Shown on Drawing No. XCH 200076 - AUC Drawing Change Level Dated 01.09.2018
01.09.2018
The above part meets all the specification of HMI and it is confirmed by our inspection and testing
To be Filled By
NAME
VD (GIL) TEAM SIGN
(TEL)
Sr Inspection items Judgement Annexure No
1 Face clean ---- -- 275 --- --- 1 Per Lot Reject / Rework
Inprocess
30 Milling VMC-01
Inspection
1 Drill 24 --- 1 Per Lot Reject / Rework
Inprocess
40 Machining VMC-01 1 Ref. --- - 45.7 --- --- 1 Per Lot Inspection
Reject / Rework
Inprocess
70 Spot facining Radial Drill m/c Spot face cutter -- 45 Vernier --- 1 Per Lot Inspection
Reject / Rework
Inform to
supervisor for
80 Deburing Pencil Grinder 1 No sharp edges 100% Final Inspection
100%
segrigation
PPAP/KIT/01
CONTROL PLAN
Format No.: F/OPQP/15
Responsibility
Inward
Inspector
Inward
Inspector
Prod./ QA
Prod./ QA
Prod./ QA
"
"
"
"
Prod./ QA