Вы находитесь на странице: 1из 2

3-MONTH ROLLING PROGRAM(T2&T3)

Nov-19 Dec-19 Jan-20

S. No. Description Unit


Planned Achieved Slippage Planned Achieved Slippage Planned Achieved Slippage

1 Pile
Mainline 1.0m Dia 0 10 20
Ramp 1.0m Dia Nos 0 0 0
Ramp 0.80m Dia 0 0 0
2 Pile Cap
Mainline 0 0 2
Nos
Ramp 0 0 0
3 Pier
Mainline 0 0 0
Nos
Ramp 0 0 0
4 Cross Beam/Pier Head
Mainline 0 0 0
Nos
Ramp 0 0 0
5 I-Girder/T-Girder
Mainline 0 0 0
Nos
Ramp 0 0 0
Launching of
6 I-Girder/T-Girder
Mainline 0 0 0
Nos
Ramp 0 0 0
Seismic Buffer and
7 Diaphragm Beam
Mainline 0 0 0
Span
Ramp 0 0 0
8 Elastomeric Bearing Pad
Mainline 0 0 0
Span
Ramp 0 0 0
9 Deck Slab
Mainline 0 0 0
Span
Ramp 0 0 0
10 Median Barrier
Mainline 0 0 0
Span
Ramp 0 0 0
11 Edge Barrier
Mainline 0 0 0
Span
Ramp 0 0 0
12 Expansion Joint
Mainline 0 0 0
Span
Ramp 0 0 0