REVISED FIRE WATER CALCULATION-POL DEPOT, ASOJ 14/09/2001

Tank No. Class Cap. Dia Ht Area T1101 on fire T1102 on fire T1201 on fire T1301 on fire T1302 on fire
mtrs mtrs m2 lpm/m2 lpm lpm/m2 lpm lpm/m2 lpm lpm/m2 lpm lpm/m2 lpm

T1101 B 3000kl 17 14 748 3 2244 3 2244 1 748 1 748 1 748

T1102 B 3000kl 17 14 748 3 2244 3 2244 3 2244 3 2244 1 748

T1201 B 1500kl 13 12 490 1 490 3 1471 3 1471 3 1471 3 1471

T1301 A 1500kl 14 11.5 506 1 506 3 1518 3 1518 3 1518 3 1518

T1302 B 1500kl 14 11.5 506 1 506 1 506 3 1518 3 1518 3 1518

5990 7983 7499 7499 6003

CRITICAL WATER DEMAND (KLPH) 359 479 450 450 360

FOAM WATER REQUIREMENT

CASE-I 5lpm/sq.mtr 68.1

CASE-II 8.1lpm/sq.mtr 74.8 74.8

CASE-III 12lpm/sq. mtr 6.2455

TOTAL CRITICAL WATER DEMAND 554

HENCE PROVIDE 2 x -----------KLPH @ 105 MLC WORKING + 1 x -----------KLPH @ 105MLC S/B PUMPS

Storage capacity kl
FW Tanks = kl x2 nos

Provide 2 nos x ---------- kl capacity FW storage tanks