Sl. No. Item Description Item Tag# Segment Size Work Sqequences Details Equipment & Gear to be used
203 A/B, 204 Transportation to location by Hydra 100 / 35 Ton Crane, Lifting Gear,
7 Bundle Installation A-204 N/A N/A Trailer 100 Ton Crane, Sackle, Lifting Belt
Trailer
ground i ii)
10 Air Cooler A-301 N/A N/A 100 Ton Crane, Sackle, Lifting Belt
Nut Bol Tightening
P-301 A/B,
A/B, 305
A/B, 306 A/B Nut bolt tihgtening
Note: i) Lifting Data (Radious, Boom Length, Load Capacity) will be updated on form of lifting plan before each and every lift-up.
Prepared By
Project Manager
RPT JV
Lifting
Planed Date
13.11.19
20.11.19
13.11.19
N/A to
20.11.19
16.11.19
20.11.19
16.11.19
17.11.19
18.11.19
N/A to
20.11.19
20.11.19
N/A to
25.11.19
21.11.19
21.11.19
25.11.19
23.11.19
Maximum weight 3 Ton to
25.11.19