Вы находитесь на странице: 1из 18

BILL-Pipe Supply & Laying (Pipe Work) For BIRKO ELEVATED Kebele

Item Descriptoin Unit QTY Unit Rate


1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 63mm PN 10,PE100 ml 117.00
1.02 HDPE pipe OD 75mm PN 10,PE100 ml 310.00
1.03 HDPE pipe OD 90mm PN 10,PE100 ml 43.00
HDPE pipe OD 110mm PN 10,PE100 ml 92.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 DCI double flanged Pipe, L= 6m, DN 110 mm Pcs 3
2.02 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 100 mm 2
2.03 Stub flange but weld DN 110mm Pcs 3
2.04 Backing ring flanged 110mm Pcs 3
Bend 90°, DCI, DN 100 mm Pcs 2
2.05 Bolt, nut and washer M-24 Pcs 72
2.06 45o Elbow 90x90mm Pcs 1
2.06 Tee Equal butt weld 110x63x110mm Pcs 1
2.07 Tee Reducer butt weld 110x75x110mm Pcs 1
2.08 Tee Reducer butt weld 90x63x90mm Pcs 1
2.09 Reducer butt weld 110x90mm Pcs 1
2.10 Reducer butt weld 90x63mm Pcs 1
2.11 Welding point 63 mm Fitting WP 3
2.12 Welding point 75 mm Fitting WP 1
2.13 Welding point 90 mm Fitting WP 2
2.14 Welding point 110 mm Fitting WP 4
2.15 Welding point 50 mm Pipe WP
2.16 Welding point 63 mm Pipe WP 2
2.17 Welding point 75 mm Pipe WP 11
2.18 Welding point 90 mm Pipe WP 1
2.19 Welding point 110 mm Pipe WP 3
2.20 Laying and installation of 63mm pipe ml 117.00
2.21 Laying and installation of 75mm pipe ml 310.00
2.22 Laying and installation of 90mm pipe ml 43.00
2.23 Laying and installation of 110mm pipe ml 92.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 369.86
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 336.14
3.50 10cm thick Bedding by selected materials for the whole
m3 33.72
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No
Tees etc
Test, Hand Over and Commissioning
UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount
BILL-Pipe Supply & Laying (Pipe Work) For DHADHAMANE Kebele
Item Descriptoin Unit QTY Unit Rate
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 200mm PN 10,PE100 ml 498.00
1.02 HDPE pipe OD 140mm PN 10,PE100 ml 744.00
1.03 HDPE pipe OD 110mm PN 10,PE100 ml 1,036.00
HDPE pipe OD 75mm PN 10,PE100 ml 2,054.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 Stub flange but weld DN 200mm Pcs 1
2.02 Backing ring flanged 200mm Pcs 4
2.03 Bolt, nut and washer M-24 Pcs 14
2.04 DCI double flanged Pipe, L= 6m, DN 150 mm Pcs 4
2.05 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 150 mm 4
2.06 Stub flange but weld DN 110mm Pcs 2
2.07 Backing ring flanged 160mm Pcs 64
2.08 Bend 90°, DCI, DN 150 mm Pcs 2
2.09 Bolt, nut and washer M-24 Pcs 136
2.10 90o Elbow 75x75mm Pcs 2
2.11 45 Elbow 110x110mm
o
Pcs 54
2.12 Tee Reducer butt weld 200x75x200mm Pcs 1
2.13 Tee Equal butt weld 200x200mm Pcs 1
2.14 Tee Reducer butt weld 110x75x110mm Pcs 3
2.15 Reducer butt weld 200x140mm Pcs 1
2.16 Reducer butt weld 200x110mm Pcs 1
2.17 Reducer butt weld 110x75mm Pcs 3
2.18 Reducer butt weld 200x140mm Pcs
2.19 Welding point 200 mm Fitting WP 5
2.20 Welding point 140 mm Fitting WP 1
2.21 Welding point 110 mm Fitting WP 6
2.22 Welding point 90 mm Fitting WP 4
2.23 Welding point 75 mm Fitting 2
2.24 Welding point 200 mm Pipe WP 41
2.25 Welding point 140 mm Pipe WP 60
2.26 Welding point 110 mm Pipe WP 33
2.27 Welding point 75 mm Pipe WP 37
2.28 Laying and installation of 63mm pipe ml 498.00
2.29 Laying and installation of 200mm pipe ml 744.00
2.30 Laying and installation of 140mm pipe ml 1,036.00
2.31 Laying and installation of 110mm pipe ml 2,054.00
2.32 Laying and installation of 75mm pipe ml 0.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 2,184.24
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 1,831.12
3.50 10cm thick Bedding by selected materials for the whole
formation & backfill by selected material m3 307.10
3.60 Construction of concrete chamber for air valve, washout,
No
Tees etc

Test, Hand Over and Commissioning


UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount

2.4
BILL-Pipe Supply & Laying (Pipe Work) For DhagahleyKebele
Item Descriptoin Unit QTY Unit Rate
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 40mm PN 10,PE100 ml 364.00
1.02 HDPE pipe OD 50mm PN 10,PE100 ml 278.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 Stub flange but weld DN 50mm Pcs 1
2.02 Backing ring flanged 50mm Pcs 4
2.03 Bolt, nut and washer M-24 Pcs 4
2.04 DCI double flanged Pipe, L= 6m, DN 110 mm Pcs 4
2.05 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 110 mm 2
2.06 Stub flange but weld DN 110mm Pcs 3
2.07 Backing ring flanged 110mm Pcs 3
2.08 Bolt, nut and washer M-24 Pcs 98
2.09 Bend 90°, DCI, DN 100 mm Pcs 2
2.10 45o Elbow 40x40mm Pcs 2
2.11 Tee Equal butt weld 50x50mm Pcs 1
2.12 Reducer butt weld 110x50mm Pcs 2
2.13 Reducer butt weld 50x40mm Pcs 2
2.14 Welding point 50 mm Fitting WP 3
2.15 Welding point 40 mm Fitting WP 2
2.16 Welding point 110 mm Pipe 2
2.17 Welding point 50 mm Pipe WP 6
2.18 Welding point 40 mm Pipe WP 2
2.19 Laying and installation of 63mm pipe ml
2.20 Laying and installation of 40mm pipe ml 364.00
2.21 Laying and installation of 50mm pipe ml 278.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 392.64
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 354.12
3.50 10cm thick Bedding by selected materials for the whole
m3 38.52
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No 2
Tees etc

Test, Hand Over and Commissioning


UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount
BILL-Pipe Supply & Laying (Pipe Work) For DhagahleyKebele
Item Descriptoin Unit QTY Unit Rate Amount
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 75mm PN 10,PE100 ml 156.00
1.02 HDPE pipe OD 90mm PN 10,PE100 ml 229.00
1.03 HDPE pipe OD 110mm PN 10,PE100 ml 554.00
2.00
HDPE PE 100,PN10,SDR12 Supply and Installation
of fittings and Other accessories

2.01 Stub flange but weld DN 110mm Pcs 1


2.02 Backing ring flanged 110mm Pcs 1
2.03 Bolt, nut and washer M-24 Pcs 8
2.04 45o Elbow 110x110mm Pcs 2
2.05 90o Elbow 110x110mm Pcs 1
2.06 90o Elbow 90x90mm Pcs 1
2.06 Tee Reducer butt weld 90z75x90mm Pcs 2
2.07 Reducer butt weld 90x75mm Pcs 2
2.07 Welding point 110 mm Fitting WP 6
Welding point 90 mm Fitting 6
2.08 Welding point 75 mm Fitting WP 4
2.09 Welding point 75 mm Pipe WP 6
Welding point 90 mm Pipe 8
2.10 Welding point 110 mm Pipe WP 19
2.11 Laying and installation of 75mm pipe ml 156.00
2.12 Laying and installation of 90mm pipe ml 229.00
2.13 Laying and installation of 110mm pipe ml 554.00

3. Earth Work (Pipe trench Excavation and Backfill)


3.10 Excavation ordinary soil m3 445.05
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 388.71
3.50
10cm thick Bedding by selected materials for the m3 56.34
whole formation & backfill by selected material

3.60 Construction of concrete chamber for air valve,


No 0
washout, Tees etc

Test, Hand Over and Commissioning

UP TO DATE EXCUTED AMOUNT UP TO OCTOBER


BILL-Pipe Supply & Laying (Pipe Work) For Irresaa Kebele
Item Descriptoin Unit QTY Unit Rate
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 180mm PN 10,PE100 ml 403.00
1.02 HDPE pipe OD 125mm PN 10,PE100 ml 377.00
1.03 HDPE pipe OD 90mm PN 10,PE100 ml 249.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 Stub flange but weld DN 180mm Pcs 1
2.02 Backing ring flanged 150mm Pcs 1
2.03 Bolt, nut and washer M-24 Pcs 12
2.05 90o Elbow 125x125mm Pcs 1
2.06 Tee Reducer butt weld 180x125x180mm Pcs 1
2.07 Reducer butt weld 180x90mm Pcs 1
Reducer butt weld 125x90mm Pcs 1
2.07 Welding point 180 mm Fitting WP 2
Welding point 125 mm Fitting WP 3
2.08 Welding point 90 mm Fitting WP 2
2.09 Welding point 180 mm Pipe WP 34
Welding point 125 mm Pipe WP 32
2.10 Welding point 90 mm Pipe WP 9
2.11 Laying and installation of 180mm pipe ml 403.00
2.12 Laying and installation of 125mm pipe ml 377.00
2.13 Laying and installation of 90mm pipe ml 249.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 568.80
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 493.82
3.50 10cm thick Bedding by selected materials for the whole
m3 74.99
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No
Tees etc

Test, Hand Over and Commissioning


UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount
BILL-Pipe Supply & Laying (Pipe Work) For Idishala Kebele
Item Descriptoin Unit QTY Unit Rate
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 110mm PN 10,PE100 ml 288.00
1.02 HDPE pipe OD 90mm PN 10,PE100 ml 17.00
1.03 HDPE pipe OD 75mm PN 10,PE100 ml 292.00
1.04 HDPE pipe OD 63mm PN 10,PE100 ml 470.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of fittings
and Other accessories
2.01 Stub flange but weld DN 100mm Pcs 1
2.02 Backing ring flanged 110mm Pcs 1
2.03 Bolt, nut and washer M-24 Pcs 8
2.04 DCI double flanged Pipe, L= 6m, DN 110 mm Pcs 2
2.05 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 100 mm 4
2.06 Stub flange but weld DN 110mm Pcs 3
2.07 Backing ring flanged 110mm Pcs 3
2.08 Bolt, nut and washer M-24 Pcs 72
2.09 90o Elbow 125x125mm Pcs 2
2.10 Equal Tee butt weld 110x110mm Pcs 1
2.11 Tee Reducer butt weld 90x63x90mm Pcs 1
2.12 Reducer butt weld 110x63mm Pcs 2
2.13 Welding point 110 mm Fitting WP 3
2.14 Welding point 90 mm Fitting WP 3
2.15 Welding point 75 mm Fitting WP 5
2.16 Welding point 63 mm Fitting WP 4
2.17 Welding point 110 mm Pipe WP 3
2.18 Welding point 90 mm Pipe WP 0
2.19 Welding point 75 mm Pipe WP 6
2.20 Welding point 63 mm Pipe WP 4
2.21 Laying and installation of 180mm pipe ml 288.00
2.22 Laying and installation of 125mm pipe ml 17.00
2.23 Laying and installation of 90mm pipe ml 292.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 711.68
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 640.51
3.50 10cm thick Bedding by selected materials for the whole
m3 71.17
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout, Tees
No
etc

Test, Hand Over and Commissioning


UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount
BILL-Pipe Supply & Laying (Pipe Work) For OBOSHA Kebele
Item Descriptoin Unit QTY Unit Rate
1.00 Purchase and Supply of HDPE pipes
1.01 HDPE pipe OD 140mm PN 10,PE100 ml 813.00
1.02 HDPE pipe OD 90mm PN 10,PE100 ml 320.00
1.03 HDPE pipe OD 63mm PN 10,PE100 ml 983.00
2.00 HDPE PE 100,PN10,SDR12 Supply and Installation of
fittings and Other accessories
2.01 DCI double flanged Pipe, L= 6m, DN 150 mm Pcs 2
2.02 DCI double flanged pipe with puddle flange PN 16,
Pcs
L=0.6m, DN 150 mm 4
2.03 Stub flange but weld DN 150mm Pcs 3
2.04 Backing ring flanged 150mm Pcs 3
2.05 Bend 90°, DCI, DN 100 mm Pcs 2
2.06 Bolt, nut and washer M-24 Pcs 72
2.07 45o Elbow 90x90mm Pcs 2
2.08 45 Elbow 63x63mm
o
Pcs 1
2.09 Tee Equal butt weld 140x140mm Pcs 1
2.10 Tee Reducer butt weld 140x90x140mm Pcs 1
2.11 Tee Reducer butt weld 140x63x140mm Pcs 1
2.12 Tee Reducer butt weld 90x63x90mm Pcs 1
2.13 Reducer butt weld 140x63mm Pcs 2
2.14 Reducer butt weld 90x63mm Pcs 1
2.15 Welding point 140 mm Fitting WP 7
2.16 Welding point 90 mm Fitting WP 7
2.17 Welding point 63 mm Fitting WP 7
2.18 Welding point 140 mm Pipe WP 64
2.19 Welding point 90 mm Pipe WP 11
2.20 Welding point 63 mm Pipe WP 16
2.21 Laying and installation of 140mm pipe ml 813.00
2.22 Laying and installation of 90mm pipe ml 320.00
2.23 Laying and installation of 63mm pipe ml 983.00
3. Earth Work (Pipe trench Excavation and Backfill)
3.10 Excavation ordinary soil m3 1,038.62
3.20 Excavation in soft rock m3
3.30 Excavation in hard rock m3
3.40 Backfilling m3 872.35
3.50 10cm thick Bedding by selected materials for the whole
m3 148.67
formation & backfill by selected material
3.60 Construction of concrete chamber for air valve, washout,
No 3
Tees etc

Test, Hand Over and Commissioning


UP TO DATE EXCUTED AMOUNT UP TO OCTOBER
Amount
HDPE pipe OD 40mm PN 10,PE100 364
HDPE pipe OD 50mm PN 10,PE100 278
HDPE pipe OD 63mm PN 10,PE100 1,570
HDPE pipe OD 75mm PN 10,PE100 2,812
HDPE pipe OD 90mm PN 10,PE100 858
HDPE pipe OD 110mm PN 10,PE100 1,970
HDPE pipe OD 125mm PN 10,PE100 377
HDPE pipe OD 140mm PN 10,PE100 1,557
HDPE pipe OD 180mm PN 10,PE100 403
HDPE pipe OD 200mm PN 10,PE100 498
10,687
8678
19365