/source 0 0 0 0 0 0 0 0 0

7 Plasticity Index 1 test/source IS: 2720, Part 5 0 0 0 0 0 0 0 0 0


Polished Stone
8
Value 1 test/source 0 0 0 0 0 0 0 0 0
1 test per
1 set for350
m³ of
individual
Percentage of
9
Fractured face aggregate &
constituent 0 0 0 0 0 0 0 0 0
when crushed
mixed
gravel
3 test
aggregate is for
used.
from
10 Mix Grading stability,
dryer for flow
each 0 0 0 0 0 0 0 0 0
Stability and Voids value, density
400 tonne of
mixand void to
subject
analysis of Mix content for
minimum of 2
11 including therotical each 400 tonne
0 0 0 0 0 0 0 0 0
maximum specific oftest/day per
mix subject
plant.
ofMoisture
loose mix. to
1 minimum
test for of
each
12 Susceptibillity of 2test/day
mix type.per AASHTO T283 0 0 0 0 0 0 0 0 0
Temperature
mix of plant.
Binder in boiler,
aggregate in dryer At regular
13
and mix at the time 1 setintervals.
0 0 0 0 0 0 0 0 0
for each
of laying & 400 tonnes of
compaction.
Binder Content mix subject to
14
miniumum 2
0 0 0 0 0 0 0 0 0
test/day per
Rate of Spread of Afterplant.
every 5th
15
mix material. truck load.
0 0 0 0 0 0 0 0 0

Density of
16
Compacted layer
1 test/700 m² 0 0 0 0 0 0 0 0 0

I) Cement (OPC Grade 43)

Standard
1
Consistency. IS:4031, Part-4 3 3 3 0 3 3 3 0 14

Fineness (Dry
2
Sieve) 1 test per lot 3 3 3 0 3 3 3 0 14

Le Chatelier
3
Expansion IS:4031, Part 3 0 0 0 0 0 0 0 0 0

4 Time of Setting 30 mi IS:4031, Part 5 3 3 3 0 3 3 3 0 14


min(initial)
600
3 mi max
days
(final) IS:4031, Part 6 0 0 0 0 0 0 0 0 2

7 days
Compressive
Strength IS:4031, Part 6 9 9 9 0 9 9 9 0 47
Compressive
Strength

5 28 days IS:4031, Part 6 12 12 12 0 12 12 12 0 27

J) Concrete Works

Sieve Analysis of 1
1
CA test/operation IS: 383 76 85 76 9 76 85 76 9 105

Sieve Analysis of 1
2
FA/Silt Content test/operation IS: 383 72 78 72 6 72 78 72 6 142

3 Flakiness Index 1 test / 200 m³ IS: 2386, Part 1 60 64 60 4 60 64 60 4 95

Aggregate Impact 1 test / 200


4
Value m³ IS: 2386, Part 4 65 65 65 0 65 65 65 0 122

K) Concrete Compressive Strength Test (In Cube)

1 M-15 (7 days) 3 Cube for 7 27 27 27 0 27 27 27 0 204


days & other IS: 516
cubes for 28
2 M-15 (28 days) days 30 30 30 0 30 30 30 0 390

M20 7 DAYS 3 Cube for 7 0 0 0 0 0 0 0 0 21


days & other IS: 516
cubes for 28
M20 28 DAYS days 0 0 0 0 0 0 0 0 9

3 M-25(7 days) 3 Cube for 7 9 9 9 0 9 9 9 0 42


days & other IS: 516
cubes for 28
4 M-25 (28 days) days 6 6 6 0 6 6 6 0 84
3 Cube for 7
days & other
5 M-30 (7days) cubes for 28 IS:516 183 183 183 0 183 183 183 0 21
daysfor 7
3 Cube
days & other
6 M-30(28 days) cubes for 28 30 30 30 0 30 30 30 0 36
days
Motor Cube 3 Days,
IS: 516
IS: 516
7 Motor Cube 7 days 0 0 0 0 0 0 0 0 279

8 Motor Cube 28 days 0 0 0 0 0 0 0 0 273

L) CALIBRATION

Concrete Batching
1
Plant CP-30 Every month IS :4925 0 0 0 0 0 0 0 0 0

Wet mix Plant


2
CP-100 TPH Six Months IRC109-2015 0 0 0 0 0 0 0 0 1

Compressive IS :
3 Tesing Machine Every Year 516/4169/148 0 0 0 0 0 0 0 0 1
(1500KN) 58
Sand Pouring
Cylinder(200mm) Every month 1 1 1 0 1 1 1 0 9
4
Sand Pouring
Cylinder(100mm) Every month IS:2720 P-28 1 1 1 0 1 1 1 0 7

5 Rapid Moisture Every month 1 1 1 0 1 1 1 0 7


Meter

Total Test 1719

Total Pass 1632

Total fail 87

Authority's Engineer-LTCEPL
Contractor's signature
ding Existing 3.470 km. of Rudraprayag

No.of test conducted by


authority engineer
REMAR
KS
During Up To
Month date

0 18

0 54

0 20

0 25

0 23

6 70

8 79

1 14

6 36

1 10
21 491

5 48

4 51

4 49

0 4

12 194

12 68

11 69

4 51

5 57

15 282

18 77
18 71

38 87

35 83

13 62

21 53

27 79

21 21

0 0

0 0

0 0

0 0

0 0

0 0

0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 16

2 16

0 0

2 16

3 50
4 31

19 124

18 160

15 110

16 138

8 212

8 398

0 21

0 9

3 45

3 87

45 66

6 42
0 279

0 273

0 0

0 1

0 1

1 10

1 8

1 8

Authority's Engineer-LTCEPL

Вам также может понравиться