In which situations the retrofit of M

1st case 2nd case

Present situation Present situation


c The protective relays are more than c The network has been improved:
15 years old. v addition of generator sets,
c Spare parts are not available. v addition of transformers working in parallel,
c Protective relays are not periodically checked. v modification or extension of internal
distribution,
Risks v the earthing system has been modified,
v relay coordination was not checked at the time
c Lack of relay setting coordination. of network improvement.
c One relay may not operate or may not operate
correctly. Risks
c Risk of general tripping.
c Risk of production losses. c Lack of relay setting coordination.
c Risk for the persons working in the installation. c Risk of missing protective functions.
c Risk of damaging production facilities. c Risk of general tripping.
c Risk of production losses.
c Risk for the persons working in the installation.
c Risk of damaging the production facilities.
Schneider proposal
c On-site investigation.
c Proposal of MV protection retrofit. Schneider proposal
c On-site investigation.
c Proposal of discrimination studies and
additional protective functions if required.
c Proposal of MV protection retrofit
if required.
V protections is required

31rdst case 4th case

Present situation
c Lack of discrimination.
c Relays operate incorrectly.
Present situation c General tripping.

c Need for high level of availability.


c Need for energy management. Schneider proposal
c Need for network control and monitoring. c On-site investigation.
c Discrimination studies.
c Retrofit of the protective system if required.
Schneider proposal
c On-site investigation.
c Identification of needs.
GE1 GE2
c Proposal of discrimination studies including
logic discrimination.
c Proposal of additional protective functions if
required. TR1 TR2

c Proposal of digital relays with


communication. fault
c Proposal of network control and monitoring
system including energy management, load
shedding and power restoration. tripping

TR3 TR4
Evaluate your situation
○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○
Schneider proposal: Schneider proposal:
c On-site investigation. c On-site investigation.
c Retrofit of MV protection. c Relay testing.
c Retrofit of the protective
system if required.

Yes Are the relays more than 15 years old?

No Are spare parts available?

Schneider proposal:
Are the relays checked at least every 2 years? No c On-site investigation.
c Discrimination studies.
c Improvement of the protective
Has a discrimination study been performed No system if required.
for the existing network? c Retrofit of the protective
system if required.

Has the network been modified or extended


Yes
without a new discrimination study?

Has incorrect relay operation


or general tripping occurred? Yes

Have any relays failed to trip in fault Yes Schneider proposal:


conditions? c On-site investigation.
c Retrofit of the protective
system if required.
Yes Do you need to improve your network control c Additional protective
and supervision system including energy functions if required.
management? c Discrimination studies.

Yes Do you need a high level of availability?

Schneider proposal:
c On-site investigation.
c Identification of needs.
c Proposal according to needs.
Additional information:

c Customer

Contact: c Site location


Should you need
to retrofit your
MV protection. c Site activity
Contact our local
Schneider c Total power required by the site
organisation.
c Cost of one hour of down time

c Need for network control and supervision yes no

c Manufacturers of existing relays


An example of a MV
protection retrofit project
Site location: United Arab Emirates

Site activity: chemical plant

Total power required by the site: 200 MVA

Number of voltage levels: (4) 132 kV, 33 kV, 11 kV, 3.3 kV

Cost of one hour of down time: US$ 200,000

Reasons for the retrofit project:


c Obsolescence of existing relays.
c Lack of spare parts.
c General tripping at 33 kV level due to incorrect operation of
a protective relay at the 3.3 kV level.

Work performed:
c Retrofit of 86 LV compartments of MV cubicles.
c Discrimination study.
c Upgrading of the protective system.
c Upgrading of relay settings.
c Integration of automatic transfers with the digital relays.

Duration of on-site erection and commissioning:


9 months, scheduled according to the availability of the MV cubicles.

Organization of work: three 8-hour shifts


MV protection retrofit
means:
c The renovation of the LV compartment of MV cubicles,
including:
v protective relays,
v metering,
v automation and local control,
v remote control and supervision,
v improvement of the whole protective system
including additional protective functions and
discrimination studies.

LV compartment of MV
The main cubicle before retrofit
benefits of
MV protection
c An answer to our customers’ needs:
retrofit:
Lack of reliability due to obsolescence of protective relays
c optimization
and unavailability of spare parts
of the investment,
c upgrading of the
protective system,
c increase of safety
Need for network control Need for additional
and reliability,
and supervision protective functions due
c integration
to network improvements
of the protective
relays in the network
control and
monitoring system,
c reduction
of maintenance cost, Optimization of the investment
c reduction of the
number of spare
parts.
Retrofit of the protective system including network monitoring
instead of replacement of existing relays

LV compartment of MV
cubicle after retrofit
Schneider is your partner
for the success
of your retrofit projects
Schneider offers
Dedicated services provided
by specialized local teams
c On-site investigations:
v diagnosis of existing relays and protective system,
v survey of existing relays and electrical network configuration,
v identification of additional needs.
c Retrofit proposal:
v quotation for retrofit project including improvement of protective system
and network control.
c Turnkey retrofit project including:
v selection of relays,
v discrimination studies and relay settings,
v checking of CT characteristics,
v programming of control logic,
v cubicle schemes and wiring diagrams,
v door and panel manufacturing,
v on-site erection and commissioning.

Products

c Protective relays, Sepam range:


v a comprehensive range of digital multifunctional relays including:
- protective functions,
- metering,
- programmable control logic,
- communication,
- self-checking,
v dedicated applications for:
- incomers,
- busbars,
- transformers,
- motors,
- generators,
- capacitors,
- cables.
c Supervision and control systems, PowerLogic System:
v flexible control and monitoring systems dedicated to electrical network
and energy management.
Our references

Turnkey retrofit c France:


projects carried out v refineries,
in the following v steel plants,
countries and v glass plants,
areas: v chemical plants,
v paper plants,
v cement plants,
v water treatment plants,
v car industry,
v electronics industry,
v airports.

c Belgium:
v car industry,
v paper plants,
v chemical plants,
v gas treatment,
v textile industry,
v airports.

c Australia:
v distribution of electrical energy,
v mining.

c Bulgaria:
v distribution of electrical energy,
v mining,
v chemical plants.

c Germany:
v metallurgy,
v mechanical industry,
v chemical industry.

c Indonesia:
v refineries.

c Taiwan:
v buildings.

c Brazil:
v refineries.

c Russia:
v refineries.

c United Arab Emirates:


v oil industry.

c Algeria:
v oil industry.

Schneider Electric SA P.O. Box As standards, specifications and designs change This document has been
F-38050 Grenoble cedex 9 from time to time, always ask for confirmation of) printed on ecological paper
Tel: 33 (0)4 76 57 60 60 the information given in this publication.
Fax: 33 (0)4 76 60 58 82
http://www.schneiderelectric.com
e.mail:
service.commc4@mail.schneider.fr Production: Schneider Electric
Design: Insign’ (9902042)
Printing : Imprimerie Les Deux Ponts
PCRED199025EN
Art. 24824 05 / 1999

Вам также может понравиться