Вы находитесь на странице: 1из 22

Formula

TG 570
TB TG BD Request Scheduled BD (MW)
53 434.74 105.60
54 434.74 211.20
55-56 434.74 227.59
57 0.00 121.99
58 0.00 16.39

138.5
88.5
88.5
194.1

405.3 AP 230.55MW
TB AP BD Request Scheduled BD(MW)
61-64 230.55 103.75
65 100.00 100.00
66 50.00 58.24
67 0.00 35.49
68 0.00 12.73

TG 269.45
TB TG BD Request Scheduled BD (MW)

61-64 269.45 121.25


65 0 88.56
66 0 68.07
67 0 41.48
68 0 14.88

36
37
38
39
40

TG 570
TB TG RC Request Scheduled BD (MW)

49 400.00 170.00
50 400.00 170.00
51 570.00 64.40
52 570.00 0.00
570.00 58.80
SEIL Implement Schedule Remarks
329.14
As per ramp down limit
223.54
207.15 As per tech minimum
312.75
As per Ramp Up limit
418.35

As per ramp up limit & share

As per request 0.00


0.00
0.00

0.00 164.4
SEIL Implement Schedule Remarks 281.5
126.80 As per tech minimum & share
130.55 As per request
172.31
195.06 As per ramp Up limit & share
217.82

As per request
#REF!

As per ramp up limit & share

As per request
SEIL Implement Schedule Remarks
148.20 As per tech minimum & share
180.89
201.38
As per ramp Up limit & share
227.97
254.57

As per ramp up limit & share

As per request

As per Ramp Up limit

205.55

SEIL Implement Schedule Remarks


(MW)
400.00
As per request
400.00
505.60 As per Ramp Up limit
570.00 As per request
511.20
As per Technical Min

As per Ramp Up limit


As per Ramp Up limit
As per Ramp Down Share
As per Ramp Up Share
As per Share & Tech Min
As per Share & Tech Min
As per Ramp Up limit

As per ramp down limit


As per request
As per Ramp Up limit
As per Ramp Up limit
694.1 694.1 222.795 471.305
799.7 799.7 256.6909 543.0091
905.3 905.3 290.5868 614.7132
1010.9 1010.9 324.4827 686.4173
TG 269.45
TB TG RE Call Request
46-50 332.94
51
138.5 52
88.5
88.5
194.1

AP 230.55MW
510.9 TB AP BD Request
37 50.00
38 100.00
39 150.00
40 200.00
41-48 230.55
49 200.00
50 150.00
51 100.00
52 50.00
53 0.00

20 50
21 0
22 0

36
37
38
39
40
Formula

Scheduled BD (MW) TPCIL Implement Schedule - 269.45 (MW)


237.06 332.94
521.06 48.94
521.06 48.94
521.06 48.94
521.06 48.94
570
570
570
570

Scheduled BD (MW) TPCIL Implement Schedule - 230.55 (MW)


50.00 180.55
100.00 130.55
138.67 91.88
138.67 91.88
138.67 91.88
200.00 30.55
150.00 80.55
100.00 130.55
50.00 180.55
0.00 230.55

50.00 180.55
17.89 212.66
0.00 230.55

205.55
Remarks
281.50
As per request #REF!

284.00
0.00
As per Technical Min 0.00
48.94

As per Ramp Up Share

Remarks 0.00
#REF!
As per request

As per share tech minimum & share

As per request
As per Ramp Up limit
As per Technical Min

As per Ramp Down Share


As per Ramp Up Share

As per request
As per ramp down limit
As per Tech Min
DATE Time Block No schedule to be implemented
82 426.17
83 373.37

84 320.57

85 267.77
24-01-2019

86 226.17

Delay in sending of revision availability (R5) to SLDC'S


implemented schedule Reason to not implemented proper schedule
426.17 Implemented correctly
373.37 Implemented correctly

punching done in scheduling potal in last minute but


due to time constraint it is not saved .
426.17

ramp down limit 52.8(426.17-373.37=52.8) MW is


implemented in present block w.r.t. to previous block
373.37 According to TG has mentoned 1 Unit BD Iinstruction.

ramp down limit 52.8(373.37-267.77=52.8) MW is


implemented in present block w.r.t. to previous block
267.77 According to TG had mentioned Unit BD Iinstruction.

Due to multiple availability revisions received from


operations to each block and BD instructions recived
availability (R5) to SLDC'S from SLDC'S at same time ,had taken time to send
revision availability .But by phone informed the
availability revision to SLDC'S.
230.55 269.45 570 839.45

670 564.4 333.85 107.1605 226.6895


SEIL P1 Unsold Quantum
From
To Hrs.
Hrs.
2:00 6:00

SEIL P2 Unsold Quantum


From
To Hrs.
Hrs.
9:00 10:00
10:00 11:00
11:00 13:00
13:00 14:00
###

MW

181.00

###

MW

50
115
265
65

Вам также может понравиться