Академический Документы
Профессиональный Документы
Культура Документы
TRANSPORT
1. Background
51 cars 1 Bus
85 passengers 85 passengers
Case study
in Bandung
Public Transport in Bandung
Most of public transport buses: small buses (angkot)
Number of buses: over 4700
Population: 2.6 million
38 licensed routes
Route length: 9.5 – 26.5 km
Bus frequencies high, average headway 2.2 minutes
Average load factor 68 %
High proportion of public transport trip: 63 %
Less evening buses
Fare: according to the distance, but no seasonal ticket
Case study
in Yogyakarta
Public Transport in Yogyakarta
(before the operation of Trans Jogja)
Most of public transport: medium buses
Number of buses: 591
Population: 1.1 million
19 licensed routes, only 16 routes operated
Route length: 25 – 62 km
Bus frequencies high, average headway in the city
center 12 seconds
Average load factor low (24 %)
Five years ago: 36 %
Only high load factor during peak hour
No evening bus: security problems (pick pocket)
Flat fare, no seasonal ticket
Organization
ORGANDA: the only organization represent the road transport
sector
Only in resolving formal public transport issues: fares and
route arrangements
It represents owners and operators of taxi and buses
For urban city buses: 5 cooperatives under ORGANDA
Every bus owners must be a member of a cooperative.
No timetable
Bus route plan: the jurisdiction of DISHUB (provincial road
transport and traffic unit), after negotiation with ORGANDA
and cooperatives.
Difficult to change the routes because of the difficulty in
negotiations
The reason, using public transport
Flexibility
To stop others
comfortability 4.0% 0.6%
17.3%
no alternative
48.0%
cheap
18.5%
faster
11.6%
For non public transport users: Are you going to use the
buses if the quality is better than the existing one ?
No
45.5%
Yes
54.5%
OTHER CITIES
IN INDONESIA
WAJAH TRANSPORTASI
Public Transport in Jakarta
KOTA
Balikpapan
Manado
Pekanbaru
Sarbagita area
(Denpasar, Badung, Gianyar and Tabanan)
Batubulan terminal
Stop anywhere
Tramway in Surabaya
It was closed in 1968
PT KERETA API ( Persero )
DAERAH OPERASI VIII SURABAYA
PETA DAERAH OPERASI VIII SURABAYA
I
RTUR
BOJONEGORO
LAMONGAN
KALIM YA PASA
SUMBERREJO
SUMLARAN
GEMBONG
GRESIK
BOWERNO
BABAT
CEPU
PUCUK
BENOWO
DUDUK
KAMAL
BANGKALAN
KAPAS
CERME
BA
AS
O
JAWA TENGAH
SURA
IND TELANG PAMEKASAN
KEDUNGPRING
BATAS WILAYAH DAOP VIII SB GAN S BETENG
DAN TANDE
DENGAN DAOP IV SM (KM 126+100) KAN
BLULUK SIDOTOPO SURABAYA GUBENG
SURABAYA KOTA WONOKROMO
KEDUNGGALAR
MADIUN
NGIMBANG SEPANJANG
WALIKUKUN
BOHARAN WARU
KAMBANGAN
NGANJUK
GENENG
BABADAN
WILANGAN
SARADAN
PARON
SRAGEN
BARAT
SUKOMORO
PLOSO
SIDOARJO
BAGOR
CURAHMALANG
SUMOBITO
PETERONGAN
MOJOKERTO
JOMBANG
IL
BANG
NO
KERT SEMBUNG
PURWOASRI AN
UR U
PAS OSO
OS O
PAPAR
WONOKERTO REJ PANARUKAN
TI
MINGGIRAN GRA N GO
EMA ING SITUBONDO
SUSUHAN SUKOREJO BAY BOL
SENGON BATAS WILAYAH DAOP VIII SB
PRO PRAJEKAN
KEDIRI DENGAN DAOP IX JR S
JAWA TIMUR
(KM 48+400) LECE BONOSARE
NGADILUWIH LAWANG
N
BATAS WILAYAH DAOP VIII SB ASA BONDOWOSO
DENGAN DAOP VII MN (KM 64+200) SINGOSARI MAL
KRAS UY OSO
BLIMBING RAN GRUJUGAN
NGUJANG
K AH
MALANGJAGALAN
MALANG KLA TAMANAN
TULUNGAGUNG
MALANG KOTALAMA
BANYUWANGI BARU
PAKISAJI
KEPANJEN
NGEBRUK
SUKOWONO
GONDANGLEGI
SUMBERGEMPOL
NGUNUT
POGAJIH
G
DAMPIT
ARGOPURO
KESAMBEN
REJOTANGAN
GG O
UN
WLINGI
TALUN
SUMBERPUCUNG
UL
T
GARUM
IRO
AG
BLITAR
KARANGASEM
ARI
UJ I
ROGOJAMPI
DU
JAT
SINGOJURUH
TEMUGURUH
SUMBERWADUNG
GLENMORE
KALISETAIL
ALS
LI
KALIBARU
MRAWAN
SEMPOLAN
GARAHAN
KALISAT
LEDOKOMBO
JEMBER
NG
KOTOK
ARJOSO
RAN
BIP
TAN
GS
MA
RA M
BAN
BATAS WILAYAH DAOP VIII SB
DENGAN DAOP VII MN
(KM 134+300)
Desirable path
Public Transport mode share
Feasible Unfeasible
Difficult
Feasible
Do-nothing-path
Timing
Early Appropriate
Late Indicator