Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
TOTAL OF ITEM
PRICE SCHEDULE PS-1
Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Testing, Commissioning, Ene
Turnkey basis of:
132 kV XLPE Single circuit from Creek City G/S To DCL G/S
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
300,000.00 1,800,000
2,000,000.00 2,000,000.00
PRICE SCHEDULE PS-1
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
13,753,255.00 247,558,590
PRICE SCHEDULE PS-1
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
PRICE SCHEDULE PS-1
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
PRICE SCHEDULE PS-1
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
PRICE SCHEDULE PS-1
pply, Laying, Construction, Installation, Testing, Commissioning, Energization and Handing over on
Turnkey basis of:
2 kV XLPE Single circuit from Creek City G/S To DCL G/S
2 PID
No. of Pages Issuing department
Unit Rate Total
Local Currency (Pak Rs.) Foreign Local
Erection Testing & Currency Currency
Transport Commiss- Total Component Component
ioning ( USD) (PKR)
(11 + 12 +
13 +14+15) (5 x 10) (5 x 16)
14 15 16 17 18
completion of final route alignment/detail survey and sub-soil investigations.
letion, commissioning and operatioin of the overhead lines shall be deemed to be included in the Schedule of Prices.
Item Description Unit
1 Bedding and Topping - Sand CUM
2 Backfilling with Selected Material CUM
1345 3 Concrete Tiles 50x30x6 SQM
4 Warning Tape L.M
5 Shuttering SQM
6 UPVC Plastic Pipe Dia. 200mm L.M
7 Excavation and Disposal CUM
8 Asphalt Cutting L.M
2119.2 9 Concrete for Crossing CUM
10 Backfilling with Selected Material CUM
11 Subbase CUM
12 Asphalt SQM
13 Thrust Boring L.M
14 Steel Pipe L.M
15 concrete bed CUM
16 Concrete for Joint Pit CUM
500x300x60 17 Steel for Joint Pit Kg
18 Tractor with trailor for drum Machine Months
19 Puller for cable Machine Months
20 Cable Roller No.
120000 21 Crane Machine Months
6.6666666667 22 Lifter Machine Months
23 Flat Bed Machine Months
24 Skilled Labour Man Months
6 25 Unskilled Labour Man Months
26 Testing and Commissionning Lot
Overheads @ 20%
Tax @ 7.5%
Total Cost
200 Contractor's Profit @ 30%
0.628
0.00628
49.298
4929.8
Rate Amount
Members L W H Qty. Total Qty.
(PKR) (PKR)
1 5000 2.2 0.65 7150 7150 2,825.60 20,203,040.00
1 5000 2.2 1.75 19250 19250 777.04 14,958,020.00
1 5000 0.5 2500 2500 1,345.00 3,362,500.00
3 6000 6000 18000 15.00 270,000.00
2 6000 2.4 14400 28800 376.60 10,846,080.00
4 1000 1000 4000 3,800.00 15,200,000.00
1 6000 2.2 2.4 31680 31680 706.40 22,378,752.00
1 2000 2000 100.00 200,000.00
1 900 2.2 0.65 1287 1287 16,000.00 20,592,000.00
1 900 2.2 1.45 2871 2871 777.04 2,230,881.84
1 900 2.2 0.3 594 594 2,750.00 1,633,500.00
1 2200 2200 1,291.20 2,840,640.00
4 100 100 400 5,000.00 2,000,000.00
4 100 100 400 5,500.00 2,200,000.00
1 1000 2.2 0.2 440 440 20,000.00 8,800,000.00
15 28.8 432 21,000.00 9,072,000.00
15 2260.8 33912 100.00 3,391,200.00
8 8 166,500.00 1,332,000.00
4 4 450,000.00 1,800,000.00
150 150 5,000.00 750,000.00
4 4 427,000.00 1,708,000.00
4 4 180,000.00 720,000.00
4 4 160,000.00 640,000.00
40 40 1,200.00 48,000.00
200 200 900.00 180,000.00
1 1 2,000,000.00 2,000,000.00
149,356,613.84
29,871,322.77
11,201,746.04
190,429,682.65
57,128,904.79
247,558,587.44
13,753,254.86
0.009 0.31788
270
1947
2.2 38 1 83.6 38
2.2 32 2 140.8 64
2.2 25 4 220 100
2.2 19 9 376.2 171
2.2 16 2 70.4 32
2.2 15 4 132 60
2.2 13 26 743.6 338
2.2 12 1 26.4 12
2.2 7 10 154 70
50
20 14.4
2,475,585.87 14.4
41,259,764.57