0 оценок0% нашли этот документ полезным (0 голосов)
11 просмотров1 страница
This document outlines a project plan consisting of 5 phases: 1) Planning and Design, 2) Preparation for Installation, 3) Installation, 4) Installation Follow-Up, and 5) Warranty Period. Key activities include kick-off meetings, technical specifications, design plans, equipment ordering, system prototyping, testing, user orientation, and post-installation reviews. The project is scheduled to run from March 2020 through November 2020 with installation at three different sites.
This document outlines a project plan consisting of 5 phases: 1) Planning and Design, 2) Preparation for Installation, 3) Installation, 4) Installation Follow-Up, and 5) Warranty Period. Key activities include kick-off meetings, technical specifications, design plans, equipment ordering, system prototyping, testing, user orientation, and post-installation reviews. The project is scheduled to run from March 2020 through November 2020 with installation at three different sites.
This document outlines a project plan consisting of 5 phases: 1) Planning and Design, 2) Preparation for Installation, 3) Installation, 4) Installation Follow-Up, and 5) Warranty Period. Key activities include kick-off meetings, technical specifications, design plans, equipment ordering, system prototyping, testing, user orientation, and post-installation reviews. The project is scheduled to run from March 2020 through November 2020 with installation at three different sites.