0 оценок0% нашли этот документ полезным (0 голосов)
27 просмотров2 страницы
This document contains cost estimates for concrete, formwork, and reinforcement for the structural beams of a mini sports complex project in Jabi. It provides the volume and costs for concrete pouring for the second basement floor, water tank base, and ground beams. It also includes the areas and costs for forming the beams. Finally, it lists the weights, raw material costs, and placement costs for the bottom bars, top bars, side bars, and stirrup bars of the beams.
This document contains cost estimates for concrete, formwork, and reinforcement for the structural beams of a mini sports complex project in Jabi. It provides the volume and costs for concrete pouring for the second basement floor, water tank base, and ground beams. It also includes the areas and costs for forming the beams. Finally, it lists the weights, raw material costs, and placement costs for the bottom bars, top bars, side bars, and stirrup bars of the beams.
This document contains cost estimates for concrete, formwork, and reinforcement for the structural beams of a mini sports complex project in Jabi. It provides the volume and costs for concrete pouring for the second basement floor, water tank base, and ground beams. It also includes the areas and costs for forming the beams. Finally, it lists the weights, raw material costs, and placement costs for the bottom bars, top bars, side bars, and stirrup bars of the beams.
Job Description : Kompleks Sukan Mini Jabi Designed by : Wanie Date & Time : Tuesday, 3 April, 2018 9:52:47 AM (License Number: EI007-Timer-MY-000075-0-0) _____________________________________________________________________