Вы находитесь на странице: 1из 1

REVISED BAR CHART AND S-CURVE

PROJECT TITLE: PROJECT AMOUNT


Proposed Road Improvement of Pangayawan to G.Pelaez Provicial Road PHP 3,953,720.86
LOCATION: CONTRACT TIME:
Gitagum, Misamis Oriental 48 Calendar Days

CONSTRUCTION SCHEDULE :
FIRST QUARTER SECOND QUARTER THIRD QUARTER FORTH QUARTER LIQUIDATED DAMAGES (MAY 13 - OCTOBER 24, 2019)
ITEM NO. DESCRIPTION QTY UNIT UNIT COST AMOUNT WT. CD

103
107
111
115
119
123
127
131
135
139
143
147
151
155
159
163
167
171
175
179
183
187
191
195
199
203
207
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
51
51
53
55
57
59
61
63
65
67
69
71
73
75
77
79
81
83
85
87
89
91
93
95
97
99
1
2
3
4
5
6
7
8
9
311(2) Portland Cement Concrete Pavement 480.00 cu.m 5,658.77 2,716,208.46 68.70% 20.0
201(1) Aggregate Base Course 736.00 cu.m 1,378.30 1,014,426.00 25.66% 10.0
105 Subgrade Preparation 2,800.00 sq.m. 18.40 51,508.80 1.30% 10.0
102(2) Surplus Common Excavation 1,780.86 cu.m 96.35 171,577.60 4.34% 5.0

TOTAL CONTRACT AMOUNT PHP 3,953,720.86 100.00% LIQUIDATED DAMAGES PERIOD

PLAN PERIODIC 100%


PHYSICAL ACCOMPLISHMENT
100.00% COMULATIVE 100%

ACTUAL PERIODIC 93.00% -7.00%


SLIPPAGE 7.00%
100.00% COMULATIVE 93.00% 100.00%

Prepared: Checked: Approved by:

JOEL A. OBINA PAUL JOEL S. WAGA JR. MARIO V. BATAR


Project Engineer Construction Division Chief Provincial Engineer

Вам также может понравиться