Mini COP,

Mini COPxx– Dec 2006


23 February 2007

MUDLINE SUSPENSION

Well Completion Section


Drilling Department

Abdil Adzeem Ahmad Mahdzan


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Agenda
 Introduction
 Function of Mudline Suspension
 Location of Mudline Suspension
 Casing Suspension Scenario Matrix
 Scenario 1 (rig)
 Scenario 2 (platform)
 Scenario 3 (MLH)
 Scenario 4 (MLC)
 Types of Mudline Suspension (Vetco Gray)
 MLH – tieback not required
 MLC – tieback required
 Run-in & Tieback Procedure (for MLC)
 MLC Components
 Q&A
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Introduction
DEFINITION
Suspend
To hang casing strings by supporting their loads at
either 1 of 2 locations:
• Rig or platform
• Mudline (seafloor)
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Function of Mudline Suspension


• Suspends casing loads at the mudline
– Why?
Rig / platform load rating insufficient to suspend
casing at the surface wellhead
– How?
Loads transferred from one casing string to the
previous casing string via shoulder-collet interface
• Allows for temporary abandonment & re-entry
(Vetco Gray MLC only)
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Location of Mudline Suspension

Mudline
suspension
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Casing Suspension Scenario Matrix

CASING SUSPENSION SCENARIO

Drilling Mode Exploration Development

2) Platform
No re-entry 1) Rig
3) Vetco Gray MLH

Re-entry 4) Vetco Gray MLC


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

SCENARIO #1
Well: Exploration
Re-entry: No
Suspension Mode: Rig
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Scenario #1
Rig floor

Wellhead Jackup rig

Texas deck

Casing string
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

SCENARIO #2
Well: Development
Re-entry: No
Suspension Mode: Platform
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Scenario #2
Rig floor

Wellhead

Platform Jackup rig

Casing
string
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

SCENARIO #3
Well: Development
Re-entry: No
Suspension Mode: Vetco Gray MLH
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Scenario #3
Rig floor

Wellhead

Platform Jackup rig

Casing
string

MLH mudline suspension


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

SCENARIO #4
Well: Development
Re-entry: Yes
Suspension Mode: Vetco Gray MLC
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Animation of Scenario #4
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Types of Mudline Suspension (Vetco Gray)


MLH Mudline Suspension
• 30” x 20” x 13-3/8” x 9-5/8”
casing program
• Mudline hangers land on
landing rings when RIH
• No running or tieback tool used
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Types of MLS (Vetco Gray)


• MLC Mudline Suspension
• 30” x 20” x 13-3/8” x 9-5/8”
casing program
• 4 phases
– RIH with running tool
– Temporarily abandon & install
corrosion cap
– Re-enter & remove corrosion cap
– RIH with tieback tool
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 1 – RIH WITH RUNNING TOOL

20” Casing

20” Running Tool

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 2 – TEMPORARILY ABANDON AND INSTALL
CORROSION CAP
Drill Pipe
20” Casing
Running Tool for Corrosion Cap

20” Running Tool


20” Corrosion Cap

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 2 – TEMPORARILY ABANDON AND INSTALL
CORROSION CAP
Drill Pipe

Running Tool for Corrosion Cap

20” Corrosion Cap

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 3 – RE-ENTER & REMOVE CORROSION CAP

Drill Pipe

Retrieving Tool for Corrosion Cap

20” Corrosion Cap

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 3 – RE-ENTER & REMOVE CORROSION CAP

Drill Pipe

Retrieving Tool for Corrosion Cap

20” Corrosion Cap

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Run-in & tieback procedure (for MLC)


PHASE 4 – RIH WITH TIEBACK TOOL

20” Casing

20” Tieback Tool

30” Casing

30” Landing Ring

20” Mudline Casing Hanger

20” Casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

MLC Components
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Stackdown Drawing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

20” MLC Mudline Casing Hanger


Left-hand
beveled
square
thread

Customer specified thread


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

20” MLC Running / Tieback Tool

Customer specified thread


Elastomer
seals

Washout ports for


flowby during
cementing

Left-hand beveled square thread


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Corrosion Cap
Pin for J-slot Stem

Check valve

Elastomer seal

Left-hand beveled
square thread

Elastomer seal

Used on 20” and Used on 9-5/8”


13-3/8” casing casing
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Corrosion Cap Running Tool

Drill pipe box thread

Stinger

J-slot for running / retrieval


Mini COP,
Mini COPxx– Dec 2006
23 February 2007

DMR Connector

Viewed from underwater ROV

DMR connector being


positioned above mudline
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Overtrawl Frame

Protects DMR connector


that protrudes out from
the mudline from
collisions and falling
objects
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Q&A
Mini COP,
Mini COPxx– Dec 2006
23 February 2007

Appendix