1. PENGANTAR REKAYASA
RADIO
Dr. Nachwan Mufti Adriansyah, ST., MT
OUTLINE
1
9/3/2019
Transmission Network
Planning Overview
Scope
Link design: Capacity
LOS planning, planning
RF Device
link budget
RF Device
Bill of
Quantity
(BoQ)
Bill of
Quantity
(BoQ)
4
2
9/3/2019
ResponsibilitasTim
Network Planning Team dan Customer ...responsibilitas
Network Planning Team Customer Network Planning Team Customer
3 2 1 OK 14
10 Detailed
Cost and
Not OK network plan
network
analysis
OK
Not OK
11
Rough 12
equipment list Rollout
for one year ready?
OK 14
6
3
9/3/2019
BTS
BSS BTS
MSC BSS
BSC Hub
BTS
BTS
BTS
BTS
BTS
BTS
4
9/3/2019
Transmission
Network
Design
10
5
9/3/2019
Nominal Plan
Initial Planning / Network Dimensioning / High Level
Planning
11
11
12
6
9/3/2019
13
1. BSC
• Number of:
• Capacity: BTS TRX
Document A-ter
Template: • Location:
Utk Nominal 2. BTS transmission:
Plan (High • Used media:
Level) • priority 1:
• priority 2:
• priority 3:
• priority 4:
14
7
9/3/2019
15
6. Availability objectives
ITU-T or ITU-R recommendation used as reference
Objectives
SESR:
Allowed unavailability:
7. Appendiks
Map ( and countour map)
Capacity calculation
Detail calculation and topology
General network layout drawing (sinopsis, channeling plan, etc)
BoQ (bill of quantity) year by year
16
8
9/3/2019
17
Example Documents
Nominal Planning
18
9
9/3/2019
Capacity Calculations
Modul 2- Transmission Network Design and Documentation 19
19
20
10
9/3/2019
21
21
Site Parameters
No Lokasi Tinggi tower Tinggi Diameter antena Bearing Kapasitas radio Link to
(m) antena (m) (m) (derajat) link
50 3 150 STM1
Palaran
3 Samboja 87 85 2.4 8 16 Mbps
22
11
9/3/2019
23
Transmission Media
Choices
24
12
9/3/2019
Transmission Media
• Cable installation is a very expensive and time consuming task
+
• When building a new network with a tight schedule installing
new physical media is not an option
25
Leased Lines
Transmission lines rented from a “3rd party” operator
Leased line provider is usually also a competitor
Pros: Cons:
No implementation effort for buyer high operating costs
No extra infrastructure to buy unpredictable lead times (installation)
Long distances are uncritical difficult to deploy (may include digging,
Savings in transmission O&M costs groundwork..)
no control over the physical route or the quality
of the link
26
13
9/3/2019
Microwave Links
The preferred media when building new access network links
High capacity transmission links
from 2x2Mbps to 16x2Mbps, 34Mbps and STM-1 (155 Mbps)
Operating frequencies: 2,7,13,15,18,23,26 and 38 GHz band
Pros: Cons:
low operating costs needs frequency license
easy to install environment dependant link quality (e.g.
flexible rainfall)
quick & reliable solution not always available at ideal sites (LOS path)
Repeater
station
Terminal Terminal
station A Modul 1 - Introduction to Transmission Network Planning and Design station B 27
27
28
14
9/3/2019
Network Topology
Menspesifikasikan bagaimana node-node berbeda di dalam
network harus diinterkoneksikan
Konsiderasi:
Transmission Media Roll-out speed
Buy or lease Practical aspects
Efficiency Towers, equipment
Equipment utilization concentration
Flexibility
Easy to expand?
Quality
Network quality
Modul 1 - Introduction to Transmission Network Planning and Design 29
29
Topologi Chain
30
15
9/3/2019
Fundamental Topology-star
Typical application: Hub-sites, leased lines
31
Fundamental Topologies-ring
Typical application: Enhancement of availability of important
traffic
BSC/TRC
Ring
High availability
Non protected systems
One additional link segment required
Every node in the ring requires connections in two directions
32
16
9/3/2019
Combined Topologies
BSC/TRC
Tree
Flexible roll-out
Efficient equipment utilization by grooming
Vulnerable for link failure
Expansions might require upgrading or rearrangement
33
Cluster Topology
12
12
12
2x2 42 0
71
4x2 0 0
12 8x2 0 0
17x2 6 0
12
12
34
17
9/3/2019
35
END
36
18