Академический Документы
Профессиональный Документы
Культура Документы
___________________________________________
Version 1.0
April 2019
1. MULESOFT SPECIFICATIONS/REQUIREMENTS
The steps that are needed for the TCP/IP connection between Mulesoft and SAP are –
2. Kindly provide the configuration details that are needed by Mulesoft to connect to SAP system –
4. Whitelist the Mulesoft IP Subnet Range – 10.6.140.* (Last 3 digits of IP are dynamic)
6. Share load balancer details for QAS and Prod in the below format :
‘Gateway Options’ to be as per the respective country SAP landscape and system configuration.
2.1.2. RFC Destination – SAP_TO_MULESOFT
‘Gateway Options’ to be as per the respective country SAP landscape and system configuration.
2.1.3. Destination: IPM_ACTUAL_HOURS
‘Gateway Options’ to be as per the respective country SAP landscape and system configuration.
2.1.4. Destination: IPM_ABSENCE_HOURS
‘Gateway Options’ to be as per the respective country SAP landscape and system configuration.
1. Basic Authorizations needs to be provided to the Mulesoft RFC User Id.
2. Please provide SAP ALL access to RFC user in Sandbox.
3. We will provide appropriate Roles and authorization in Quality and Production after setting up
TRACE for the RFC user ID in SAP development environment.