1
GOVERNMENT OF INDIA ( BHARAT SARKAR )
MINISTRY OF RAILWAYS (RAIL MANTRALAYA)
(RAILWAY BOARD)
………
2(a) Bulk Purchase will be made only from those firms, who are established,
reliable, indigenous main producers of steel having Integrated Steel
Plants (ISP) which includes in-house iron making followed by production
of liquid steel and crude steel with in-house rolling.
2(b) Offers from tenderers having ISPs, who have not supplied the tendered
Items of particular specification, grade and/or quality against Railway
Board Contract in the past, may be considered for educational/
developmental Order if found deserving otherwise.
(R.L. BHARADWAJ)
Director, Rly. Stores (W)
Railway Board
For and on behalf of the President of India.
2
GOVERNMENT OF INDIA ( BHARAT SARKAR )
MINISTRY OF RAILWAYS ( RAIL MANTRALAYA )
(RAILWAY BOARD)
…………
INSTRUCTIONS TO TENDERERS
(a) Bulk Purchase will be made only from those firms, who are established,
reliable, indigenous main producers of steel having integrated Steel Plants
(ISP) which includes in-house iron making followed by production of liquid
steel and crude steel with in-house rolling.
(b) Offers from tenderers having ISPs, who have not supplied the tendered
Items of particular specification, grade and/or quality against Railway Board
Contracts in the past, may be considered for educational/ developmental
Order, if found deserving otherwise.
3
3.0 Preparation of Tender:
3.1 The ‘Offer Form’ should be returned intact whether you are quoting for
any item or not. Pages should not be detached but when items are not
being tendered for, the corresponding space should be defaced by
some such words as ‘Not quoting’.
3.2 In the event of space on the ‘Offer form’ being insufficient, for the
remaining required purpose, additional pages may be added. Each
such additional page must be numbered consecutively, bear the
Tender No. and be fully signed by the Tenderer. In such cases
reference to the additional pages must be made in the Tender form.
3.4 The tender quotations must be in triplicate complete with all technical
information.
4.2 Individual signing the tender or other documents connected with the
contract must specify whether he signed as :
N.B.
(i) In case of 4.2.2, a copy of partnership agreement or general
power of attorney, in either case, attested by a Notary Public,
should be furnished or affidavit on stamped paper of all the
partners admitting execution of the partnership agreement or
the general power of attorney should be furnished.
4
(ii) In case of partnership firms, where no authority to refer disputes
concerning the business of the partnership has been conferred
on any partner, the tender and all other related documents must
be signed by every partner of the firm.
(iii) A person signing the tender form or any documents forming part
of the contract on behalf of another shall be deemed to warrant
that he has authority to bind such other and if, on enquiry, it
appears that the person so signing has no authority to do so,
the Purchaser, may, without prejudice to other civil and criminal
remedies, cancel the contract and hold the signatory liable for
all costs and damages.
4.2.4 Each page of the Tender Offer Form and Annexures, if any, should be
signed by the Tenderer.
To
THE EXECUTIVE DIRECTOR, RAILWAY STORES (S)
MINISTRY OF RAILWAYS (RAILWAY BOARD),
ROOM NO. 326, RAIL BHAVAN, RAISINA ROAD,
NEW DELHI-110001.
6.0 Offers:
All offers addressed to the Executive Director, Railway Stores (S),
Railway Board should be made in the offer form as per Proforma
attached at Annexure ‘A’ and should be clear and complete in all
respects. The offer form should be accompanied by a statement of
Deviations from the Tender specification in the Proforma enclosed as
Annexure ‘C’ and a statement of Deviation from the Standard Terms and
Conditions of the Tender in the Proforma enclosed as Annexure ‘D’.
Manufacturers may enclose with their offer any other documents
containing explanatory memorandum etc., should they so desire, but
reference to these should invariably be quoted in the offer form.
6.1 The price quotation and other financial terms should be given in the
Offer Form and not in the other accompanying documents or statements.
Offers/Price Quotations in any other format will not be accepted. If
necessary, the reverse of the form may also be utilized for this purpose.
6.2 Firms who have not supplied the items tendered for in this case to the
Indian Railways in the past, shall give details of supply made to other
Govt. Deptt./ major parties of the same or similar items.
6.3 Performance statement as per Annexure ‘E’ for the tendered items
should be attached indicating the quantities supplied during the last 5
years giving details of the consignees.
7.1 Firms tendering should note that the offers should remain open for a
period of 150 days for acceptance. If the firms are unable to keep their
offers open for the specified period they should specifically state the
period for which their offers are open but they must realise that such a
provision may prevent their offers from being considered, provided,
however, that in case the day up to which the offer is to remain open is
declared a closed holiday for the Government Offices, the offer shall
remain open for acceptance till the next working day.
6
7.2 Quotations qualified by such vague and indefinite expression, such as
“subject to immediate acceptance”; “subject to prior sale”, will not be
considered.
9.0 Prices:
9.1 Prices quoted shall be the ‘net’ prices per unit and inclusive of packing,
delivery charges and charges for spreading of the material, all tests and
examination for purposes of independent inspection by the Purchaser’s
representatives. The price must be clearly shown in figures and words.
9.2 If it is decided to ask for excise duty or any other charges as extra. The
same must be specifically stated. In the absence of any such stipulation
it will be presumed that the prices include all such charges and no claim
for the same will be entertained.
9.3 In states where Value Added Tax(VAT) regime has come into force, VAT
would be payable extra. The payment of net tax of VAT would be
subject to realization of Input Tax Credit, as admissible, on inputs used
in the manufacture of the final product. In states where VAT regime has
not come into force, Sales Tax at Special Rate of tax, if any, applicable
for Central Govt. Deptt, would be payable extra. The payment of tax
would be subject to realization of set off of tax paid on raw material, as
admissible, on inputs used in the manufacture of the final product.
9.4 The Purchaser shall, however, not be responsible for the payment of
sales tax or any other tax/duties made by the Contractor under
misapprehension of law.
9.5 The price quoted by the tenderers should take into account the credit
availed on inputs under the CENVAT scheme introduced with effect form
1.3.86. The tenderers should give a declaration that any set offs in
respect of duties on inputs as admissible under law is being totally and
unconditionally passed on to the Purchaser in the prices quoted by them.
In case such a declaration is not furnished it will be assumed that any
set-offs in respect of duties on inputs as admissible under law is being
totally and unconditionally passed on to the Purchaser in price quoted by
him and also that the tenderer agrees to pass on such additional duties
7
as set offs as may become available in future in respect of all the inputs
used in the manufacture of the final product on the date of supply under
the CENVAT scheme by way of reduction in prices and advise the
Purchaser accordingly.
9.7 The tenderer should also please note that their FOR quotation will
include free delivery by road within a radius of 10 Kms. from the place
where the stock is held.
9.8 In case the quotation submitted is FOR station of despatch, the supplier
should book the goods freight pre-paid and recover the freight element
through the bills.
9.9 Tenderers are advised to indicate the road freight in the following format
along with PVC based on the price of Diesel. However, movement by
road would be allowed by purchaser in case of exigencies & urgency.
The distance shall be the shortest one reckoned as per Railway Time
Table:
8
BR = Basic Rate
For price variation calculation, the ruling HSD price in Kolkata will be
taken and varied when the Diesel Price has decreased or increased by
more than Rs.1.00 (one) only as compared to last ruling price of
Diesel. It is further mentioned that these freight charges would be all
inclusive of local taxes, if any.
9.10 In case for any particular reason, they want to quote on ex-works basis
they should indicate the difference between the ex-works offer and
station of dispatch offer, failing which their offer is likely to be ignored.
9.11 (a) Wherever all or most of the approved firms quote equal rates and
cartel formation is suspected, Railways reserve the right to place order
on one or more firms with exclusion of the rest without assigning any
reasons thereof.
(b) Firms are expected to quote for quantity not less than 50% of tendered
quantity. Offers for quality less than 50% of tendered quantity will be
considered unresponsive and liable to be rejected in case cartel
formation is suspected. Railways, however, reserve the right to order
on one or more firm any quantity.
(c) The firm(s) who quote in cartel are warned that their names are likely
to be deleted from list of approved sources.
9
depend (in an inverse manner) upon the differential of rates
quoted by the tenderers (other aspects i.e. adequate
capacity cum – capability, satisfactory past performance of
the tenderers, outstanding orders load for the Railway
making the procurement, quoted delivery schedule vis-à-vis
the delivery schedule incorporated in the tender enquiry etc.
being same/similar) in the manner detailed in the table
below:
(iii) The rate of the highest eligible tenderer within the zone of
consideration has to be, per se, reasonable to the
Purchaser.
10
10.0 Delivery:
10.1 The tenderers should indicate clearly the period within which the
stores will be delivered after placement of supply order indicating
monthly rate of supplies.
Illustration:
10.4 Tenderers should declare that exact quantity of suitable raw material
held in stock for the manufacture of the stores described in the
schedule.
10.5 Firms holding contracts for this item against Railway Board’s or
Railway’s orders should indicate the backlog and also the reasons for
the same and probable date of liquidation of the existing load.
10.6 The delivery offered by the tenderers should not be linked with the
receipt of raw materials or with assistance of raw materials by the
Purchaser.
11.3 If the validity of the offer is extended the Earnest Money Deposit/Bank
Guarantee duly extended shall also be furnished failing which the
offer after the expiry of the aforesaid period shall not be considered by
the purchaser.
11.6 The Earnest Money of the successful tenderer will be returned after
the contract Performance Guarantee as required is furnished and
formal contract duly signed is received by the purchaser.
12.2 The Performance Guarantee Bond shall remain in full force and effect
during the period that would be taken for satisfactory performance and
fulfillment in all respects of the contract and shall continue to be
enforceable for six months on each occasion. The extension or
extensions aforesaid, executed on a non-judicial stamp paper for
appropriate value must reach the Purchaser (Government) at least
fifteen days before the date of expiry of the performance Guarantee
Bond on each occasion.
12.3 As and when an amendment is issued to the contract, the Seller shall
within fifteen days of the receipt of such on amendment furnish to the
Purchaser an Amendment to the Performance Guarantee Bond
rendering the same valid for the contract as amended.
12.5 P.G. Bond/S.D should remain valid for a minimum period of 60 (sixty)
days beyond the date of completion of Contractual obligation of the
supplier.
13
15.0 Mill’s Test Certificate: Mill’s Test Certificate at Seller’s cost showing
physical composition and chemical properties are required along with
the supplies.
17.0 Tenderers should indicate the name and address of their banker.
18.0 Transit Insurance:- The purchaser will not pay separately for transit
insurance and the supplier will be responsible till the entire stores
contracted for arrive in good condition at destination.
This office does not pledge itself to accept the lowest or any other
tender and reserves to itself the right to acceptance of the whole or
any part of the tender or portion of quantity offered and you shall
supply the same at the rate quoted. You are at liberty to tender for the
whole or any portion or to state in the tender that rate quoted shall
apply if the entire quantity is taken from you.
22.0 Marking: The marking on all goods supplied shall comply with the
requirements of the Indian Acts relating to the merchandise or any
14
amendment thereof and of the rules made under such acts and the
Seller shall be responsible for the proper and sufficient marking of the
goods so as to be in compliance with the requirements of the said
Acts. Requirements given in the relevant specifications shall be fully
complied with. Attention is also drawn to Clause 1302 of IRS
Conditions of contract. The supplier should also ensure that all
sheets/ plates of Corten steel bear distinct mark made by ink jet
printing with indelible ink.
i. The tenderers must ensure that the conditions laid down for
the submission of offers are correctly and completely
fulfilled.
16
ANNEXURE’A’
We M/s.
……………………………………………………………………………
hereby certify that we are established manufacturers of steel having Integrated
Steel Plants with fasctories at …………………………………………………..,
which are fitted with modern equipment and where the production methods,
quality control and testing of all materials manufactured or used by us are open
to inspection by the representatives of Indian Railways.
Surface finish: SF-I upto 2.24 mm and SF-2 above 2.24 mm and
17
Thickness Width Length
4. We hereby declare that in quoting the prices, we have taken into account
the entire credit on inputs available under the CENVAT scheme introduced with
effect from 01.03.1986.
4.1 We further agree to pass on such additional duties as set offs as may
become available in future in respect of all the inputs used in the manufacture of
the final product on the date of supply under the CENVAT Scheme by way of
reduction of prices and advise the Purchaser accordingly.
4.2. Bills submitted for claiming payments for stores delivered will contain the
following clause:-
5. Period of delivery:-
5.1. Delivery of stores ordered will commence
within___________________(indicate specific period) after
placement of supply order.
5.2 The minimum rate of supplies per month will be _________ tonnes.
5. Copy of Partnership deed of the firm or General Power of Attorney, (in either
case duly attested by Notary Public) and particulars of Sole Proprietorship, if
applicable.
Signature ………….
For and on behalf of…….
19
Annexure ‘B’, Page 1
SCHEDULE OF REQUIREMENTS
(Mild Steel, Special Steel and Corten Steel Sheets & Plates)
1. The requirements of Mild Steel, Special Steel and Corten Steel Sheets
and Plates represent the demand of the consignees spread all over the
country viz. Railway Workshops, Production Units, Wagon and Coach
Builders.
3. If any space is left blank in the space provided for quoting price, it shall be
presumed that the tenderer is not quoting for that item and no
correspondence shall be entertained in this regard later on, on any ground
whatsoever.
4. The exact size of the material shall be indicated at the time of placement
of supply order.
20
Annexure ‘B’, Page 2
Section 'A'
Mild Steel Sheets, Plates & Coils
S. Thickness Width Range BIS Specification Qty. Basic Rate FOR
No. Range (mm) (MTs.) Station of
(mm) Dispatch excl.
ED/ST (`/MT)
1 0.8 to 2 900-1250 IS:513 CRI Gr. O Cu 2,801
2 1.6 to 4 900-1250 IS:1079 HRI Cu 3,606
3 1.6 to 4 900-1250 IS:5986:2011 Gr. 205/ Gr. 235, Cu 891
4 5&6 1200-1500 IS:3502 Type-A/WT 2,202
5 5 to 14 1000-1500 IS:5986:2011 Gr. 235 Cu 318
6 5 to 14 2000-2500 IS:5986:2011 Gr. 235 Cu 250
7 5 to 12 1000-1500 IS: 2062: 2011 E350 BO 1,091
8 5 to 12 1501- 2000 IS: 2062: 2011 E350 BO 401
9 5 to 12 1000 -1500 IS:2062: 2011 E 250 A Cu 36,006
10 5 to 12 1501-2000 IS:2062: 2011 E 250 A Cu 4,740
11 5 to 12 Above 2000 IS:2062:2011 E 250 A Cu 860
12 5 to 12 1000-1500 IS:2062:2011 E 250 BO Cu 5,660
13 5 to 12 1501-2000 IS:2062:2011 E 250 BO Cu 991
14 5 to 12 Above 2000 IS:2062:2011 E 250 BO Normld 2,424
*15 5 to 12 1000-1500 IS:2062:2011 E 250 C Cu 4,000
*16 5 to 12 1501-2000 IS:2062:2011 E 250 C Cu 3,096
*17 5 to 12 Above 2000 IS:2062:2011 E 250 C Cu, Normld 7,450
18 13 to 20 1000-2000 IS:2062:2011 E 250 A Cu 2,367
19 13 to 20 Above 2000 IS:2062:2011 E 250 A Cu 193
20 13 to 20 1000-2000 IS:2062:2011 E 250 BO Cu 2,380
21 13 to 20 Above 2000 IS:2062:2011 E 250 BO Normld 1,767
*22 13 to 20 1500 - 2000 IS:2062:2011 E 250 C Cu, Normld 6,147
*23 13 to 20 Above 2000 IS:2062:2011 E 250 C Cu, Normld 5,083
24 21 to 40 1500 & above IS:2062:2011 E 250 A Cu 615
25 21 to 40 1500 & above IS:2062:2011 E 250 BO Normld 2,093
*26 21 to 40 1500 & above IS:2062:2011 E 250 C Cu, Normld 4,743
27 41 to 80 1500 & above IS:2062:2011 E 250 A Cu 206
28 41 to 100 1500 & above IS:2062:2011 E 250 BO Normld 1,241
*29 41 to 100 2000 & above IS:2062:2011 E 250 C Cu, Normld 180
30 8 to 20 2000 & above IS:2062:2011 E 410 BR Cu 556
31 21 to 40 1500 & above IS:2062:2011 E 410 BR 180
32 41 to 80 1250 - 3200 IS:2062:2011 E410 BR 180
33 13 to 20 2000 & above IS:2062:2011 E300 BO 180
34 21 to 40 1500 - 2000 IS:2062:2011 E300 BO 194
35 41 to 80 1500 - 2000 IS:2062:2011 E300 BO 921
**36 10 to 20 1800 & above IS:2041:2009 Gr. R 260 2,003
**37 21 to 65 1800 & above IS:2041:2009 Gr. R 260 180
Total 1,08,196
21
Annexure – ‘B’, Page 3
*1.0, For Grade C materials impact test to be conducted for all thickness. Impact properties to be
guaranteed at (–) 20 degree centigrade with energy value 27 Joules.
**2.1 The charpy V impact test value should conform to A 20/A 20 M. The same for the
IS:2041:2009 Gr. R 260 is as under:
IS:2041:2009 Gr. R 260 is fully killed with specified minimum tensile strength of over 490 M-pa to
620 M-pa inclusive.
**2.2) The impact testing shall be conducted on test coupon which have been stress relieved as
per stress relieving cycle S-16 of SA-20 of ASTM A-516 which will be taken from normalized
plates.
**2.3) Ultrasonic testing of plates is to be done as per ASTM A-578-A578 M-96 level- A
**2.5) Supply should be made from IBR certified MILL. Firms are advised to enclose requisite
Certificate for IBR Certification. If required inspection has to be done by third party inspection
agency.
**2.6) Requirement in terms of pieces. Hence, while making dispatch, it has to be ensured that
number of pieces in the supply order are supplied.
Schedule-B
Tenderers are advised to quote against Schedule B also otherwise their offer may be
treated as incomplete
22
Annexure ‘B’, Page 4
Section-B
Corten Steel Sheets, Plates & Coils
S.No. Thickness Width range Specification Qty. (In Basic Rate FOR Station of
Range MTs.) Dispatch excl. ED/ST (`/MT)
#
1 1.6-2.0 900-1500 IRSM-41 13,047
2 1.6-2.0 900-1500 (Coil) IRSM-41 12,235
3 2.5 900-1500 IRSM-41 1,025
#
4 3.15-4 900-1500 IRSM-41 6,752
5 3.15-5 900-1250(Coil) IRSM-41 9,177
#
6 5.0-12 900-1500 IRSM-41 19,043
7 5.0-12 1501-3000 IRSM-41 3,889
Total 65,168
Note:
1) In case of Coil, Coil weight should be maximum 10 MT, coil ID 508 mm or 610 mm and
Coil O.D. 1000 mm to 1300 mm.
(a) Subject to ICF Agreement, Coil can be supplied in 14 to 15 MT weight also, keeping the
Coil ID mentioned 610mm (+/-20mm) and Coil OD minimum 900mm or acceptable to
ICF. Confirmation may be obtained from ICF before dispatch.
(b) Subject to RCF agreement, Coil can be supplied in 2.4 to 10 MT weight also, keeping the
Coil ID mentioned 450mm to 800mm and Coil OD 1000 to 1300mm or acceptable to
RCF. Confirmation may be obtained from RCF before dispatch.
#3) For item No 1, 4 & 6, Tenderers are advised to quote for Mill Edge. However, extra
charges for quality in `/MT for TE (Trimmed Edge) to be quoted separately, if any.
23
Annexure ‘B’, Page 5
Section C
Special Steel Sheets and Plates
SN Wagon Size Specification Qty Basic Rate FOR
Type (in MTs) Station of
Dispatch excl.
ED/ST (`/MT)
1 BCNHLM 1.6 x 1200 x 4350 IS 2062: 2011 E-350 BR Cu 3,510
2 BCNHLM 2.5 x 1150 x 6000 IS 2062: 2011 E-450 BR Cu 2,560
3 BCNHLM 2.5 x 1250 x 6000 IS 2062: 2011 E-450 BR Cu 4,110
4 BCNHLM 4 x 1250 x 6600 IS 2062: 2011 E-450 BR Cu 8,720
5 BCNHLM 5 x 1000 x 4500 IS 2062: 2011 E-450 BR Cu 1,500
6 BCNHLM 6 x 1000 x 6800 IS 2062: 2011 E-450 BR Cu 2,920
7 BCNHLM 8 x 800 x 7000 IS 2062: 2011 E-450 BR Cu 5,920
8 BCNHLM 8 x 1250 x 7000 IS 2062: 2011 E-450 BR Cu 5,050
9 BCNHLM 10 x 1250 x 4500 IS 2062: 2011 E-450 BR Cu 480
10 BCNHLM 12 x 1250 x 6300 IS 2062: 2011 E-450 BR Cu 1,310
11 BCNHLM 16 x 1250 x 7100 IS 2062: 2011 E-450 BR Cu 1,130
12 BCNHLM 20 x 1250 x 5600 IS 2062: 2011 E-450 BR Cu 1,390
13 BCNHLM 22 x 1000 x 3900 IS 2062: 2011 E-450 BR Cu 90
14 BCNHLM 25 x 750 x 6300 IS 2062: 2011 E-450 BR Cu 180
15 BCNHLM 40 x 1000 x 3200 IS 2062: 2011 E-450 BR Cu 260
16 BCNHLM 50 x 1200 x 6300 IS 2062: 2011 E-450 BR Cu 940
Total 40,070
Note: Items at S. No. 5, 7, 9 10, 11, 12, 13, 14 and 15 can be supplied in double width and/ or
double length also.
24
ANNEXURE ‘C’
TENDER NO.
NAME OF TENDERER;……………………………………………………………
25
ANNEXURE-D
TENDER NO…………….
NAME OF TENDERER:……………………………………………..
26
ANNEXURE – E
PERFORMANCE STATEMENT
Only items quoted for should be included in this statement. Orders for similar
items should be entered separately, if required.
……………………………………
27
ANNEXURE – F
Details of Plant and Machinery executed and function in each Department Monographs
& description pamphlets) be supplied, if available
4. Whether the process of manufacture in the factory is carried out with the aid of
power or without it.
6. Production capacity of item (s) quoted for, with the existing plant and machinery.
7.1 Normal:
7.2 Maximum:
8 Details of arrangement for quality control of products such as laboratory, etc.
10 Whether stores were tested to any standard specification, if so, copies of original
test certificates should be submitted in triplicate.
11 Are you registered with the Directorate General of Supplies and Disposals, New
Delhi for these stores, if so, furnish full particulars of registration, period of
currency etc.
12 Are you a Small Scale Unit, registered with the National Small Industries
Corporation Limited, for these stores, if so, furnish full particulars of registration
with currency period.
Signature of Tenderer
28
ANNEXURE ‘G ’
Ref…………….. Dated…………
To
Dear Sir,
1 2
3 4
5 6
Date………
Signature……………………….
Place
………………………. Printed Name
(Designation)
Witness
30
ANNEXURE H
The payment so made by us under this Bond shall be a valid discharge of our
liability for payment there under the Contractor(s) /Supplier (s) shall have no
claim against us for making such payment.
For……………………
32