Reviewer Prac 2 Project Classification

Scope of Services Group1. Buildings of the simplest utilization and character which
shall include but not to be limited to the following:
1. Project Definition Phase
2. Schematic Design Phase • Armories
3. Design Development Phase • Bakeries
4. Contract Document Phase • Habitable agricultural buildings
5. Bidding or Negotiation Phase • Freight facilities
6. Construction Phase • Hangars
Identification: • Industrial buildings
• Manufacturing/ industrial plants
Architects. Who acts as the Owner’s/Clients/ Proponents adviser • Other similar utilization type buildings
and or representative. He translates the owner’s needs and • Packaging and processing plants
requirements to spaces and forms the best manner of • Parking structures
professional service. • Printing plants
Definition of Terms: • Public markets
• Service garages
Scope of Services • Simple loft-type buildings
• Warehouses
Project Definition Phase. The phase involves the definition of the
requirements of the project by the Owner. Group2.Buildings of moderate complexity of plan and design.
Construction Phase. Makes periodic visit to the project site to • Art galleries
familiarize himself with the general progress and quality of work • Banks
and to ascertain that the work is proceeding in accordance with • Police station
the contract documents
• Postal facilities
Contract Document Phase. Prepares technical specifications • Private clubs
describing the type and quality of materials, finish, manner of • Retail/wholesale stores
construction and the general conditions under which the project is • School
to be constructed. • Dormitories
• Fire stations
Schematic Design Phase. Prepares the initial line drawings
• Laundries
representing design studies leading to a recommended solution,
• Call centers
including a general description of the project for the approval of
the owner. • Libraries
• Motels
Project Definition Phase. Prepares an initial statement of probable • Multi-storey apartments
construction cost • Nursing Homes
• Residential Condominium
Contract Document Phase. Prepares the complete contract
• Race tracks
documents.
• Park, playround
Project Definition Phase. Consults with the owner to ascertain the
Group 3. Buildings of exceptional character and complexity of plan
conceptual framework and related requirements of the project
and confirms such requirements with him. • Airports
Contract Document Phase. Submits the owner seven set of all • Aquariums
construction drawings and technical specifications for purposes of • Auditoriums
obtaining a building permit. • Breweries
• Cold storage facilities
Construction Phase. Prepares orders, gatehrs and turns over to • Convention facilities
the owner written guarantees required of the Contractor and Sub- • Gymnasium
Contractor
• Hospitals
Bidding Phase. Prepares the bid documents such as forms for • Hotels
contract letting, documents for construction, forms for invitation • Laboratories
and instruction to bidders etc. • Mental institute
• Nuclear facilities
Schematic Design Phase. Submits the owner a Statement of the • Observatories
Probable Project Construction Cost (SPPCC) based on current cost
• Oublic health centers
parameters.
• Stadia
Construction Phase. Make decisions on all claims of the owner • Telecommunication buildings
and contractors on all matters relating to the execution and • Theaters and similar facilities
progress of work of the interpretation of the contract documents • Marinas and resort complexes
Group 4. residences

• Single-detached
• Single attatche or duplex
• Row houses
• Shop houses
• Small apartment
• Townhouses

Multiple of direct personnel Expenses. This cost-based method of


compensation is applicable only to non-creative work such as
accounting, secretarial, research, data gathering, preparation of
reports and the like.

Lump Sump. This method may be applied to government projects


since they entail more paper work and time-consuming efforts.

Group 5. Monumental buildings and other facilities

• Exposition and fair buildings


• Mausoleums, memorials & monuments
• Museums
• Specialized decorative buildings
• Buildings of similar nature use

Group 6. Projects where the plan and related contract documents


are re-used for the repetitive construction of similar buildings
without amending the drawing and the specifications

Professional Fee Plus Expenses. This method of compensation is


frequently used where there is continuing relationship involving a
series of projects. It established a fixed sum over and above the
reimbursement for the architect technical time and overhead

Group 7. Housing project involving the construction of several


residential units on a single site with the use of 1 set of plans

Per Diem. Attending project-related meetings, conference or trips,


conducting ocular inspection of possible project sites, conferring
with others regarding prospective investments or ventures and the
like.

Group 8 project involving extensive details such as design for built


in components or elements

Percentage of Project Construction Cost . The Architect’s fee


based on the PPC shall be detailed in the Architcts guideline

Group 9. Alteration, renovations, rehabilitations, retrofit and


expansion

Group 10. Architect is engaged to render opinion or give advice ,


clarifications or explanation on technical matter pertaining to
architectural works.

Mixed Methods of Compensation. The SPP provides for more than


one method of compensation on a project.