1 Area weightage provided in the respective PW, P & I, WTD Circle Schedules of Rates for
2018-19 shall be applicable to the Schedule of Rates of the Board for the year 2018-19,
excluding cost of Cement, Steel, all category of Pipes & Specials, Valves, Manhole frames &
covers and foot steps.

2 The rates of Cement and Steel considered for preparation of Board SR for 2018-19 is
Rs.4,879/- per MT (Rs.243.95/bag ) and Rs.45,616/- per MT respectively. However cost of
Cement and Steel as notified by the respective PW, P & I, WTD circles from time to time shall
be considered for the preparation of estimates and for Evaluation of Tenders.

3 Basic cost of M.S Pipes considered as Rs. 47,000/- per MT excluding transportation.

4 For labour payment, rates of respective PW, P & I, WTD Circle SR for 2018-19 shall be
followed.

5 The rates for finished item of works indicated in the Schedule of rates are inclusive of all lead,
lift, loading and unloading charges irrespective of mode / type of lead involved. Extra lead,
lift, loading and unloading charges shall not be admissible.

6 The items for which there is no specific rate in the Board S.R, the prevailing S.R of
respective BWSSB/PWD/PRE/Water Resource Department (Minor Irrigation) Circle shall be
adopted.

7 Cost of pipes, valves and other materials considered for arriving the rates for Board SR 2018-
19 are the bare rates. (Excluding GST, but inclusive of all other charges & FOR in Karnataka).

8 GST @ 12% shall be added separately in the estimate as per Govt. Letter No. PWD 65 RDF
2017, dated:11.10.2018.

9 All the pipes, valves and specials shall conform to relevant BIS specification.
10 For all repair works of water supply and UGD pipeline, 50% over the normal rates are
applicable excluding cost of all materials noted in Sl No. (1) above.

11 In the tender notification, a separate clause mentioning "GST shall be paid to the tendered
amount separately" is to be published.

12 The increase in GST shall not be paid in the extended period of contract for which the
contractor alone is responsible for delay as determined by the authority while granting the
extension of time.
13 New Items / innovative items introduced in the Schedule of Rates - 2018-19 shall be operated
on pilot basis only after the approval of Chief Engineer. After successful completion &
commissioning, can be used for projects on regular basis.

14 For Electrical works the prevailing PW, P & I, WTD (Electrical) Schedule of Rates of
respective circles or ESCOM/ KPTCL Schedule of Rates shall be adopted.

15 If the rates for certain items of works are not found in this SR, then such items shall be
obtained from SR of PW,P & IWTD / Minor Irrigation / BWSSB / RDPR / RWS / National
Highway.

16 Royalty charges for materials supplied / used by the Contractors from the Government land
and quarries shall be recovered as per the latest Government order.
17 The natural / river sand to be used shall be clean, sieved and of good quality. As far as
possible natural / river sand shall be used. Whenever there is scarcity of natural / river sand,
manufactured sand / crushed sand can be used to a maximum extent of 50% of toal sand
quantity for plastering items and 100% for concrete items. The certification by the concerned
Executive Engineer is mandatory for usage of artificial / manufactured sand.

18 The use of filtered sand is totally banned in all items of civil works.
SCHEDULE OF RATES 2018-19

PART-1- Labour Charges for Service

Item
Specification Unit
No.
1 a) Loading or unloading from any conveyance of pipes and specials MT
weighing upto 300 Kgs. a piece, steel and cement etc.,

b) -do- weighing more than 300 Kgs. a piece MT


c) Stacking the materials like pipes and specials, weighing upto 300 MT
Kgs. a piece, steel and cement etc.,
d) -do- weighing more than 300 Kgs. a piece MT
2 Conveyance Charges by Lorry
a) 0 - 5 K.M MT
b) Beyond 5 and upto 10 K.M MT/KM
c) Beyond 10 and upto 15 K.M MT/KM
d) Beyond 15 and upto 20 K.M MT/KM
e) Beyond 20 and upto 30 K.M MT/KM
f) Beyond 30 and upto 50 K.M MT/KM
g) Beyond 50 K.M MT/KM
Note:
1) The above rates are not cumulative, only one rate has to be adopted
with regard to the total distance involved.
2) For transportation of PVC pipes, 100% extra over the normal rates
may be allowed as the volume to weight ratio works out to 2 for this
category.

3) For transportation of RCC pipes 30% extra over the normal rates
may be allowed.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


3.00 Conducting Differential Global Positioning System (DGPS) survey
using all required equipments, Base receiver, roving receiver, required
software, skilled staff, transportation, etc., for locating Benchmarks as
per Mean Sea Level (MSL) for at strategic locations (For Water
Supply: Jackwell, IPS, WTP, MBRs, ESRs, etc., For Under ground
drainage: Wetwells, STP, etc.,) marking MSL levels on existing
structure with enamel paint and also on Schematic Map or Google
Map alongwith location and levels including soft copy of drawings
along with source file and hard copy in 3 sets. hard copy in 3 sets.

Points No
4 (a) Conducting Topographical GIS survey including locating road
boundary, type of road, existing features like Valves/chambers,
manholes, Electric poles, trees, etc., and marking on the drawing as
per standard practice in different layers, for the proposed WS/ Under
ground drainage scheme including soft copy of drawings in shape
files along with source file and hard copy in 3 sets.

Upto 5 kms km
Beyond 5 kms upto10 kms km
Beyond 10 kms km
(b) ---- Do ---- Block level survey Hectare

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Rate
(in Rs.)
258.00

383.00
79.00

95.00

144.00
27.00
20.00
18.00
16.00
14.00
12.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


4000.00

5000.00
4000.00
3150.00
1250.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


PART - II : PIPELINE WORKS FOR WATER SUPPLY

Item Rate
Specification Unit
No. (in Rs.)
I Excavation
1 Earth work excavation by manual means for pipeline trenches (except
building works) including depositing on bank with all lead including
shoring, strutting, barricading, danger lighting and using sight rails and
boning rods at every 100 metres wherever necessary as directed in the
following strata.

i) -do- In all soils mixed with boulders upto 30 cms.size and exclusive of
disintegrated rock.
a) 0 to 2 Mtr depth Cum 262.00
b) 2 to 4 Mtr depth Cum 348.00
c) 4 to 6 Mtr depth Cum 463.00
d) 6 to 8 Mtr depth Cum 564.00
e) 8 to 10 Mtr depth Cum
651.00
Note : For depth beyond 10 Mtr. add Rs. 103.00 per Cum. for every
additional 2 Mtr. depth or part thereof.
ii) -do- in disintegrated rock, soft rock, soft shale and medium hard rock
comprising of Lime stone, sand stone, hard shale, schiest, fissured rock
without resorting to blasting

a) 0 to 2 Mtr depth Cum 592.00


b) 2 to 4 Mtr depth Cum 663.00
c) 4 to 6 Mtr depth Cum 766.00
d) 6 to 8 Mtr depth Cum 837.00
e) 8 to 10 Mtr depth Cum 904.00
Note : For depth beyond 10 Mtr. add Rs. 105.00 per Cum. for every
additional 2 Mtr. depth or part thereof.

iii) -do- in hard laterite rock or hard laterite rock containing iron ore upto
20% by chistelling and trimming to proper slope.
a) 0 to 2 Mtr depth Cum 903.00
b) 2 to 4 Mtr depth Cum 1,081.00
c) 4 to 6 Mtr depth Cum 1,171.00
d) 6 to 8 Mtr depth Cum 1,260.00
e) 8 to 10 Mtr depth Cum 1,350.00
Note : For depth beyond 10 Mtr. add Rs. 153.00 per Cum. for every
additional 2 Mtr. depth or part thereof.
iv) -do- in hard laterite rock containing above 20% iron ore by chistelling
and trimming to proper slope.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
a) 0 to 2 Mtr depth Cum 1,915.00
b) 2 to 4 Mtr depth Cum 2,010.00
c) 4 to 6 Mtr depth Cum 2,104.00
d) 6 to 8 Mtr depth Cum 2,295.00
e) 8 to 10 Mtr depth Cum 2,484.00
Note : For depth beyond 10 Mtr. add Rs. 153.00 per Cum. for every
additional 2 Mtr. depth or part thereof.
v) -do- in hard rock by chistelling :
a) 0 to 2 Mtr depth Cum 2,385.00
b) 2 to 4 Mtr depth Cum 2,559.00
c) 4 to 6 Mtr depth Cum 2,646.00
d) 6 to 8 Mtr depth Cum 2,730.00
e) 8 to 10 Mtr depth Cum 2,904.00
Note : For depth beyond 10 Mtr. add Rs.255.00 per Cum for every
additional 2 Mtr. depth or part thereof.
vi) -do- in hard rock by blasting :
a) 0 to 2 Mtr depth Cum 1,326.00
b) 2 to 4 Mtr depth Cum 1,530.00
c) 4 to 6 Mtr depth Cum 1,597.00
d) 6 to 8 Mtr depth Cum 1,732.00
e) 8 to 10 Mtr depth Cum 1,869.00
Note : 1) For depth beyond 10 Mtr. add Rs. 255.00 per Cum for every
additional 2 Mtr. depth or part thereof.
2) Where excavation has to be done in hard rock by controlled blasting in
residential areas or in the vicinity of vital structures, where blasting is
prohibited (to be certified by the E.E.) an additional rate of Rs. 375.00 per
Cum. shall be paid over the rates of item 1(vi).If the total financial
implication is more than 2 lakhs to be approved by CE.

vii) Earthwork Excavation by Mechanical Means


vii.1 Earthwork in excavation for foundations of structures by Mechanical Means
as per drawing and technical specification, including setting out, construction of
shoring, strutting, barricading, danger lighting, bracing, removal of slumps and
other deleterious matter, dressing of sides and levelling the bottom of trench to
the extent required , utilising the available excavated earth locally for the work
etc., complete (Depth upto 3m).

a) -do- In Ordinary / All soils / Hard soil Cum 87.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
b) Ordinary rock comprising of lime stone, sand stone, hard laterite, fissured Cum 116.00
rock, conglomerate or other soft or disintegrated rock which may be
querried or split with crow bars. Boulders which do not require blasting
having max. dia in any direction of more than 300mm; found lying loose
on the surface or embedded in river bed, soil, talus, slope wash and terrace
material of dissimilar origin.

c) Hard rock - Any rock or cement concrete or RCC, excavation of which Cum 677.00
require the use of mechanical plant.

vii.2. Earth work in excavation for pipeline trenches upto 600 mm trench width as
per drawing and technical specification, including setting out, construction of
shoring, strutting, barricading, danger lighting, bracing, using sight rails &
boning rods at every 100 mm whevere necessary as directed, removal of slumps
and other deleterious matter, dressing of sides and levelling the bottom of
trench to the extent required , utilising the available excavated earth locally for
the work etc., complete in the following strata. (Depth upto 3m)

a) -do- In Ordinary / All soils / Hard soil Cum 130.00


b) Ordinary rock comprising of lime stone, sand stone, hard laterite, fissured Cum 174.00
rock, conglomerate or other soft or disintegrated rock which may be
querried or split with crow bars. Boulders which do not require blasting
having max. dia in any direction of more than 300mm; found lying loose
on the surface or embedded in river bed, soil, talus, slope wash and terrace
material of dissimilar origin.

c) Hard rock - Any rock or cement concrete or RCC, excavation of which Cum 1,015.00
require the use of mechanical plant.
vii.3 Earth work in excavation for pipeline trenches beyond 600 mm and upto
1500 mm trench width as per drawing and technical specification, including
setting out, construction of shoring, strutting, barricading, danger lighting,
bracing, using sight rails & boning rods at every 100 mm whevere necessary as
directed, removal of slumps and other deleterious matter, dressing of sides and
levelling the bottom of trench to the extent required , utilising the available
excavated earth locally for the work etc., complete in the following strata.
(Depth upto 3m)

a) -do- Ordinary / Hard soil Cum 108.00


b) Ordinary rock comprising of lime stone, sand stone, hard laterite, fissured Cum 144.00
rock, conglomerate or other soft or disintegrated rock which may be
querried or split with crow bars. Boulders which do not require blasting
having max. dia in any direction of more than 300mm; found lying loose
on the surface or embedded in river bed, soil, talus, slope wash and terrace
material of dissimilar origin.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
c) Hard rock - Any rock or cement concrete or RCC, excavation of which Cum 846.00
require the use of mechanical plant.

viii. In all Soils: this shall include


1)
1. Soft clay, soft murrum, gravel shale etc. including Stiff heavy clay, hard
shale or compact murrum requiring drifting tool or pick axe or both and
shovel closely applied.
2. Gravel, soft laterite, kankar and cobble stone having maximum diameter
in any one direction between 75 mm and 300 mm.
3. Soling of road paths etc., and hard core.
4. Macadam surfaces such as water-bound and bitumen / tar bound.
5. Lime concrete, stone masonry in lime /cement mortar below ground
level.
6. Soft Conglomerate, where the stones may be detached from the matrix
with pick axe.
7. Generally any meterial which requires the close application of pickaxe
or scarifiers to loosen and not offering resistance to digging, greater than
that offered by the hardest of any soil mentioned in 1 to 6 above.
2) D.I.R. soft rock and medium hard rock / ordinary rock.
1. Ordinary rock comprising of lime stone, sand stone, hard laterite,
fissured rock, conglomerate or other soft or disintegrated rock which may
be quarried or split with crow bars.
2. Un-reinforced cement concrete which may be broken up with crow bars
or pick axe and stone masonry in cement mortar below ground level.

3. Boulders which do not require blasting having maximum diameter in


any direction of more than 300 mm; found lying loose on the surface or
embeded in river bed, soil, talus, slope wash; and terrace material of
dissimilar origin.
Note:Hard laterite does not require blasting. It is to be classified under
ordinary rock which does not require blasting.
3) Hard Rock:
This shall comprise
1. Any rock or cement concrete or RCC, excavation of which require the
use of mechanical plant or blasting.
2. Boulders requiring blasting.
2 Refilling pipeline trenches and foundation with selected available earth Cum 103.00
from trench excavation and foundation including watering, consolidation
in layers of 15 cms., thickness with Vibro Rollers including disposing off
the surplus earth with all lead and lift.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
Note: In exceptional cases, earth may be obtained from borrow pit with
extra lead, duly obtaing approval from Chief Engineer.

3 Carting of excavated earth of all types upto a distance mentioned below


and re-carting back to the same site by vehicle including loading,
unloading charges for to & fro, with all lifts and labour, HOM of
machinary etc, complete after obtaining the approval of the Chief
Engineer.

a Upto 1.0 km Cum 203.00


b 1.0 to 2.0 km Cum 226.00
c 2.0 to 3.0 km Cum 247.00
d 3.0 to 4.0 km Cum 266.00
e 4.0 to 5.0 km Cum 285.00
f Every Km beyond 5.0 Km Cum 14.00

4 Extra charges for excavation in all classifications in watery situation or


foul conditions may be paid as under towards dewatering with an
overnight recuperation upto one metre depth and there of as below.

(1) 0 to 2 Mtr depth Cum 93.00


(2) 2 to 4 Mtr depth Cum 133.00
(3) 4 to 6 Mtr depth Cum 175.00
(4) 6 to 8 Mtr depth Cum 223.00
(5) 8 Metres and beyond Cum 279.00
5 Cutting road surface for pipeline trenches and disposing off the excavated
stuff with all lead and lift as directed including barricading, danger
lighting etc., in the following classifications.

(1) Cutting macadam road Cum 346.00


(2) Cutting asphalt road Cum 635.00
(3) Cutting cement concrete road Cum 1,274.00
6. 1 Providing course Sand Bedding for the pipeline trenches including Cum 1,777.00
watering and consolidation by punners etc., complete with all lead and lift
(In Black Cotton soil and rock reaches).
6. 2 Providing Murrum / Gravel Bedding for the pipeline trenches including Cum 271.00
watering and consolidation by punners etc., complete with all lead and lift
(In Black Cotton soil and rock reaches).

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
Note :

1 Earth work excavation by manual means shall be adopted for W/S


pipeline/sewer trench works within city/ town limits wherever, the
Road width is less than 3.7 mtr width, except for OHT, GLSR/ Sump,
WTP/STP and valve chambers / Jackwell / Openwell / Wetwell.

2 Earth work excavation by mechanical means shall be adopted for the


W/S pipeline/ sewer trench works outside city/town limit wherever,
the Road width is more than 3.7 mtr and for OHT, GLSR/Sump, WTP
/STP, Valve chambers and outfall sewer line and also for layouts etc.

3 The Executive Engineer shall certify wherever, whenever specific changes


in the above methods of excavation is required with specific inspection
reports while preparing the estimates or during implementation with the
prior approval of Chief Engineer. If the financial implications exceeds 2
lakhs, prior approval is essential.

4 For all items coming under pipe laying and jointing works either for Water
Supply or for U.G.D. works in dewatering situation, 50% excess over the
rates allowed for pipe laying and jointing is applicable.

5 The measurement of earth work for pipe trenches shall be confined only to
the excavation done below the classification of the road crest.

6 Payment for excavation of pipe trenches will be restricted to the


dimensions shown either in the drawing or estimate irrespective of
whether the excavation is done in earth or rock. In case of variation in
dimensions, the dimensions given at the time of markout will be final.
(The dimensions shall strictly confirm to I.S. No 3114 of 1965).

7 Excavation for water supply pipe line trenches will be governed by the
following condition. In case of S & S, tyton or other types of pipes
wherever required for lead joints, mechanical Joints with rubber gasket or
any other type of moulded joints etc., extra payment will be made for
caulking pits or collar pits at the same rate for excavation of pipe trenches.
The condition is also applicable for pipelines laid for U.G.D. works.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
8 In case of excavation for trenches in hard rock by blasting, and hard
laterite rock containing iron ore, the quantity of rock removed will have to
be stacked and shall be checked with the actual section measurements and
the lesser of the two will be paid for, duly deducting 40% for voids in the
stack measurements. The Executive Engineer should certify the
classification of hard laterite rock containing iron ore along with test
reports from reputed institutions.

9 Shoring and strutting will be provided upto a depth of 2 metres beyond


which depending upon the nature of the soil, steps will be provided at
every lift of 2.0 Mtr. including shoring and strutting the steps width shall
vary from 0.3 metres to 0.45 metres depending upon the nature of the
strata on either side of trench.

10 The minimum width of trench shall be as per the I.S.S.


11 In special circumstances where earth work excavation has to be done in
hard rock by chistelling in residential areas where blasting is prohibited,
the sectional measurement given for chistelling shall be cent percent check
measured by the E.E. Random checking shall be done by the C.E. during
the course of inspection of the works. If the cost of this items or
component in any tendered work, exceeds Rs. 2 lakhs, the E.E. shall
however have to make an advance report to C.E. Whenever such item is to
be taken up for execution.

12 When the overnight recuperation exceeds one Metre depth, a rate analysis
may be worked out based on actual observations and got approved by C.E.

13 Where earth work excavation has to be done in hard lateriate rock


containing above 20% Iron ore, by chistelling, the sectional measurements
shall be cent percent check measured by the concerned Executive
Engineer. If the cost of this item or component in any tendered work,
exceeds or is likely to exceed Rs. 2.00 Lakhs, random checking shall be
done by the Chief Engineer in respect of this item, during the inspection of
works. The Executive Engineer shall have to make an advance report to
Chief Engineer, when such chistelling work is to be done or taken up for
execution, with necessary soil test report from reputed institutions.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item Rate
Specification Unit
No. (in Rs.)
14 Where earth work excavation has to be done in hard rock by controlled
blasting, the sectional measurements for controlled blasting shall be cent
percent check measured by the concerned Executive Engineer. If the cost
of this item or component in any tendered work, exceeds or is likely to
exceed Rs. 2.00 Lakhs, random checking shall be done by the Chief
Engineer in respect of this item, during the inspection of works. The
Executive Engineer shall have to make an advance report to Chief
Engineer, when such controlled blasting work is to be done or is taken up
for execution.

15 For trial pit excavation 50% extra over normal rates is applicable.

16 If excavation is done in slushy soil add 50% extra over normal rates.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Item
Specification
No.
1 2 3 4
II Pipeline laying works
Note: Hydraulic test for pipes is to be conducted to the required pressure as per relevant ISS. Contracto
his own arrangements for procuring water for testing.

1 Supplying, laying, jointing, testing and commissioning of GI pipes conforming to IS1239:1990


amendments including fixing collars, elbows, tees, bends, gland cocks and other fittings (excluding cost
with cuts and threads wherever necessary including conveying the materials to workspot including testin
tightness, with all lead & lifts (contractor will make his own arrangements for procuring water for testing)

Cost of pipe
Sl. No. Particulars of pipe Unit per Mtr.
(in Rs.)

1 2 3 4
i G.I Pipe - Heavy Duty
1) 15 mm dia Mtr 83.00
2) 20 mm dia Mtr 107.00
3) 25 mm dia Mtr 168.00
4) 32 mm dia Mtr 218.00
5) 40 mm dia Mtr 251.00
6) 50 mm dia Mtr 357.00
7) 65 mm dia Mtr 459.00
8) 80 mm dia Mtr 572.00
9) 100mm dia Mtr 838.00
ii G.I Pipe - Medium Duty
1) 15 mm dia Mtr 69.00
2) 20 mm dia Mtr 90.00
3) 25 mm dia Mtr 138.00
4) 32 mm dia Mtr 179.00
5) 40 mm dia Mtr 205.00
6) 50 mm dia Mtr 289.00
7) 65 mm dia Mtr 370.00
8) 80 mm dia Mtr 481.00
9) 100mm dia Mtr 705.00
iii G.I Pipe - Light Duty
1) 15 mm dia Mtr 49.00
2) 20 mm dia Mtr 71.00
3) 25 mm dia Mtr 113.00
4) 32 mm dia Mtr 146.00
5) 40 mm dia Mtr 185.00
6) 50 mm dia Mtr 234.00
7) 65 mm dia Mtr 329.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
8) 80 mm dia Mtr 388.00
9) 100mm dia Mtr 562.00
2 Removing the G.I. pipes, cleaning, washing and using at spot or conveying from workspot to office/sto
lead and lift including removal of all items such as collars, elbows, tees, bends, gland cocks, cuts and thr

1) 15 mm to 25 mm dia
2) 32 mm to 80 mm dia
3) 100 mm dia
3 Cutting and threading G.I. pipes for pump fitting, public fountains etc., where the length of pipe laid is
metres
1) 15 mm dia to 32 mm dia
2) 40 mm dia
3) 50 mm dia
4) 65 mm dia
5) 80 mm dia
6) 100 mm dia
4 (1) Cuts of D.I Pipes already laid in the ground (cutting charges only)
1) 100 mm dia
2) 150 mm dia
3) 200 mm dia
4) 250 mm dia
5) 300 mm dia
6) 350 mm dia
7) 400 mm dia
8) 450 mm dia
9) 500 mm dia
10) 600 mm dia
11) 700 mm dia
12) 750 mm dia
13) 900 mm dia
(2) Cuts of D.I pipes yet to be laid on the ground (Cutting charges only)

1) 100 mm dia
2) 150 mm dia
3) 200 mm dia
4) 250 mm dia
5) 300 mm dia
6) 350 mm dia
7) 400 mm dia
8) 450 mm dia
9) 500 mm dia
10) 600 mm dia
11) 700 mm dia

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
12) 750 mm dia
13) 900 mm dia
5 Supplying Ductile Iron pipes conforming to IS 8329:2000 with latest amendments and conveying to work
and lowering into trenches, laying true to line, level and perfect linking at joints, testing and com
including loading and unloading at both destinations and cuts of pipes wherever necessary including joi
pipes and specials, (excluding cost of specials) with rubber gaskets including cleaning the socket and
with soap solution and applying soft soap to the spigot and socket ends before insertion of rubber gask
and fixing in perfect conditions including cost of soap solution, soft soap, waste etc. and giving necessar
test to the required pressure as per ISS with all lead and lift including cost of jointing materials. (con
make his own arrangements for procuring water for testing).

NOTE: In sewerage projects, High Alumina Cement (HAC) is permitted for internal cement mortor lining
DI pipes as recommended in Annexure B, Clause 16.3 of IS 8329:2000 in place of Slag or Sulphate
Cement (SRC) @ no extra cost.

Cost of Pipe
Sl. No. Particulars of pipe Unit per Mtr.
(in Rs.)

1 2 3 4
i K-7 CLASS
1) 100 mm dia Mtr 831.00
2) 150 mm dia Mtr 1205.00
3) 200 mm dia Mtr 1689.00
4) 250 mm dia Mtr 2222.00
5) 300 mm dia Mtr 2807.00
6) 350 mm dia Mtr 3502.00
7) 400 mm dia Mtr 4190.00
8) 450 mm dia Mtr 4933.00
9) 500 mm dia Mtr 5808.00
10) 600 mm dia Mtr 7669.00
11) 700 mm dia Mtr 9463.00
12) 750 mm dia Mtr 10903.00
13) 800 mm dia Mtr 12194.00
14) 900 mm dia Mtr 14808.00
15) 1000 mm dia Mtr 18442.00

ii K-9 CLASS
1) 100 mm dia Mtr 960.00
2) 150 mm dia Mtr 1389.00
3) 200 mm dia Mtr 1998.00
4) 250 mm dia Mtr 2679.00
5) 300 mm dia Mtr 3386.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
6) 350 mm dia Mtr 4259.00
7) 400 mm dia Mtr 5103.00
8) 450 mm dia Mtr 6083.00
9) 500 mm dia Mtr 7069.00
10) 600 mm dia Mtr 9330.00
11) 700 mm dia Mtr 10696.00
12) 750 mm dia Mtr 11989.00
13) 800 mm dia Mtr 13278.00
14) 900 mm dia Mtr 16111.00
15) 1000 mm dia Mtr 19223.00
16) 1100 mm dia Mtr 23663.00
17) 1200 mm dia Mtr 28975.00

6 Supplying and fixing of DI specials with ISI mark conforming to IS


9523 / 2000 suitable for jointing 100 mm to 600 mm dia DI pipes coated
with rust prevention coatings as below:

A) External coating:
a) Metalic zinc with finishing layer of bituminous as per Annexure "A"
of IS:9523/2000
b) Zinc rich paint with finishing layer of bituminous as per Annexure
"A" of IS:9523 / 2000
c) Bituminous pain as per Annexure "C" of IS:9523 / 2000
B) Internal Lining:
a) Portaland Cement (with or without additives) mortar as per Annexure
- "B" of IS:9523/2000
b) Cement Mortar with coat coat as per Annexure "B" of IS:9523 / 2000
c) Bituminous pain as per Annexure "C" of IS:9523 / 2000

7 Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying t
rolling and lowering into trenches, laying true to line and level and perfect linking at joints,
commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessar
jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all l
all lead & lift including encasing the pipe alround to a depth of not less than 15cms with soft gravel or se
available from the excavation etc. complete and giving necessary hydraulic test to the required pressure
(contractor will make his own arrangements for procuring water for testing).

Cost of Pipe
Outer dia of Pipes in mm
Sl. No. Unit per Mtr.
& Working Pressure. (in Rs.)

1 2 3 4
1) 25 -10 Kg/cm2 (Class5) Mtr 27.00
2) 32 - 10 Kg/cm2 (Class5) Mtr 40.00
3) 50 - 6 Kg/cm2 (Class3) Mtr 65.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
4) 63 - 6 Kg/cm2 (Class3) Mtr 65.00
5) 75 - 6 Kg/cm2 (Class3) Mtr 80.00
6) 90 - 6 Kg/cm2 (Class3) Mtr 118.00
7) 110 - 6 Kg/cm2 (Class3) Mtr 170.00
8) 140 - 6 Kg/cm2 (Class3) Mtr 263.00
9) 160 - 6 Kg/cm2 (Class3) Mtr 344.00
10) 200 - 6 Kg/cm2 (Class3) Mtr 549.00
11) 250 - 6 Kg/cm2 (Class3) Mtr 899.00
12) 315 - 6 Kg/cm2 (Class3) Mtr 1,844.00

8 Supplying S&S RCC spun pipes NP-3 class conforming to IS 458:1988 with latest amendments and co
worksite, rolling and lowering into trenches, laying true to line and level including loading and unload
destinations and jointing of pipes and specials (excluding cost of specials) including perfect linking of
jack to correct position including cost of jointing materials ie., rubber rings confirming to IS for S&S
with all lead & lift & as directed and giving necessary hydraulic test to the required pressure as per ISS an
commissioning (contractor will make his own arrangements for procuring water for testing)
(For UGD works the pipe shall be manufactured using Sulphate Resistant Cement (SRC) only)

Cost of Pipe
Sl. No. Particulars of Pipe Unit per Mtr.
(in Rs.)

1 2 3 4
1) 300 mm dia Mtr 1161.0
2) 350 mm dia Mtr 1579.0
3) 400 mm dia Mtr 1766.0
4) 450 mm dia Mtr 1981.0
5) 500 mm dia Mtr 2237.0
6) 600 mm dia Mtr 3078.0
7) 700 mm dia Mtr 4231.0
8) 800 mm dia Mtr 4694.0
9) 900 mm dia Mtr 5651.0
10) 1000 mm dia Mtr 6672.0
11) 1200 mm dia Mtr 8453.0
9 Labour charges for making flanged joints including cost of jointing materials comprising of rubber inse
and nuts and white lead including giving hydraulic test to the required pressure as per ISS with all
(contractor will make his own arrangement for procuring water for testing).

1) 50 mm dia
2) 80 mm dia
3) 100 mm dia
4) 150 mm dia
5) 200 mm dia
6) 250 mm dia

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
7) 300 mm dia
8) 350 mm dia
9) 400 mm dia
10) 450 mm dia
11) 500 mm dia
12) 600 mm dia
13) 700 mm dia
14) 750 mm dia
15) 900 mm dia
10 Supply and fixing of Cast Steel Double flanged Dual plate check valve Class 150 Conforming to API 594
amendments as detailed below of following diameters and types and conveying to work site, loading,
stacking etc., complete with all lead and lift. The rates are inclusive of cost of Bolts and Nuts

Rate inclusive of cost of


valve, Bolts and Nuts
Sl. No. Particulars of valve Unit for jointing & fixing per
valve
1 2 3 4
Class 150
1) 80 mm dia Each 3902.00
2) 100 mm dia Each 4520.00
3) 150 mm dia Each 7871.00
4) 200 mm dia Each 15082.00
5) 250 mm dia Each 21719.00
6) 300 mm dia Each 28642.00
7) 350 mm dia Each 38984.00
8) 400 mm dia Each 55345.00
9) 450 mm dia Each 66436.00
10) 500 mm dia Each 76711.00
11) 600 mm dia Each 86532.00
12) 700 mm dia Each 122862.00
13) 750 mm dia Each 136004.00
14) 800 mm dia Each 150998.00
15) 900 mm dia Each 209827.00
16) 1000 mm dia Each 269561.00
17) 1100 mm dia Each 807320.00
18) 1200 mm dia Each 1042835.00
Class 300
1) 80 mm dia Each 4293.00
2) 100 mm dia Each 4972.00
3) 150 mm dia Each 8659.00
4) 200 mm dia Each 16590.00
5) 250 mm dia Each 23891.00
6) 300 mm dia Each 31507.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
7) 350 mm dia Each 42882.00
8) 400 mm dia Each 60880.00
9) 450 mm dia Each 73080.00
10) 500 mm dia Each 84383.00
11) 600 mm dia Each 96340.00
12) 700 mm dia Each 135148.00
13) 750 mm dia Each 149604.00
14) 800 mm dia Each 166098.00
15) 900 mm dia Each 230810.00
16) 1000 mm dia Each 296517.00

11 Supply and delivery of Resilient seated soft sealing Sluice Valves with body, bonnet of Ductile Iro
GGG50, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tigh
leak proof with face dimensions as per BS 5163-89/ IS 14846-2000 / DIN 3202 F4/F5. The stem sealing
with Toroidal sealing rings (minimum 2 'O' rings). All the valves should be with electrostatic powder c
inside and outside with pocket less body passage. The valves shall be supplied with suitable size galva
and nuts of required numbers as per relevant IS.

PN 10
1) 50 mm dia Each 5583.00
2) 80 mm dia Each 8301.00
3) 100 mm dia Each 10571.00
4) 150 mm dia Each 18612.00
5) 200 mm dia Each 29616.00
6) 250 mm dia Each 44558.00
7) 300 mm dia Each 63051.00
8) 350 mm dia Each 110012.00
9) 400 mm dia Each 132750.00
10) 450 mm dia Each 181390.00
11) 500 mm dia Each 229073.00
12) 600 mm dia Each 331419.00

PN 16
1) 50 mm dia Each 5583.00
2) 80 mm dia Each 8301.00
3) 100 mm dia Each 10571.00
4) 150 mm dia Each 18612.00
5) 200 mm dia Each 29616.00
6) 250 mm dia Each 44558.00
7) 300 mm dia Each 63051.00
8) 350 mm dia Each 110012.00
9) 400 mm dia Each 132750.00
10) 450 mm dia Each 181390.00
11) 500 mm dia Each 229073.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4

PN 25
1) 50 mm dia Each 5642.00
2) 80 mm dia Each 8688.00
3) 100 mm dia Each 11355.00
4) 150 mm dia Each 19497.00
5) 200 mm dia Each 29994.00
6) 250 mm dia Each 53228.00
7) 300 mm dia Each 67488.00
8) 400 mm dia Each 149213.00
9) 500 mm dia Each 249957.00

12 Supply and fixing of single chamber triple function tamper proof (Both the orifces to be housed in
chamber) Air valves with Body and cover in Ductile cast iron of grade GGG 50. All internal parts such as
etc., all cover bolts of austenitic alloy / SS 304 steel, DN 50 float of HOSTAFLON / SS 304 and gaskers a
EPDM. Epoxy powder coating (EP-P) inside and outside colour blue RAL5005. The valves should be d
all the three functions i.e.,
1. Large orifice for venting of large air volumes on start up.
2. Large orifice for intake of large air volumes.
3. Small orifice for discharge of pressurized air during operation.

PN 10
1) 50 mm dia Each 16137.00
2) 80 mm dia Each 22745.00
3) 100 mm dia Each 30405.00
4) 150 mm dia Each 35934.00
5) 200 mm dia Each 46068.00

PN 16
1) 50 mm dia Each 17762.00
2) 80 mm dia Each 24911.00
3) 100 mm dia Each 37727.00
4) 150 mm dia Each 45502.00
5) 200 mm dia Each 53089.00

PN 25
1) 50 mm dia Each 21227.00
2) 80 mm dia Each 29892.00
3) 100 mm dia Each 37727.00
4) 150 mm dia Each 45502.00
5) 200 mm dia Each 53089.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
13 Supply and fixing of DI double flanged wafer type (Concentric) / double eccentrically disc, butte
conforming to DIN 335 / IS 13095 with renewable soft seal on the disc and body seat face of nickel w
micro finished / Integral Seat with power or liquid epoxy coating with minimum thickness of 250 microns
both body and disc inside and outside. Face to face dimensions as per EN 558-1 basic series 14 (DIN 3
AWWA C 504: 80 or BS 5155 or IS 13095. The valves shall be supplied along with the required number
make galvanized Bolts and nuts. The flange drilling standard is IS 1538. Hence, drilling of hole in the v
match with the pipe flange drilling standard. The valves are to be suitable for buried oepration wiht th
sealed and lubricated for life time operation.

DI double flanged wafer type butterfly valves

PN 10
1) 50 mm dia Each 8427.00
2) 80 mm dia Each 9318.00
3) 100 mm dia Each 11746.00
4) 150 mm dia Each 14102.00

PN 16
1) 50 mm dia Each 8427.00
2) 80 mm dia Each 9318.00
3) 100 mm dia Each 11746.00
4) 150 mm dia Each 14102.00

DI Double Flanged Eccentric Butterfly


Valve
PN 10
1) 200 mm dia Each 17033.00
2) 250 mm dia Each 31360.00
3) 300 mm dia Each 43085.00
4) 350 mm dia Each 87862.00
5) 400 mm dia Each 114203.00
6) 450 mm dia Each 122951.00
7) 500 mm dia Each 157669.00
8) 600 mm dia Each 241953.00
9) 700 mm dia Each 376876.00
10) 800 mm dia Each 444970.00
11) 900 mm dia Each 577302.00
12) 1000 mm dia Each 733668.00
13) 1200 mm dia Each 861362.00

PN 16

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
1) 200 mm dia Each 17033.00
2) 250 mm dia Each 31360.00
3) 300 mm dia Each 43085.00
4) 350 mm dia Each 87862.00
5) 400 mm dia Each 75477.00
6) 450 mm dia Each 122951.00
7) 500 mm dia Each 156067.00
8) 600 mm dia Each 241953.00
9) 700 mm dia Each 376876.00
10) 800 mm dia Each 444970.00
11) 900 mm dia Each 577302.00
12) 1000 mm dia Each 733668.00
13) 1200 mm dia Each 861362.00

PN 25
1) 400 mm dia Each 239792.00
3) 500 mm dia Each 373305.00
4) 600 mm dia Each 433542.00
5) 700 mm dia Each 824881.00
6) 800 mm dia Each 819144.00
7) 900 mm dia Each 1493740.00
8) 1000 mm dia Each 1745681.00
9) 1200 mm dia Each 2199541.00

14 Supply and fixing of ductile iron double flanged swing check vavles with slanted seat or with lever w
straight disc, with metallic corrosion proof and wear resistant seat faces with nickel overlay micro - finish
seat with body and disc in Ductile Iron in GGG 50 shaft of stainless steel and bearings of zinc free
surface protection with epoxy liquid of GSK quality.

PN 10
1) 50 mm dia Each 6672.00
2) 80 mm dia Each 9484.00
3) 100 mm dia Each 13077.00
4) 150 mm dia Each 22513.00
5) 200 mm dia Each 45760.00
6) 250 mm dia Each 83343.00
7) 300 mm dia Each 124373.00
4) 350 mm dia Each 222884.00
5) 400 mm dia Each 261140.00
6) 450 mm dia Each 397760.00
7) 500 mm dia Each 400065.00
8) 600 mm dia Each 544638.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
9) 700 mm dia Each 922871.00
10) 800 mm dia Each 1495365.00
11) 900 mm dia Each 1702803.00
12) 1000 mm dia Each 2083389.00

PN 16
1) 50 mm dia Each 6672.00
2) 80 mm dia Each 9484.00
3) 100 mm dia Each 13077.00
4) 150 mm dia Each 22513.00
5) 200 mm dia Each 45760.00
6) 250 mm dia Each 83343.00
7) 300 mm dia Each 124373.00
4) 350 mm dia Each 222884.00
5) 400 mm dia Each 261140.00
6) 450 mm dia Each 425872.00
7) 500 mm dia Each 441743.00
8) 600 mm dia Each 553719.00
9) 700 mm dia Each 922871.00
10) 800 mm dia Each 1552394.00
11) 900 mm dia Each 1787947.00
12) 1000 mm dia Each 2109840.00

15 Removing the C.I. / D.I. valves and tail pieces from the pipe line, cleaning,washing and returning the s
stores with all lead & lift
1) 80 mm dia
2) 100 mm dia
3) 150 mm dia
4) 200 mm dia
5) 250 mm dia
6) 300 mm dia
7) 400 mm dia
8) 450 mm dia
9) 600 mm dia
10) 700 mm dia
11) 750 mm dia
12) 900 mm dia
16 Making bores in D.I pipes.
1) 15 mm dia
2) 20 mm dia
3) 25 mm dia
4) 40 mm dia

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
5) 50 mm dia
6) 65 mm dia
17 Removing and cleaning the D.I. pipes including jointing materials and washing (this includes the rem
special except valves and tail pieces)
1) 80 mm dia
2) 100 mm dia
3) 150 mm dia
4) 200 mm dia
5) 250 mm dia
6) 300 mm dia
7) 350 mm dia
8) 400 mm dia
9) 450 mm dia
10) 600 mm dia
11) 700 mm dia
12) 750 mm dia
13) 900 mm dia
18 Painting the M.S/D.I pipes & specials on outside with Anti-corrosive paint including cost of paint etc.
1) 80 mm dia
2) 100 mm dia
3) 150 mm dia
4) 175 mm dia
5) 200 mm dia
6) 225 mm dia
7) 250 mm dia
8) 300 mm dia
9) 400 mm dia
10) 450 mm dia
11) 600 mm dia
12) 750 mm dia
13) 900 mm dia
19 Construction of Gland Cock Cistern in burnt brick in CM 1:6 on a bed of
8 cms thick C.C. 1:4:8, 25 mm size granite jelly and plastering with
C.M. 1:3 inside and outside 20 mm thick including supplying and fixing
15 cms size Road Box in C.C. 1:3:6 proportion with 20 mm size granite
jelly 5 cms thick with all lead, lift and finishing,curing for 10 days etc,
complete. Size of the cistern to be 15 cms internal.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
20 1)Supplying the Road Box of 15 cms size, installing and fixing in C.C.
1:3:6 including plastering with C.M. 1:3, 20 mm thick with all lead and
lift, curing for 10 days etc., complete as per specification

2)- do - 30 cms size


3)- do - 45 cms size
21 Supplying and fixing C.I. valve box confirming to relevant ISS
(Minimum weight 40kgs) and 15 cms, size Road box including C.I.
barrel pipe and fixing with earth work in all soils etc, complete, road box
to be fixed in C.C. 1:3:6 and plastered all over with CM 1:3, 20 mm
thick with all lead, curing for 10 days

22 Supply and fixing of fixed height surface box H-4057 MD-KU with PP
40% GF Lid, Housing of PA+, Locking clip of PP with Notched bolt
M12x130 hexagon head A2-70 for service connection valves, design
derived from DIN 4057, should be supplied with Support tile I (FSL,
FSS, SI). Should be able to receive class AA traffic loads. These boxes
will be fixed in the RCC bed provided over the valve. The cover must be
articulated with the body. The surface box shall be coated with bitumen
painting.

23 Supply & fixing RCC Pre-cast Cover Slab (M25-Design mix)

24 Supply of Extensional spindle suitable for Gate valve for open and
closing application, Extension Spindle lengths shall be available on
required sizes as per site conditions, spindle shall be of fixed type, MOC
of Square bar is MS, Bottom adaptor/Spindle cap ductile iron grade of
EN1563 EN-EJS-400-15 / IS1865 Spheroidal Graphite Iron Gr40.
Protection tube of PVC, Top and Bottom cover / Bottom Connector shall
be made by PVC, Bolt shall be made by Zinc coated steel 8.8 Split pin
shall be made by Electro galvanized, this set up should help have a
buried application of Gate Valves.

50 - 150 mm dia
200 - 400 m dia

25 Supplying and fixing Medium duty SFRC frame and cover confirming
to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest
amendment, including cutting slabs to the required size for the opening
and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick
to all exposed faces, curing for 10 days with all lead and lift etc.
complete.

- do - Heavy duty

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
NOTE: “If only Covers are used, then 50% of the rate shall be considered”.

26 Supplying and fixing R.C.C. demarcation stones of 30 cms x 15 cms,


and 90 cms. deep using 1:2:4 C.C. and 6 mm dia rods for verticals and
stirrups and rendered smooth, including engraving letters "KWB and
Arrow" 6 mm deep on the top including fixing demarcation stones 45
cms below ground level and in C.C. 1:3:6, 15 cms. height, with 8 cms.
offset around the stone and curing for 10 days including earthwork
excavation in all types of soils with all lead and lift.

27 Supplying and fixing C.I. Oval box for meters including fixing in C.C.
1:3:6, 20 cms. thick with necessary bolts and nuts etc. complete with all
lead and lift

28 Supplying and fixing meters of following size to service connections


including conveying and fixing of necessary G.I. specials etc. complete,
with all lead and lift

1) 15mm dia
2) 20 mm dia
3) 25 mm dia
29 Removing RCC valve box and 15 cms. size road box and conveying to
stores with all lead & lift.
30 Supplying 80 mm dia 1.5 Mtr. Long C.I. "LA" Class pipes and fixing in
C.C. 1:3:6 and making two bores to take in fountain pipe, fitting the C.I.
pipe with C.C. 1:3:6 including curing for 10 days and painting outside
two coats of approved paint and with all lea and lift etc., complete.

31 Dismantling C.I. fountains, fittings and refixing after cleaning the pipe
fitting etc, in C.C. 1:3:6 as per specification with all lead and lift.

32 Dismantling C.I. fountains and returning the materials to the stores with
all lead & lift.

33 Fitting C.I. fountains stand and painting with two coats of approved
paint.
34 Conveying with all lead & lift and fixing C.I specials, bends, branches,
tees,etc, all sizes and aligning.
1) 50 mm dia to 100 mm dia
2) 125 mm dia to 225 mm dia
3) 250 mm dia to 600 mm dia
4) above 600 mm dia to 900mm dia

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
35 Removing the gland cock with fitting, repairing and refixing (15 mm to
65 mm)

36 Fixing gland cock sizes (15 mm to 65 mm)

37 Removing C.I. Road Box and refixing as per Specification

38 Removing RCC Valve box and refixing as per specification.

39 Labour charges for conveying and fixing standard size fire hydrants as
per specifications, including fixing duck foot bend and hydrant post with
all lead & lift.

40 Removing and refixing fire hydrants after cleaning and repainting


41 Supply and fixing pot rest slab of size 0.45 x 0.30 x 0.20 meters with
central dip for resting the pot including two line dressing and edges
rounded and with all lead.

42 Making construction joints with G.I. sheet for R.C.C. service reservoirs
and water retaining structures.
43 Providing and fixing PVC water stopper of suitable type of 230 mm
width and 5 mm thickness for construction joints as per detailed
technical specifications and as directed by Engineer-in-charge.

44 Providing, fixing, applying of contraction joint with suitable type PVC


water stopper of 230 mm width and 5 mm thick sealed with 12 mm x 25
mm gun grade polysulphide elastomeric joint sealant of FOSROC make
(NITO seal MS 600) over a backer rod and high performance laminated
closed cell polyethylene foam joint filler of suitable make (CAPCELL-
HD-100) in sheet foam having a density of 100 Kg / Cum, non staining
with less than 1% water absorption, having 97% recovery at
compression and as directed by Engineer-in-charge.

45 Providing and laying cement concrete 1:11/2:3 proportion (excluding


cost of reinforcement) with 20 mm and down size metal of approved
gradation hard broken granite, trap, basalt or with any other approved
hard aggreggate including cost and conveyance of all materials with all
lead and lift and placing the same above or below ground level including
plywood / steel form work, machine mixing, laying, tamping, curing,
etc., complete including smooth finishing the exposed faces with CM
1:4 proportion 12 mm thick wherever necessary, etc., complete for
Anchor Blocks/Thrust Blocks.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
PRECAST PUBLIC FOUNTAIN
46 1) Supplying at site RCC verticle fountain slab with CC 1:1½ :3 with 20
mm and down size granite jelly with nominal reinforcements as per
design plastered with C.M. 1:4, 20 mm thick, with all lead and lift
including plank centering, form work, machine mixing, tamping, curing
etc, Complete as per specifications including cost of steel.

2) Supply at site RCC curb slab with granite metal 20mm and down size
with C.C. 1:1½:3 proportion including wooden planks form work,
centering, curing, machine mixing, tamping and plastering with CM 1:4
proportion 20mm thick with all lead & lift as per specification including
cost of reinforcement, size 1.22 m x 0.30 m x 0.05 m for square public
fountains (One set of 4 Nos).

3)-do- RCC curb slab of size each 1.22 m Dia and 0.30 x 0.05 m for
circular public fountains.
4) Supplying at site pot rest slab of 0.45mx0.30mx0.20m in CC. 1:2:4
proportion with granite metal 20 mm and down size including plank
centering and form work, machine mixing, tamping including plastering
20 mm thick in C.M. 1:4 proportion with all lead as per specification
etc., complete

47 Labour charges for fixing a set of precast RCC Public fountain slab viz,
(1) Vertical slab, (2) Pot rest slab, (3) Curb slab or Curbing including
necessary earthwork and fixing them in proper position with necessary
cement mortar curing for 10 days wherever required

48 Supplying Cast Iron conical valve cistern (minimum weight of 30 Kgs.)


and fixing in C.C. 1:3:6 proportion 23 cms, thick curing for 10 days with
necessary bolts and nuts etc., complete with all lead and lift.

49 Providing and constructing stand post 1.22m x 1.22m size for public
fountain with R.C.C. post of size 1.22m x 0.38m x 0.10m with top
rounded and R.C.C. curb slab of size 1.22m x 0.30m x 0.05m in CC
1:2:4 proportion with 20 mm and down size granite jelly with nominal
reinforcement as per design, plastered with CM. 1:4, 20 mm thick to the
exposed faces with pot rest slab of size 0.45m x 0.30m x 0.20m in CC
1:2:4 proportion 10 cms thick and smooth finishing with CM 1:4 to the
exposed faces with necessary form work centering, machine mixing,
tamping, curing as per specifications including cost of steel and
necessary earth work excavation and disposing off the excavated earth as
directed with all lead and lift etc., complete.

BARBED WIRE FENCING

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
50 1) Providing to worksite and fixing R.C.C. pole of 2.40 m height with
0.15m square at bottom and 0.12 m square at top in C.C. 1:2:4 using 20
mm and down size granite or basalt metal with 4 Nos. of 10 mm dia
M.S. reinforcement and 17 Nos. of 6 mm dia stirrups. The pole will be
embeded in C.C. 1:3:6 using 20 mm and down size granite or basalt or
trap metal for foundation of size 0.50x0.50x0.50m with necessary earth
work for barbed wire fencing including curing and including cost of
steel etc., complete with all lead and lift for all material.

2) Providing barbed G.I. wire fencing of 12 x 12 gauge to worksite and


drawn into stone pillars or iron pillars or RCC pillars or Poles including
drawing in holes wherever necessary excluding the cost of pillars/poles
but including the cost of barbed wire and binding wire and labour
charges for fixing barbed wire either vertically or horizontally, tieing
etc., complete with all lead & lift.

M.S Pipes & Specials


51 Manufacturing, providing, transporting, rolling, lowering, laying & Jointing, testing, commissionin
(Electric Resistance Welded) / SAW (Submerged Arc Welded) MS pipes (Fe-410 grade) conforming t
2001with latest amendments including perfect linking and welding of joints to correct position includin
conveyance of pipes and materials with all lead and lift, cost of all labour and giving satisfactory hydra
per IS 3589-2001 with latest amendments for test pressure and working pressure both at factory a
complete as per detailed specifications with inside CM 1:1.5 lining of minimum 10 mm thick upto 610
minimum 12mm thick beyond 610 mm OD and out side minimum 25 mm thick coating in CM 1:3 over 5
weld mesh of 13 gauge, including loading and unloading of pipes for the following diameters and specifie
of plate as noted below, including bailing out of water wherever necessary. (Contractor will mak
arrangement for procuring water for testing).
Note:
a) No Negative tolerance in respect of thickness is permissible.
b) Basic Cost of MS Pipes is considered as Rs.47,000.00 per MT
d) The pipe costs are FOR destination anywhere in Karnataka.

Minimum
thickness Cost of Pipe per Mtr in
Sl. No. Outer dia of the pipe Unit
of pipe Rs.
( in mm )
1 2 3 4 5
1 219 mm dia 4.80 Mtr 1,370.00
5.40 Mtr 1,537.00
5.60 Mtr 1,593.00
6.00 Mtr 1,703.00
6.40 Mtr 1,814.00
7.00 Mtr 1,978.00
7.90 Mtr 2,223.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
8.20 Mtr 2,304.00
8.70 Mtr 2,439.00
9.50 Mtr 2,653.00

2 273.1 mm dia 4.80 Mtr 1,717.00


5.60 Mtr 1,997.00
6.00 Mtr 2,136.00
6.40 Mtr 2,275.00
7.20 Mtr 2,552.00
7.80 Mtr 2,759.00
8.70 Mtr 3,066.00
9.30 Mtr 3,270.00

3 323.9 mm dia 5.60 Mtr 2,376.00


6.00 Mtr 2,543.00
6.40 Mtr 2,709.00
7.10 Mtr 2,998.00
7.90 Mtr 3,328.00
8.40 Mtr 3,533.00
8.70 Mtr 3,656.00
9.50 Mtr 3,982.00

4 355.60 mm dia 5.60 Mtr 2,613.00


6.00 Mtr 2,796.00
6.40 Mtr 2,979.00
7.10 Mtr 3,299.00
7.90 Mtr 3,662.00
8.70 Mtr 4,023.00
9.50 Mtr 4,383.00

5 406 mm dia 5.60 Mtr 2,989.00


6.00 Mtr 3,199.00
6.40 Mtr 3,409.00
7.10 Mtr 3,776.00
7.90 Mtr 4,193.00
8.70 Mtr 4,608.00
9.50 Mtr 5,022.00
10.00 Mtr 5,279.00

6 457 mm dia 5.60 Mtr 3,370.00


6.40 Mtr 3,844.00
7.10 Mtr 4,258.00
7.90 Mtr 4,730.00
8.70 Mtr 5,200.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
9.50 Mtr 5,668.00
10.00 Mtr 5,959.00

7 508 mm dia 5.60 Mtr 3,751.00


6.40 Mtr 4,280.00
7.10 Mtr 4,741.00
7.90 Mtr 5,267.00
8.70 Mtr 5,791.00
9.50 Mtr 6,314.00
10.00 Mtr 6,639.00

8 559 mm dia 5.60 Mtr 4,131.00


6.40 Mtr 4,715.00
7.10 Mtr 5,224.00
7.90 Mtr 5,804.00
8.70 Mtr 6,383.00
9.50 Mtr 6,960.00
10.00 Mtr 7,319.00

9 610 mm dia 5.60 Mtr 4,512.00


6.40 Mtr 5,150.00
7.10 Mtr 5,707.00
7.90 Mtr 6,341.00
8.70 Mtr 6,974.00
9.50 Mtr 7,606.00
10.00 Mtr 7,999.00
12.00 Mtr 9,567.00

10 660 mm dia 6.40 Mtr 5,577.00


7.10 Mtr 6,180.00
7.90 Mtr 6,868.00
8.70 Mtr 7,554.00
9.50 Mtr 8,239.00
10.00 Mtr 8,666.00

11 711 mm dia 6.40 Mtr 6,012.00


7.10 Mtr 6,663.00
7.90 Mtr 7,405.00
8.70 Mtr 8,146.00
9.50 Mtr 8,885.00
10.00 Mtr 9,346.00
12.00 Mtr 11,183.00

12 762 mm dia 7.10 Mtr 7,146.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
7.90 Mtr 7,942.00
8.70 Mtr 8,737.00
9.50 Mtr 9,531.00
10.00 Mtr 10,026.00

13 813 mm dia 7.10 Mtr 7,628.00


7.90 Mtr 8,480.00
8.70 Mtr 9,329.00
9.50 Mtr 10,177.00
10.00 Mtr 10,706.00
12.00 Mtr 12,815.00

14 864 mm dia 7.90 Mtr 9,017.00


8.70 Mtr 9,921.00
9.50 Mtr 10,823.00
10.00 Mtr 11,386.00

15 914 mm dia 7.90 Mtr 9,543.00


8.70 Mtr 10,501.00
9.50 Mtr 11,456.00
10.00 Mtr 12,052.00

16 965 mm dia 8.70 Mtr 11,092.00


9.50 Mtr 12,102.00
10.00 Mtr 12,732.00

17 1016 mm dia 8.70 Mtr 11,684.00


9.50 Mtr 12,748.00
10.00 Mtr 13,412.00
12.00 Mtr 16,063.00

18 1067 mm dia 8.70 Mtr 12,275.00


9.50 Mtr 13,394.00
10.00 Mtr 14,092.00

19 1118 mm dia 8.70 Mtr 12,867.00


9.50 Mtr 14,040.00
10.00 Mtr 14,772.00

20 1168 mm dia 9.50 Mtr 14,673.00


10.00 Mtr 15,439.00

21 1219 mm dia 10.00 Mtr 16,119.00


12.50 20,099.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4

22 1422 mm dia 12.50 23,481.00


14.20 26,642.00

23 1626 mm dia 14.20 30,503.00


16.00 34,331.00

24 1829 mm dia 14.20 34,344.00


16.00 38,660.00
17.50 42,249.00

26 2032 mm dia 42,988.00


46,984.00
53,629.00

27 2235 mm dia 16.00 51,718.00


17.50 59,040.00
20.00 65,470.00

28 2540 mm dia 20.00 67,170.00


22.20 74,493.00
25.00 83,796.00

52 Manufacturing, providing, transporting, rolling, lowering, laying and jointing, testing and commission
specials of minimum 8 mm thick conforming to IS 7322:1985 with latest amendments, perfect linking a
of joints to correct position including cost and conveyance of materials with all lead and lifts, cost of all
giving satisfactory hydraulic test as per IS 3589:2001 with latest amendments for test pressure and worki
both at factory and site etc., complete as per detailed specifications with inside lining two coats of food g
painting of approved make with each coat of 250 micron, thick (after dry) over one coat of food grade ep
of approved make with minimum of 50 micron thick (after dry) and outside 25mm thick coating in
providing 50x50mm weld mesh including loading and unloading of pipes for the following category to
MS/ CI/ AC/ DI/ PVC pipes. The weight of the MS shell only be considered before lining and coating for
the rate.The thickness of plate will be specified by the engineer. (contractor will make his own arrang
procuring water for testing).

1. For Bends, Tail pieces , Reducers, Test gaps,Tees:


1) upto & inclusive of 500 mm dia of pipe
2) above 500 mm dia of pipe
Note: 1) For small works where the C.M. lining is not practicable for inside surface of the pipe, food gr
painting of two coat over one coat of epoxy primer may be proposed and got approved.
2) The above rates are applicable only for pipe works.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
52 Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work sit
loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointi
and specials by electrofusion welding, including encasing the pipe around to a depth not less than 15cm
gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant I
lead and lift including testing and commissioning. The rate is exclusive of required specials and f
complete (Contractor will make his own arrangement for procuring water for testing)

Outer dia of pipe Class of Cost of Pipe per Mtr in


Sl. No. Unit
(in mm) Pipe Rs.

(1) HDPE Grade - PE80 conforming to IS 4984 - 1995


1 1) 63 mm dia PN 6.0 Mtr 87.00
2) 75 mm dia PN 6.0 Mtr 124.00
3) 90 mm dia PN 6.0 Mtr 176.00
4) 110 mm dia PN 6.0 Mtr 264.00
5) 125 mm dia PN 6.0 Mtr 339.00
6) 140 mm dia PN 6.0 Mtr 424.00
7) 160 mm dia PN 6.0 Mtr 553.00
8) 180 mm dia PN 6.0 Mtr 697.00
9) 200 mm dia PN 6.0 Mtr 863.00
10) 225 mm dia PN 6.0 Mtr 1088.00
11) 250 mm dia PN 6.0 Mtr 1343.00
12) 280 mm dia PN 6.0 Mtr 1679.00
13) 315 mm dia PN 6.0 Mtr 2125.00
14) 355 mm dia PN 6.0 Mtr 2693.00
15) 400 mm dia PN 6.0 Mtr 3500.00
16) 450 mm dia PN 6.0 Mtr 4420.00
17) 500 mm dia PN 6.0 Mtr 5605.00
18) 560 mm dia PN 6.0 Mtr 6993.00
19) 630 mm dia PN 6.0 Mtr 8979.00
20) 710 mm dia PN 6.0 Mtr 15730.00

2 1) 63 mm dia PN 8.0 Mtr 107.00


2) 75 mm dia PN 8.0 Mtr 154.00
3) 90 mm dia PN 8.0 Mtr 216.00
4) 110 mm dia PN 8.0 Mtr 328.00
5) 125 mm dia PN 8.0 Mtr 419.00
6) 140 mm dia PN 8.0 Mtr 532.00
7) 160 mm dia PN 8.0 Mtr 687.00
8) 180 mm dia PN 8.0 Mtr 860.00
9) 200 mm dia PN 8.0 Mtr 1068.00
10) 225 mm dia PN 8.0 Mtr 1353.00
11) 250 mm dia PN 8.0 Mtr 1668.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
12) 280 mm dia PN 8.0 Mtr 2139.00
13) 315 mm dia PN 8.0 Mtr 2704.00
14) 355 mm dia PN 8.0 Mtr 3368.00
15) 400 mm dia PN 8.0 Mtr 4334.00
16) 450 mm dia PN 8.0 Mtr 5472.00
17) 500 mm dia PN 8.0 Mtr 6739.00
18) 560 mm dia PN 8.0 Mtr 8413.00
19) 630 mm dia PN 8.0 Mtr 10783.00
20) 710 mm dia PN 8.0 Mtr 19401.00

3 1) 63 mm dia PN 10.0 Mtr 131.00


2) 75 mm dia PN 10.0 Mtr 186.00
3) 90 mm dia PN 10.0 Mtr 266.00
4) 110 mm dia PN 10.0 Mtr 396.00
5) 125 mm dia PN 10.0 Mtr 507.00
6) 140 mm dia PN 10.0 Mtr 641.00
7) 160 mm dia PN 10.0 Mtr 830.00
8) 180 mm dia PN 10.0 Mtr 1048.00
9) 200 mm dia PN 10.0 Mtr 1296.00
10) 225 mm dia PN 10.0 Mtr 1646.00
11) 250 mm dia PN 10.0 Mtr 2027.00
12) 280 mm dia PN 10.0 Mtr 2586.00
13) 315 mm dia PN 10.0 Mtr 3267.00
14) 355 mm dia PN 10.0 Mtr 4089.00
15) 400 mm dia PN 10.0 Mtr 5258.00
16) 450 mm dia PN 10.0 Mtr 6629.00
17) 500 mm dia PN 10.0 Mtr 8164.00
18) 560 mm dia PN 10.0 Mtr 10208.00
19) 630 mm dia PN 10.0 Mtr 13072.00

4 1) 63 mm dia PN 12.5 Mtr 157.00


2) 75 mm dia PN 12.5 Mtr 222.00
3) 90 mm dia PN 12.5 Mtr 316.00
4) 110 mm dia PN 12.5 Mtr 475.00
5) 125 mm dia PN 12.5 Mtr 612.00
6) 140 mm dia PN 12.5 Mtr 774.00
7) 160 mm dia PN 12.5 Mtr 998.00
8) 180 mm dia PN 12.5 Mtr 1257.00
9) 200 mm dia PN 12.5 Mtr 1557.00
10) 225 mm dia PN 12.5 Mtr 1976.00
11) 250 mm dia PN 12.5 Mtr 2443.00
12) 280 mm dia PN 12.5 Mtr 3088.00
13) 315 mm dia PN 12.5 Mtr 3894.00
14) 355 mm dia PN 12.5 Mtr 4915.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
15) 400 mm dia PN 12.5 Mtr 6289.00

5 1) 63 mm dia PN 16.0 Mtr 184.00


2) 75 mm dia PN 16.0 Mtr 261.00
3) 90 mm dia PN 16.0 Mtr 374.00
4) 110 mm dia PN 16.0 Mtr 565.00
5) 125 mm dia PN 16.0 Mtr 723.00
6) 140 mm dia PN 16.0 Mtr 914.00
7) 160 mm dia PN 16.0 Mtr 1181.00
8) 180 mm dia PN 16.0 Mtr 1490.00
9) 200 mm dia PN 16.0 Mtr 1850.00
10) 225 mm dia PN 16.0 Mtr 2337.00
11) 250 mm dia PN 16.0 Mtr 2890.00
12) 280 mm dia PN 16.0 Mtr 3671.00
13) 315 mm dia PN 16.0 Mtr 4629.00
14) 355 mm dia PN 16.0 Mtr 5835.00
15) 400 mm dia PN 16.0 Mtr 7454.00
(2) HDPE Grade - PE- 100 Rates conforming to IS 4984: 1995

Outer dia of pipe Class of Cost of Pipe per Mtr in


Sl. No. Unit
(in mm) Pipe Rs.

1 1) 63 mm dia PN 6.0 Mtr 75.00


2) 75 mm dia PN 6.0 Mtr 107.00
3) 90 mm dia PN 6.0 Mtr 155.00
4) 110 mm dia PN 6.0 Mtr 221.00
5) 125 mm dia PN 6.0 Mtr 291.00
6) 140 mm dia PN 6.0 Mtr 357.00
7) 160 mm dia PN 6.0 Mtr 462.00
8) 180 mm dia PN 6.0 Mtr 588.00
9) 200 mm dia PN 6.0 Mtr 728.00
10) 225 mm dia PN 6.0 Mtr 925.00
11) 250 mm dia PN 6.0 Mtr 1180.00
12) 280 mm dia PN 6.0 Mtr 1476.00
13) 315 mm dia PN 6.0 Mtr 1816.00
14) 355 mm dia PN 6.0 Mtr 2351.00
15) 400 mm dia PN 6.0 Mtr 3026.00
16) 450 mm dia PN 6.0 Mtr 3792.00
17) 500 mm dia PN 6.0 Mtr 4672.00
18) 560 mm dia PN 6.0 Mtr 5999.00
19) 630 mm dia PN 6.0 Mtr 7623.00
20) 710 mm dia PN 6.0 Mtr 13449.00

2 1) 63 mm dia PN 8.0 Mtr 93.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
2) 75 mm dia PN 8.0 Mtr 132.00
3) 90 mm dia PN 8.0 Mtr 194.00
4) 110 mm dia PN 8.0 Mtr 280.00
5) 125 mm dia PN 8.0 Mtr 366.00
6) 140 mm dia PN 8.0 Mtr 450.00
7) 160 mm dia PN 8.0 Mtr 583.00
8) 180 mm dia PN 8.0 Mtr 741.00
9) 200 mm dia PN 8.0 Mtr 917.00
10) 225 mm dia PN 8.0 Mtr 1162.00
11) 250 mm dia PN 8.0 Mtr 1475.00
12) 280 mm dia PN 8.0 Mtr 1846.00
13) 315 mm dia PN 8.0 Mtr 2282.00
14) 355 mm dia PN 8.0 Mtr 2937.00
15) 400 mm dia PN 8.0 Mtr 3792.00
16) 450 mm dia PN 8.0 Mtr 4766.00
17) 500 mm dia PN 8.0 Mtr 5864.00
18) 560 mm dia PN 8.0 Mtr 7510.00
19) 630 mm dia PN 8.0 Mtr 9530.00
20) 710 mm dia PN 8.0 Mtr 16425.00

3 1) 63 mm dia PN 10.0 Mtr 112.00


2) 75 mm dia PN 10.0 Mtr 158.00
3) 90 mm dia PN 10.0 Mtr 230.00
4) 110 mm dia PN 10.0 Mtr 333.00
5) 125 mm dia PN 10.0 Mtr 434.00
6) 140 mm dia PN 10.0 Mtr 535.00
7) 160 mm dia PN 10.0 Mtr 694.00
8) 180 mm dia PN 10.0 Mtr 886.00
9) 200 mm dia PN 10.0 Mtr 1096.00
10) 225 mm dia PN 10.0 Mtr 1384.00
11) 250 mm dia PN 10.0 Mtr 1749.00
12) 280 mm dia PN 10.0 Mtr 2187.00
13) 315 mm dia PN 10.0 Mtr 2718.00
14) 355 mm dia PN 10.0 Mtr 3504.00
15) 400 mm dia PN 10.0 Mtr 4525.00
16) 450 mm dia PN 10.0 Mtr 5673.00
17) 500 mm dia PN 10.0 Mtr 6993.00
18) 560 mm dia PN 10.0 Mtr 8910.00
19) 630 mm dia PN 10.0 Mtr 11315.00
20) 710 mm dia PN 10.0 Mtr 20213.00

4 1) 63 mm dia PN 12.5 Mtr 131.00


2) 75 mm dia PN 12.5 Mtr 185.00
3) 90 mm dia PN 12.5 Mtr 272.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
4) 110 mm dia PN 12.5 Mtr 396.00
5) 125 mm dia PN 12.5 Mtr 515.00
6) 140 mm dia PN 12.5 Mtr 637.00
7) 160 mm dia PN 12.5 Mtr 828.00
8) 180 mm dia PN 12.5 Mtr 1052.00
9) 200 mm dia PN 12.5 Mtr 1301.00
10) 225 mm dia PN 12.5 Mtr 1648.00
11) 250 mm dia PN 12.5 Mtr 2071.00
12) 280 mm dia PN 12.5 Mtr 2593.00
13) 315 mm dia PN 12.5 Mtr 3230.00
14) 355 mm dia PN 12.5 Mtr 4149.00
15) 400 mm dia PN 12.5 Mtr 5364.00

5 1) 63 mm dia PN 16.0 Mtr 157.00


2) 75 mm dia PN 16.0 Mtr 223.00
3) 90 mm dia PN 16.0 Mtr 325.00
4) 110 mm dia PN 16.0 Mtr 474.00
5) 125 mm dia PN 16.0 Mtr 617.00
6) 140 mm dia PN 16.0 Mtr 764.00
7) 160 mm dia PN 16.0 Mtr 997.00
8) 180 mm dia PN 16.0 Mtr 1262.00
9) 200 mm dia PN 16.0 Mtr 1562.00
10) 225 mm dia PN 16.0 Mtr 1976.00
11) 250 mm dia PN 16.0 Mtr 2482.00
12) 280 mm dia PN 16.0 Mtr 3107.00
13) 315 mm dia PN 16.0 Mtr 3875.00
14) 355 mm dia PN 16.0 Mtr 4965.00
15) 400 mm dia PN 16.0 Mtr 6419.00
16) 450 mm dia PN 16.0 Mtr 8097.00
17) 500 mm dia PN 16.0 Mtr 9970.00

53 Supply and laying of warning tape / Caution tape / detector tape for
HDPE pipes of 200 mm wide, 300 micron thick, blue in colour
conforming to relevant ISS with latest amendments etc., complete

54 Supply and laying of Disc type Active Electronic Marker (RFID) with
all lead and lift.

Type: Active electronic marker


Output / Operating Frequency: Output efficiency : 145.7 KHz
RFID: The marker should have unique fixed 10 digit ID in hexadecimal
mode
Construction: High impact polystyrene plastic casing sealed to IP65

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4
Size: Minimum 220mm dia x minmum 25mm thickness

Weight : >=250 gms


Power Source: Self generated. No batteries required for signal
transmission

Working : Unit should have capability to received signal and transmit


back
Depth range: 1.5 meters
Working Life : >= 40 years
55 Supply and laying of Disc type Passive Electronic Marker (RFID) with
all lead and lift.

Type: Passive electronic marker


2. Output / Operating Frequency: Output frequency: 145.7 kHz
Construction: High impact polystyrene plastic casing sealed to IP65
Size: Minimum 120mm diameter x Minimum 33mm thickness
Weight : >=116 grams
Power Source: self generated. No batteries required for signal
transmission.
Working : Unit should have capability to received signal and transmit
back
Depth range: 1.5 meters
Working Life : >= 40 years
56 Providing of water connections to individual houses upto water meter point (which shall be fixed abou
from customer boundary) and includes
(a) civil works like Earthwork excavation for the pipeline trenches for laying of MDPE/GI pipes o
diameters for the house connections in all types of soils , disintegrated rock,soft rock, hard rock, includin
any road using machine cutter, crossing drains, compound, cutting any surfaces along the pipelin
tiles/floor/concrete/ or any other surfaces using machine cutter, boring the wall surfaces comprising of BB
for conveying the pipelines to cutomer property, restoring the damaged portions inside or outside th
premises, refilling the portions of trenches that are dug open etc. complete.

(b) cost of supply and laying of MDPE pipes with specials such as EF ferrule of diameters to suit 63 mm
to 200 mm dia and tapping ferrules must have arrangement(Mechanical type clamp saddle with bypass ar
to disconnect the connection in case of authority requires etc with cost of GI pipes including all specials
tee,GI elbow,GI coupler, stopper etc to interface the MDPE pipeline.

The work involves to provide & fix brass stop cock or valve together to be interfaced to the pipeline.
15 mm dia
20 mm dia
25 mm dia

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1 2 3 4

57 Providing 50 mm Dia HDPE Sleeve pipe with allied accessories at


ferrule point of HSC to assist in regulating flow with allen key etc.,
complete.

58 Supply and fixing of HDPE water meter box to protect the water meter
of Class ‘B’ Multijet type of size 15 to 32 mm including HDPE box with
base dia 300mm x lid dia 200mm x height 250mm with openable lid and
the cover is buried below GL with lid flush with GL including earth
work excavation for 600mm x 600mm and base sand filling for 100mm
thick over which the cover is placed and enclosed by PCC 1:3:6 using
12-20mm BG jelly for an height of 150mm and refilling with excavated
earth for balance 100mm height, disposal of excess earth with all lead
and lifts etc complete as per drawing enclosed.

59 Supply and fixing of Horizontal Mechanical Woltman type hermetically sealed water meters with co
register with IP 68 protection. The meter shall be removable mechanism type manufactured as ISO 40
with MID certification. The meters shall be capable of transmitting consumption data on daily basis to ce
through GSM/GPRS. The meter interface unit shall be fitted to the meter without wire. The consumptio
be collected , stored and analysed by data logger. The data logger should provide data like flow rate,
consumption analyses, reverse flow, meter tampering, daily flow distribution, leakage detection. The
shall also send alarms on blocked meter, flow rate above limit, pressure below or above limits.

50 mm
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Rate
Unit
(in Rs.)
5 6

red pressure as per relevant ISS. Contractor will make

GI pipes conforming to IS1239:1990 with latest


nd cocks and other fittings (excluding cost of specials)
g the materials to workspot including testing for water
rangements for procuring water for testing)

Cost of Cutting,lowering,
laying, jointing & perfect
Total
linking per Mtr.
(in Rs.)
5 6

58.00 141.00
58.00 165.00
60.00 228.00
105.00 323.00
106.00 357.00
106.00 463.00
108.00 567.00
111.00 683.00
136.00 974.00

57.00 126.00
58.00 148.00
58.00 196.00
102.00 281.00
105.00 310.00
106.00 395.00
106.00 476.00
109.00 590.00
133.00 838.00

57.00 106.00
58.00 129.00
58.00 171.00
103.00 249.00
105.00 290.00
105.00 339.00
108.00 437.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
106.00 494.00
132.00 694.00
t or conveying from workspot to office/store with all
bows, tees, bends, gland cocks, cuts and threads etc.

Mtr 24.00
Mtr 32.00
Mtr 49.00
ntains etc., where the length of pipe laid is less than 6

Mtr 84.00
Mtr 168.00
Mtr 210.00
Mtr 252.00
Mtr 352.00
Mtr 500.00
s only)
Each 63.00
Each 72.00
Each 101.00
Each 203.00
Each 254.00
Each 290.00
Each 387.00
Each 407.00
Each 452.00
Each 509.00
Each 581.00
Each 626.00
Each 814.00
ges only)

Each 47.00
Each 54.00
Each 76.00
Each 152.00
Each 190.00
Each 218.00
Each 277.00
Each 305.00
Each 339.00
Each 381.00
Each 436.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each 469.00
Each 610.00
h latest amendments and conveying to worksite, rolling
perfect linking at joints, testing and commissioning,
of pipes wherever necessary including jointing of DI
gaskets including cleaning the socket and spigot ends
ocket ends before insertion of rubber gaskets, jacking
n, soft soap, waste etc. and giving necessary hydraulic
including cost of jointing materials. (contractor will

permitted for internal cement mortor lining (CML) of


S 8329:2000 in place of Slag or Sulphate Resistance

Cost of Cutting,
lowering, laying,
tyton jointing &
Total
perfect linking
per Mtr.
(in Rs.)
5 6

78.00 909.00
115.00 1320.00
151.00 1840.00
175.00 2397.00
228.00 3035.00
276.00 3778.00
365.00 4555.00
450.00 5383.00
500.00 6308.00
751.00 8420.00
826.00 10289.00
909.00 11812.00
1000.00 13194.00
1100.00 15908.00
1210.00 19652.00

79.00 1039.00
117.00 1506.00
154.00 2152.00
179.00 2858.00
253.00 3639.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
283.00 4542.00
375.00 5478.00
461.00 6544.00
513.00 7582.00
767.00 10097.00
844.00 11540.00
929.00 12918.00
1022.00 14300.00
1124.00 17235.00
1236.00 20459.00
1360.00 25023.00
1496.00 30471.00

Kgs 77.00

with latest amendments and conveying to worksite,


and level and perfect linking at joints, testing and
nations and cuts of pipes wherever necessary including
s) with jointing of approved type, with all labour, with
f not less than 15cms with soft gravel or selected earth
sary hydraulic test to the required pressure as per ISS
er for testing).

Cost of Cutting,lowering,
laying, jointing & perfect
Total
linking per Mtr.
(in Rs.)
5 6
16.00 43.00
23.00 63.00
33.00 98.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
43.00 108.00
60.00 140.00
63.00 181.00
81.00 251.00
90.00 353.00
91.00 435.00
108.00 657.00
113.00 1012.00
137.00 1981.00

S 458:1988 with latest amendments and conveying to


ne and level including loading and unloading at both
st of specials) including perfect linking of joints with
e., rubber rings confirming to IS for S&S RCC pipes
ic test to the required pressure as per ISS and testing &
r procuring water for testing)
e Resistant Cement (SRC) only)

Cost of Cutting,lowering,
laying, jointing & perfect
Total
linking per Mtr.
(in Rs.)

5 6
619.0 1780.00
647.0 2226.00
724.0 2490.00
792.0 2773.00
892.0 3129.00
945.0 4023.00
1056.0 5287.00
1216.0 5910.00
1413.0 7064.00
1535.0 8207.00
1943.0 10396.00
ointing materials comprising of rubber insertion, bolts
the required pressure as per ISS with all lead & lift
r for testing).

Each joint 85.00


Each joint 86.00
Each joint 91.00
Each joint 130.00
Each joint 140.00
Each joint 154.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each joint 275.00
Each joint 286.00
Each joint 302.00
Each joint 513.00
Each joint 523.00
Each joint 544.00
Each joint 1005.00
Each joint 1045.00
Each joint 1185.00
ck valve Class 150 Conforming to API 594 with latest
ypes and conveying to work site, loading, unloading,
usive of cost of Bolts and Nuts

Labour charges for


Total
jointing & fixing valve

5 6

251.00 4153.00
267.00 4787.00
353.00 8224.00
466.00 15548.00
717.00 22436.00
781.00 29423.00
869.00 39853.00
1117.00 56462.00
1313.00 67749.00
1359.00 78070.00
1555.00 88087.00
1760.00 124622.00
1956.00 137960.00
2044.00 153042.00
2326.00 212153.00
2501.00 272062.00
2781.00 810101.00
2956.00 1045791.00

251.00 4544.00
267.00 5239.00
353.00 9012.00
466.00 17056.00
717.00 24608.00
781.00 32288.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
869.00 43751.00
1117.00 61997.00
1313.00 74393.00
1359.00 85742.00
1555.00 97895.00
1760.00 136908.00
1956.00 151560.00
2044.00 168142.00
2326.00 233136.00
2501.00 299018.00

Valves with body, bonnet of Ductile Iron of grade


BR and the valves should be of vacuum tight and 100%
6-2000 / DIN 3202 F4/F5. The stem sealing should be
lves should be with electrostatic powder coating both
s shall be supplied with suitable size galvanized bolts

227.00 5810.00
251.00 8552.00
267.00 10838.00
353.00 18965.00
466.00 30082.00
717.00 45275.00
781.00 63832.00
869.00 110881.00
1117.00 133867.00
1313.00 182703.00
1359.00 230432.00
1555.00 332974.00

227.00 5810.00
251.00 8552.00
267.00 10838.00
353.00 18965.00
466.00 30082.00
717.00 45275.00
781.00 63832.00
869.00 110881.00
1117.00 133867.00
1313.00 182703.00
1359.00 230432.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6

227.00 5869.00
251.00 8939.00
267.00 11622.00
353.00 19850.00
466.00 30460.00
717.00 53945.00
781.00 68269.00
1117.00 150330.00
1359.00 251316.00

proof (Both the orifces to be housed in the single


of grade GGG 50. All internal parts such as float, shell
oat of HOSTAFLON / SS 304 and gaskers and seals of
our blue RAL5005. The valves should be designed for

on.

227.00 16364.00
251.00 22996.00
267.00 30672.00
353.00 36287.00
466.00 46534.00

227.00 17989.00
251.00 25162.00
267.00 37994.00
353.00 45855.00
466.00 53555.00

227.00 21454.00
251.00 30143.00
267.00 37994.00
353.00 45855.00
466.00 53555.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
entric) / double eccentrically disc, butterfly valves
on the disc and body seat face of nickel weld overlay
ng with minimum thickness of 250 microns applied on
ns as per EN 558-1 basic series 14 (DIN 3203 F4) or
e supplied along with the required number of standard
is IS 1538. Hence, drilling of hole in the valves shall
to be suitable for buried oepration wiht the gear box

227.00 8654.00
251.00 9569.00
267.00 12013.00
353.00 14455.00

227.00 8654.00
251.00 9569.00
267.00 12013.00
353.00 14455.00

466 17499.00
717 32077.00
781.00 43866.00
869.00 88731.00
1117.00 115320.00
1313.00 124264.00
1359.00 159028.00
1555.00 243508.00
1760.00 378636.00
2044.00 447014.00
2326.00 579628.00
2501.00 736169.00
2956.00 864318.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
466.00 17499.00
717.00 32077.00
781.00 43866.00
869.00 88731.00
1117.00 76594.00
1313.00 124264.00
1359.00 157426.00
1555.00 243508.00
1760.00 378636.00
2044.00 447014.00
2326.00 579628.00
2501.00 736169.00
2956.00 864318.00

1117.00 240909.00
1359.00 374664.00
1555.00 435097.00
1760.00 826641.00
2044.00 821188.00
2326.00 1496066.00
2501.00 1748182.00
2956.00 2202497.00

ck vavles with slanted seat or with lever weight with


seat faces with nickel overlay micro - finished/ Integral
f stainless steel and bearings of zinc free bronze and

227.00 6899.00
251.00 9735.00
267.00 13344.00
353.00 22866.00
466.00 46226.00
717.00 84060.00
781.00 125154.00
869.00 223753.00
1117.00 262257.00
1313.00 399073.00
1359.00 401424.00
1555.00 546193.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
1760.00 924631.00
2044.00 1497409.00
2326.00 1705129.00
2501.00 2085890.00

227.00 6899.00
251.00 9735.00
267.00 13344.00
353.00 22866.00
466.00 46226.00
717.00 84060.00
781.00 125154.00
869.00 223753.00
1117.00 262257.00
1313.00 427185.00
1359.00 443102.00
1555.00 555274.00
1760.00 924631.00
2044.00 1554438.00
2326.00 1790273.00
2501.00 2112341.00

line, cleaning,washing and returning the same to the

Each 228.00
Each 243.00
Each 321.00
Each 421.00
Each 652.00
Each 710.00
Each 1015.00
Each 1194.00
Each 1414.00
Each 1600.00
Each 1778.00
Each 2114.00

Each 78.00
Each 90.00
Each 157.00
Each 286.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each 315.00
Each 393.00
terials and washing (this includes the removal of DI

Mtr 53.00
Mtr 64.00
Mtr 80.00
Mtr 92.00
Mtr 107.00
Mtr 121.00
Mtr 150.00
Mtr 171.00
Mtr 182.00
Mtr 214.00
Mtr 235.00
Mtr 256.00
Mtr 321.00
rrosive paint including cost of paint etc.
Mtr 21.00
Mtr 25.00
Mtr 39.00
Mtr 47.00
Mtr 54.00
Mtr 62.00
Mtr 68.00
Mtr 77.00
Mtr 117.00
Mtr 140.00
Mtr 176.00
Mtr 219.00
Mtr 263.00
Each 793.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each 488.00

Each 584.00
Each 668.00
Each 3862.00

Each 2735.00

Each 1894.00

Each 5100.00
Each 7150.00

Each 1587.00

Each 2079.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
ll be considered”.

Each 440.00

Each 2275.00

Each 1646.00
Each 2634.00
Each 5501.00
Each 214.00

Each 2300.00

Each 418.00

Each 118.00

Each 73.00

Each 91.00
Each 114.00
Each 180.00
Each 736.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each 35.00

Each 25.00

Each 129.00

Each 258.00

Each 316.00

Each 334.00
Each 499.00

Mtr 19.00

Mtr 392

Mtr 570

Cum 7852.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6

Each 1386.00

Each Group 1901.00

Each 1551.00

Each 339.00

Each 320.00

Each 2975.00

Each 3974.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
Each 1487.00

Mtr 19.00

laying & Jointing, testing, commissioning of ERW


d) MS pipes (Fe-410 grade) conforming to IS 3589-
elding of joints to correct position including cost and
of all labour and giving satisfactory hydraulic test as
e and working pressure both at factory and site etc
lining of minimum 10 mm thick upto 610 mm OD &
mum 25 mm thick coating in CM 1:3 over 50 x 50 mm
pes for the following diameters and specified thickness
wherever necessary. (Contractor will make his own

ble.
r MT
aka.

Cost of inner lining, outer Total cost per


coating, lowering, laying, Mtr
jointing, perfect linking per
mtr (in Rs.) (in Rs.)
6 7
1425.00 2795.00
1426.00 2963.00
1426.00 3019.00
1425.00 3128.00
1425.00 3239.00
1425.00 3403.00
1426.00 3649.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
1426.00 3730.00
1427.00 3866.00
1422.00 4075.00

1584.00 3301.00
1584.00 3581.00
1583.00 3719.00
1584.00 3859.00
1584.00 4136.00
1578.00 4337.00
1578.00 4644.00
1570.00 4840.00

1729.00 4105.00
1729.00 4272.00
1729.00 4438.00
1729.00 4727.00
1729.00 5057.00
1726.00 5259.00
1726.00 5382.00
1726.00 5708.00

1852.00 4465.00
1852.00 4648.00
1852.00 4831.00
1838.00 5137.00
1837.00 5499.00
1837.00 5860.00
1836.00 6219.00

2010.00 4999.00
2010.00 5209.00
2009.00 5418.00
2008.00 5784.00
2008.00 6201.00
2007.00 6615.00
2004.00 7026.00
2003.00 7282.00

2228.00 5598.00
2227.00 6071.00
2227.00 6485.00
2226.00 6956.00
2225.00 7425.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
2221.00 7889.00
2220.00 8179.00

2395.00 6146.00
2394.00 6674.00
2390.00 7131.00
2387.00 7654.00
2387.00 8178.00
2386.00 8700.00
2386.00 9025.00

2627.00 6758.00
2625.00 7340.00
2623.00 7847.00
2624.00 8428.00
2621.00 9004.00
2620.00 9580.00
2619.00 9938.00

2832.00 7344.00
2831.00 7981.00
2828.00 8535.00
2829.00 9170.00
2827.00 9801.00
2826.00 10432.00
2826.00 10825.00
2823.00 12390.00

3114.00 8691.00
3113.00 9293.00
3110.00 9978.00
3108.00 10662.00
3107.00 11346.00
3106.00 11772.00

3315.00 9327.00
3314.00 9977.00
3313.00 10718.00
3311.00 11457.00
3311.00 12196.00
3310.00 12656.00
3305.00 14488.00

3572.00 10718.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
3571.00 11513.00
3562.00 12299.00
3561.00 13092.00
3560.00 13586.00

3724.00 11352.00
3723.00 12203.00
3720.00 13049.00
3719.00 13896.00
3718.00 14424.00
3714.00 16529.00

4340.00 13357.00
4338.00 14259.00
4309.00 15132.00
4308.00 15694.00

4930.00 14473.00
4929.00 15430.00
4927.00 16383.00
4915.00 16967.00

4635.00 15727.00
4633.00 16735.00
4631.00 17363.00

4631.00 16315.00
4929.00 17677.00
4927.00 18339.00
4918.00 20981.00

5288.00 17563.00
5285.00 18679.00
5284.00 19376.00

5288.00 18155.00
5285.00 19325.00
5284.00 20056.00

5667.00 20340.00
5666.00 21105.00

5848.00 21967.00
5846.00 25945.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6

6953.00 30434.00
6951.00 33593.00

7603.00 38106.00
7599.00 41930.00

9462.00 43806.00
9459.00 48119.00
9456.00 51705.00

10172.00 53160.00
10170.00 57154.00
10164.00 63793.00

10841.00 62559.00
10836.00 69876.00
10831.00 76301.00

13526.00 80696.00
13519.00 88012.00
12920.00 96716.00

ying and jointing, testing and commissioning of MS


5 with latest amendments, perfect linking and welding
materials with all lead and lifts, cost of all labour and
est amendments for test pressure and working pressure
tions with inside lining two coats of food grade epoxy
k (after dry) over one coat of food grade epoxy primer
dry) and outside 25mm thick coating in CM 1:3 by
ding of pipes for the following category to suit PSC/
be considered before lining and coating for arriving at
neer. (contractor will make his own arrangements for

Per Kg 135.00
Per Kg 124.00
able for inside surface of the pipe, food grade expoxy
posed and got approved.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
est amendments and conveying to work site including
g into trenches, laying true to line and jointing of pipes
pipe around to a depth not less than 15cms with soft
mplete giving hydraulic test as per relevant ISS with all
e is exclusive of required specials and fittings etc.,
uring water for testing)

Labour Charges for laying


Total Cost
& Jointing per Mtr.
(in Rs.)
(in Rs.)

55.00 142.00
55.00 179.00
55.00 231.00
67.00 331.00
67.00 406.00
94.00 518.00
94.00 647.00
94.00 791.00
108.00 971.00
108.00 1196.00
109.00 1452.00
109.00 1788.00
125.00 2250.00
136.00 2829.00
148.00 3648.00
156.00 4576.00
168.00 5773.00
168.00 7161.00
179.00 9158.00
179.00 15909.00

55.00 162.00
55.00 209.00
55.00 271.00
67.00 395.00
67.00 486.00
94.00 626.00
94.00 781.00
94.00 954.00
108.00 1176.00
108.00 1461.00
109.00 1777.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
109.00 2248.00
125.00 2829.00
136.00 3504.00
148.00 4482.00
156.00 5628.00
168.00 6907.00
168.00 8581.00
179.00 10962.00
179.00 19580.00

55.00 186.00
55.00 241.00
55.00 321.00
67.00 463.00
67.00 574.00
94.00 735.00
94.00 924.00
94.00 1142.00
108.00 1404.00
108.00 1754.00
109.00 2136.00
109.00 2695.00
125.00 3392.00
136.00 4225.00
148.00 5406.00
156.00 6785.00
168.00 8332.00
168.00 10376.00
179.00 13251.00

55.00 212.00
55.00 277.00
55.00 371.00
67.00 542.00
67.00 679.00
94.00 868.00
94.00 1092.00
94.00 1351.00
108.00 1665.00
108.00 2084.00
109.00 2552.00
109.00 3197.00
125.00 4019.00
136.00 5051.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
148.00 6437.00

55.00 239.00
55.00 316.00
55.00 429.00
67.00 632.00
67.00 790.00
94.00 1008.00
94.00 1275.00
94.00 1584.00
108.00 1958.00
108.00 2445.00
109.00 2999.00
109.00 3780.00
125.00 4754.00
136.00 5971.00
148.00 7602.00
995

Labour Charges for laying


Total Cost
& Jointing per Mtr.
(in Rs.)
(in Rs.)

55.00 130.00
55.00 162.00
55.00 210.00
67.00 288.00
67.00 358.00
94.00 451.00
94.00 556.00
94.00 682.00
108.00 836.00
108.00 1033.00
109.00 1289.00
109.00 1585.00
125.00 1941.00
136.00 2487.00
148.00 3174.00
156.00 3948.00
168.00 4840.00
168.00 6167.00
179.00 7802.00
179.00 13628.00

55.00 148.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
55.00 187.00
55.00 249.00
67.00 347.00
67.00 433.00
94.00 544.00
94.00 677.00
94.00 835.00
108.00 1025.00
108.00 1270.00
109.00 1584.00
109.00 1955.00
125.00 2407.00
136.00 3073.00
148.00 3940.00
156.00 4922.00
168.00 6032.00
168.00 7678.00
179.00 9709.00
179.00 16604.00

55.00 167.00
55.00 213.00
55.00 285.00
67.00 400.00
67.00 501.00
94.00 629.00
94.00 788.00
94.00 980.00
108.00 1204.00
108.00 1492.00
109.00 1858.00
109.00 2296.00
125.00 2843.00
136.00 3640.00
148.00 4673.00
156.00 5829.00
168.00 7161.00
168.00 9078.00
179.00 11494.00
179.00 20392.00

55.00 186.00
55.00 240.00
55.00 327.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6
67.00 463.00
67.00 582.00
94.00 731.00
94.00 922.00
94.00 1146.00
108.00 1409.00
108.00 1756.00
109.00 2180.00
109.00 2702.00
125.00 3355.00
136.00 4285.00
148.00 5512.00

55.00 212.00
55.00 278.00
55.00 380.00
67.00 541.00
67.00 684.00
94.00 858.00
94.00 1091.00
94.00 1356.00
108.00 1670.00
108.00 2084.00
109.00 2591.00
109.00 3216.00
125.00 4000.00
136.00 5101.00
148.00 6567.00
156.00 8253.00
168.00 10138.00

Rmtr 7.65

Nos 2075.00

Nos 1125.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6

Nos 1125.00

ter meter point (which shall be fixed about one meter

trenches for laying of MDPE/GI pipes of following


tegrated rock,soft rock, hard rock, including cutting of
, cutting any surfaces along the pipelines such as
, boring the wall surfaces comprising of BBM or SSM
he damaged portions inside or outside the property
tc. complete.

ch as EF ferrule of diameters to suit 63 mm dia HDPE


echanical type clamp saddle with bypass arrangement)
with cost of GI pipes including all specials such as GI
peline.

gether to be interfaced to the pipeline.


Nos 6,015.00
Nos 6,285.00
Nos 6,618.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


5 6

Nos 230.00

Nos 500.00

hermetically sealed water meters with copper Glass


mechanism type manufactured as ISO 4064-1: 1993
itting consumption data on daily basis to central server
o the meter without wire. The consumption data shall
logger should provide data like flow rate, total flow,
flow distribution, leakage detection. The data logger
pressure below or above limits.

Nos 59,200.00
Nos 63,750.00
Nos 69,200.00
Nos 82,800.00
Nos 102,000.00
Nos 134,800.00
Nos 286,900.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


PART-III- RCC Over Head Reservoirs
Item
Specification
No.
Note:
1) Use approved quality of water proof cement compound, for inside plastering and finishing works of
structures.
2) For balance old works of OHT's for which staging work i.e. including ring beam work is completed 50 %
RCC items and hoisting of CI flanged pipes is applicable on basic rate excluding cost of cement and steel.

3) A weightage of 20% is applicable on the basic rate excluding cost of cement and steel only for concrete
of capacity 2.5 lakh litres and below.
4) Superplasticizer confirming to IS 9103- 1999 shall be proposed for M25 & M30 design mix concre
superplasticizer shall be as per respective circles of PWD SR.

5) Staging is defined as the height above top of foundation girder and below top of bottom ring girder.

1 Earth work excavation

2 Providing and laying C.C. 1:1.5:3 proportion for foundation (Screed layer) with 20 mm
and down size of approved gradation hard broken granite, trap basalt or with any other
approved hard aggregate including cost and conveyance of all materials with an all
lead & lifts including plywood / steel form work, machine mixing, laying, tamping,
curing etc., complete.

3 (a) Providing and laying vibrated M25 design mix for RCC works (excluding cost of
reinforcement) with 20mm and down size of approved gradation hard broken granite,
trap, basalt or with any other approved hard aggregate including weigh batch plant
mixing and conveyance of all materials with all lead and lift laid in 15cms thick,
layers well consolidated vibrating curing smooth finishing the exposed faces wherever
necessary plywood / steel form work, centering etc., complete for
independent/combined footing, raft, beams below ground level (minimum Cement @
360Kgs).

(b)- do- with plastering and smooth finishing the exposed faces in CM 1:4, 12 mm
thick etc., complete for beams below ground level. (minimum Cement @ 360Kgs).

Note : A weightage of 10% over the rates for items 2, 3(1) and 3(2) may be allowed for
dewatering if the concrete is to be laid in watery situation.
4 Providing and laying vibrated M30 design mix for RCC work (Excluding cost of
reinforcement) with 20 mm and down size of approved gradation hard, broken granite,
trap, basalt or any other approved hard aggregate with plastering and smooth
finishing the exposed faces in C.M. 1:3 12mm thick including cost and conveyance of
all materials with all lead & lifts. including weigh batch plant mixing, plywood/steel
form work, centering, scaffolding, curing, as per designs etc., complete for columns,
braces and ring beam above ground level (minimum Cement @ 400 Kgs).

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1) Upto G.L and 6 Mtr. Height
2) Above 6 Mtr. upto 9 Mtr. Height
3) Above 9 Mtr. upto 12 Mtr. Height
4) Above 12 Mtr. upto 15 Mtr. Height
5 Providing and laying vibrated M25 design mix for RCC work (Excluding cost of
reinforcement) with 20 mm and down size of approved gradation hard broken granite,
trap, basalt or any other approved hard aggregate including cost and conveyance of all
materials with all lead & lift including weigh batch plant mixing plywood/steel form
work, centering, scaffolding, curing, plastering and smooth finishing the exposed
faces in C.M. 1:3 12 mm thick as per designs etc. complete for RCC Shaft (minimum
Cement @ 360Kgs).

1) Below G.L
2) Above G.L upto 6 Mtr. Height
3) Above 6 Mtr. upto 9 Mtr. Height
4) Above 9 Mtr. upto 12 Mtr. Height
5) Above 12 Mtr. upto 15 Mtr. Height
6 a) Providing and laying vibrated M30 design mix for RCC work (excluding cost of
reinforcement) with 20 mm and down size of approved gradation hard broken, granite,
trap, basalt or any other approved hard aggregate including cost and conveyance of all
materials with all lead & lift, plywood/steel form work, centering, scaffolding,
plastering and smooth finishing the exposed faces in CM. 1:3 12 mm thick and CM
plastering 1:3 proportion 20 mm thick for inside with an admixture of water proof
compound of requisite proportion of approved quality including weigh batch plant
mixing, curing etc., and reservoir given satisfactory water proof testing as per
directions, etc., complete, for conical shell portion, bottom dome/slab,side wall and
ribs over the staging. (Contractor will make his own arrangements for procuring water
for testing) (Cement @ 400 Kgs).

1) Upto 6 Mtr. Staging


2) Above 6 Mtr. upto 9 Mtr. Staging
3) Above 9 Mtr. upto 12 Mtr. Staging
4) Above 12 Mtr. upto 15 Mtr. Staging
b) -do- for Side wall
1) Upto 6 Mtr. Staging
2) Above 6 Mtr. upto 9 Mtr. Staging
3) Above 9 Mtr. upto 12 Mtr. Staging
4) Above 12 Mtr. upto 15 Mtr. Staging

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


7 Providing and laying vibrated M30 design mix for RCC work (excluding cost of
reinforcement) with 20 mm and down size of approved gradation hard broken granite,
trap, basalt or any other approved hard aggregate including cost and conveyance of all
materials with all lead and lifts above staging including weigh batch plant mixing,
centering, plywood/steel form work, scaffolding, tamping, curing, cement mortar
plastering 1:3 proportion 12 mm thick for both inside and outside surface etc.,
complete, for Top dome/ Slab. (Cement @ 400 Kgs).

1) Upto 6 Mtr. Staging


2) Above 6 Mtr. upto 9 Mtr. Staging
3) Above 9 Mtr. upto 12 Mtr. Staging
4) Above 12 Mtr. upto 15 Mtr. Staging
8 Providing and laying vibrated cement concrete 1: 1½ :3 proportion for RCC work for
spiral stair case (excluding cost of reinforcements) as per designs using 10mm and
down size of approved gradation hard broken, granite, trap, basalt or any other
approved hard aggregate including cost and conveyance of all materials with all lead
and lift, plywood/steel form work, centering, scaffolding and cement mortar plastering
1:3 proportion 12 mm thick for all exposed surfaces of stair case including machine
mixing, rounding all corners finished smooth rendering, curing etc., complete above
ground level.

1) Upto 6 Mtr. Staging


2) Above 6 Mtr. upto 12 Mtr. Staging
3) Above 12 Mtr. upto 18 Mtr. Staging
4) Above 18 Mtr. upto 24 Mtr. Staging
9 Labour charges for fabricating mild steel or torsteel bars of all sizes for reinforcement
for RCC works including conveying steel to work spot with all lead including cleaning,
straightening, bending, fabricating, placing in position and tieing as per design
including cost of binding wire hoisting etc., with all lifts etc., complete (Excluding cost
of steel).
1) Upto 6 Mtr. Staging
2) Above 6 Mtr. upto 9 Mtr. Staging
3) Above 9 Mtr. upto 12 Mtr. Staging
4) Above 12 Mtr. upto 15 Mtr. Staging
10 Providing and fixing M.S. ladder between landing 45 cms. wide using angle iron of
following size and 20 mm M.S. bars at 25cms. centre to centre with necessary supports
of same angle iron as directed including hand railing on both sides with 25mm dia G.I.
pipes with angle iron props at 2 mtrs, interval and 0.5 mtr, height including fixing in
ground with C.C. 1:2:4 and two coats of nonpoisonous anticorrosive bituminous paint
with all lead and lift etc., complete.
Note: Only exposed ladder portion above G.L. to be paid for.

a) 65 x 65 x 8 mm angle iron
b) 65 x 65 x 10/12 mm angle iron

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


11 Providing and fixing R.C.C. finial and ventialators as per approved design and
specification with form work and protected with wire mesh. The plinth to be of R.C.C.
circular pillars and canopy with an ornamental finish at top. The first 22.50 Cms.
height to be covered with RCC panelling as per detailed drawing with all lead and lifts
etc., complete.

1) For tanks upto 2.50 lakh liters capacity.


2) For tanks above 2.5 lakh liters and upto 5 lakh liters capacity
3) For tanks above 5 lakh liters and upto 10 lakh liters capacity
12 Providing and fixing M.S. Inspection door of size 60 cms x 60 cms. including M.S.
frame, size 50 x 50 x 6 mm and shutters of 3mm thickness with hinges at top and
locking arrangements,painting with all lead and lifts etc., complete.

13 (a) Providing and fixing guage with iron sheet of 3 mm to 4 mm thickness, 0.23 Mtr.
width with copper floats indicators and flexible nylon wires, painting figures with
approved enamelled paint with all lead and lifts etc., complete.

1) 0 to 1.5 Mtr. Depth


2) 0 to 2 Mtr. Depth
3) 0 to 2.5 Mtr. Depth
Note : Add Rs.946.00 for every 0.5 Mtr. or part there of, for depth beyond 2.50 Mtr.
(b) -do- enamelled gauge plate.
1) 0 to 1.5 Mtr. Depth
2) 0 to 2 Mtr. Depth
3) 0 to 2.5 Mtr. Depth
Note : Add Rs.723.00 for every 0.5 Mtr. or part there of, for depth beyond 2.5 Mtr.

14 Supplying & Fixing CI puddle flanges conforming to IS 7181-1986 with latest amendments, in position f
including hoisting and conveying them to work spot with all lead and lift etc., complete.

Cost of CI
Sl.
Dia of CI Puddle Flanges Unit Puddle Flange
No.
(in Rs.)

1 2 3 4
1) 80 mm Each 2,156.00
2) 100 mm Each 2,681.00
3) 150 mm Each 4,406.00
4) 200 mm Each 6,393.00
5) 250 mm Each 8,587.00
6) 300 mm Each 11,015.00
7) 350 mm Each 14,859.00
8) 400 mm Each 18,173.00
9) 450 mm Each 21,684.00
10) 500 mm Each 25,425.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


11) 600 mm Each 34,171.00
15.A Supplying, laying of CI flanged pipe true to line / hoisting of CI flanged pipe conforming to IS 7181-1
comendments in position and aligning to correct plumb including cost of jointing material, conveying to wo
lead and lifts etc., complete

Cost of CI
Sl.
Dia of CI Puddle Flanges Unit Puddle Flange
No.
(in Rs.)

1 2 3 4
1) 80 mm Mtr 1687.00
2) 100 mm Mtr 2118.00
3) 150 mm Mtr 3375.00
4) 200 mm Mtr 4781.00
5) 250 mm Mtr 6468.00
6) 300 mm Mtr 8250.00
7) 350 mm Mtr 11156.00
8) 400 mm Mtr 13500.00
9) 450 mm Mtr 16312.00
10) 500 mm Mtr 19125.00
11) 600 mm Mtr 25593.00

15.B Supplying, of DI flanged pipe onforming to IS 8329 : 2000 with latest amendments with Cement Mortar
with Portland Slag Cement as per IS 455:1989 and Metallic Zinc Coating as per annex A of IS 8329 with fi
Bituminous Coating as per Annex C of IS 8329 and Flanges: Metallic zinc rich epoxy paint & Bituminous
true to line and hoisting in position and aligning to correct plumb including cost of jointing material, con
spot with all lead and lifts etc., complete

Cost of DI
Sl.
Dia of DI Puddle Flanges Unit Puddle Flange
No.
(in Rs.)

1 2 3 4
PN 10
1) 100 mm Mtr 1813.00
2) 150 mm Mtr 2567.00
3) 200 mm Mtr 3726.00
4) 250 mm Mtr 5196.00
5) 300 mm Mtr 6832.00
6) 350 mm Mtr 8479.00
7) 400 mm Mtr 11061.00
8) 450 mm Mtr 13760.00

PN 16
1) 100 mm Mtr 1813.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


2) 150 mm Mtr 2567.00
3) 200 mm Mtr 3726.00
4) 250 mm Mtr 5196.00
5) 300 mm Mtr 7048.00
6) 350 mm Mtr 11097.00
7) 400 mm Mtr 13377.00
8) 450 mm Mtr 18351.00

16 Supplying and fixing lightening arrestor of aluminium strip 25mm x 3 mm size including finial and ground
strip is to be embeded in one of the columns in an independent GI conduit of 40 mm dia pipe suitably jo
with all specials with all lead and lifts etc., complete.

1) For tanks upto 6 Mtr. Staging


2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging
17 a) Providing two coats of water proof cement painting of approved colour and shade over one coat of p
scraping the surface with wire brushes etc., before removal of scaffolding for new R.C.C. over head tanks
paint stains wherever necessary with all lead & lift etc., complete.

1) For tanks upto 6 Mtr. Staging


2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging

(b) Providing two coats of water proof cement painting of approved colour and shade over one coat of p
necessary scaffolding and scraping of old paint and stain with wire brushes and cleaning of paint s
necessary for old R.C.C. over head tank. with all lead & lifts etc., complete

1) For tanks upto 6 Mtr. Staging


2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging

18 Supplying & fixing 40 mm dia G.I. medium duty pipes hand railing 3 rows fixed to
1:2:4 vibrated R.C.C. post of size 100 x 150 mm at top and 150 x 150 mm at bottom
placed at 2 Mtr. intervals for a height of 750 mm including curing, painting G.I. pipes
with two coats of anticorrosive steel paint over a primer coat with all lead and lift etc.,
complete. (Rate per Mtr. is for 3 rows of G.I. pipes.)

19 Providing plastering in C.M. 1:3 proportion including smooth finishing with minimum 2% of approved q
proof compound including curing with necessary scaffolding by removing the old plaster wherever ne
existing R.C.C. over head tank and giving satisfactory water proof testing as per directions etc., complete
lifts for side walls, shell portion, bottom dome, bottom slab and ribs over the staging.

(a) -do- 12 mm thick for exposed surface (outside)

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1) For tanks upto 6 Mtr. Staging
2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging

(b) -do- 20 mm thick for inside surface (inside)

1) For tanks upto 6 Mtr. Staging


2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging
20 Providing plastering in C.M. 1:3 proportion including smooth finishing with minimum 2% of approved q
proof compound including curing with necessary scaffolding for RCC over head tank and giving satisfact
testing as per directions etc., complete with all lead & lifts for side walls, shell portion, bottom dome, bo
ribs over the staging.

(a) -do- 12 mm thick for exposed surface (outside)


1) For tanks upto 6 Mtr. Staging
2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging

(b) -do- 20 mm thick for inside surface (inside)


1) For tanks upto 6 Mtr. Staging
2) For tanks above 6 Mtr. upto 9 Mtr. Staging
3) For tanks above 9 Mtr. upto 12 Mtr. Staging
4) For tanks above 12 Mtr. upto 15 Mtr. Staging

21 Providing & fixing of Aluminium Ventilators of frame size 40 x 18 mm of 1.3 mm


thick, 0.933 Kg/ M all aluminium sections including cutting to required length, joints
mitred subdiving the frame tenonned and riveted, in the assembled frame, stiffened
with end clips for corners, angles etc., and fixed to the walls, lintels, floor beams/cills
as the case may be with necessary steel screws, raul plugs or teak wood gatties
including cutting masonry or concrete and making good the original surface using
cement mortar, along with fixing of SS mesh alround with necessary required materials
to fix the SS-304 Mesh as directed by EIC.

2. Ground Level Service Reservoir and Water Retaining Structures


1 Earth work excavation

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


2 Providing and laying C.C. 1:1.5:3 proportion for foundation (Screed layer) with 20 mm
and down size of approved gradation hard broken granite, trap basalt or with any other
approved hard aggregate including cost and conveyance of all materials with an all
lead & lifts including plywood / steel form work, machine mixing, laying, tamping,
curing etc., complete.

3 (a) Providing and laying vibrated M25 design mix for RCC works (excluding cost of
reinforcement) with 20 mm and down sizeof approved gradation hard broken granite,
trap, basalt or with any other approved hard broken granite, including weigh batch
plant mixing cost and conveyance of all materials with all lead and lift laid in 15 Cms,
thick layers well consolidated,vibrating, curing, plastering and smooth finishing to
the expose faces wherever necessaery, plywood/steel form work, centering etc.,
complete for independent/combined footing, raft, beams below ground level
(Cement @ 360kgs).

(b) Providing and laying vibrated M30 design mix for RCC work using 20 mm and
down size metal of approved gradation hard broken granite, trap, basalt or with any
other approved hard broken granite, including weigh batch plant mixing cost and
conveyance of all materials with all lead and lift. for RCC Works in 15 Cms, thick
layers well compacted curing, with necessary plywood/steel form work, centering etc.,
plastering and smooth finishing to the expose faces in CM 1:4 proportion. 12mm
thick etc., complete for main and secondary beams below & above floor level
(Cement @400kgs).

4 (a) Providing and laying vibrated M30 design mix for R.C.C. Works with 20 mm and
down size of approved gradation hard broken granite, trap, basalt or any other
approved hard aggregate, including, cost and conveyance of all materials with all lead
& lift, including plywood/steel form work, centering, scaffolding, cement mortar,
plastering in CM 1:3 proportion, 20mm. thick for inside with admixture of water proof
compound of requisite proportion of approved quality including weigh batch plant
mixing, curing, making construction joints wherever necessary and giving satisfactory
water proof testing etc., complete (excluding cost of reinforcement) for floor slab,
resting on ground. (contractor will make his own arrangements for procuring water
for testing) (Cement @ 400 Kgs).

(b) -do- for vertical side walls, alround effluent channel,baffels, etc. complete with
outside form finishing (Cement @ 400 Kgs).
5 Providing and laying vibrated cement concrete 1:1½:3 proportion for RCC columns
below and above G.L. with 20 mm and down size of approved gradation hard
aggregate including cost and conveyance of all materials with all lead lift. with
plywood or steel form work, centering including machine mixing laying, vibrating and
smooth finishing the expoled faces in cm 1:3, 12 mm thick etc., complete (excluding
cost of reinforcement).

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


6 Providing and laying vibrated M30 design mix for RCC work with 20 mm and down
size of approved gradation hard broken granite, basalt, trap or any other approved hard
aggregate including cost and conveyance of all materials with all lead and lift including
weigh batch plant mixing, centreing plywood / steel form work, scaffolding tamping,
curing, cement mortar plastering in C.M. 1:3 proportion 12 mm. thick for inside
surface etc., complete (excluding cost of reinforcement) for R.C.C. covering slab
(Flat slab) (Cement @ 400 Kgs).

(2) -do- For RCC Dome with plastering outside and inside with C.M. 1:3 proportion
12 mm thick (Cement @ 400 kgs).

7 Providing and constructing granite, trap, basalt or any other approved hard stone
uncoursed rubble masonry in C.M. 1:4 proportion (excluding pointing) in courses not
less than 20 Cms. high including scaffolding curing etc., complete with all lead & lifts.
for all materials.

8 Providing and constructing granite, trap or basalt or basalt or any other approved hard
granite stone coursed rubble masonry, second sort/size stone masonry in CM 1:4
proportion (excluding pointing) in courses not less than 20 Cms high with bond stones
2 Mtrs. apart in each course and all exposed quions 2 line dressed 5 cms wide on each
face including scaffolding curing with all lead & lift for materials, necessary hydraulic
test for water tightness etc., complete (contractor will make his own arrangements for
procuring water for testing).

9 (a) Providing pointing to stone masonry in cement mortar 1:3 including scaffolding,
racking out joints 25 mm. deep, smooth finishing, curing etc., complete with all lead
and lift for all materials for grooved pointing.

(b) -do- for Tuck pointing.


10 Providing plastering 2 to 3 cms. thick in CM. 1:3 proportion including scaffolding,
racking out joint smooth finishing with minimum 2% of approved quality water proof
compound including curing with all lead and lift for all materials etc., complete.

11 Labour charges for fabricating mild steel or tor steel bars of all sizes for reinforcement
of R.C.C. works including conveying steel to workspot with all lead including cleaning
straighteing, bending, fabricating, placing in position, tieing as per designs including
cost of binding wire hoisting all lift etc., complete (Excluding cost of Steel).

12 For M.S ladder,finial ,lightening arrestor and fixing gauge.

13 Providing and fixing PVC water stopper of suitable type of 230 mm width and 5 mm
thickness for construction joints as per detailed technical specifications and as directed
by Engineer-in-charge.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


14 Providing, fixing, applying of contraction joint with suitable type PVC water stopper
of 230 mm width and 5 mm thick sealed with 12 mm x 25 mm gun grade polysulphide
elastomeric joint sealant of FOSROC make (NITO seal MS 600) over a backer rod and
high performance laminated closed cell polyethylene foam joint filler of suitable make
(CAPCELL-HD-100) in sheet foam having a density of 100 Kg / Cum, non staining
with less than 1% water absorption, having 97% recovery at compression and as
directed by Engineer-in-charge.

Galvolume Roofing : Refer respective PWP & IWTD S.R.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


rs
Rate
Unit
(in Rs.)

tering and finishing works of water retaining

g beam work is completed 50 % weightage for


ding cost of cement and steel.

ent and steel only for concrete items, for ESRs

25 & M30 design mix concrete.The rate for

top of bottom ring girder.

For Specifications and rates refer


Excavation by Mechanical means
as per item No.1 (1).vii of part II

Cum 5505.00

Cum 6665.00

Cum 6863.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Cum 12010.00
Cum 17120.00
Cum 19056.00
Cum 21924.00

Cum 13011.00
Cum 13927.00
Cum 14385.00
Cum 14843.00
Cum 15301.00

Cum 17509.00
Cum 19192.00
Cum 21299.00
Cum 24722.00

Cum 19874.00
Cum 21880.00
Cum 24544.00
Cum 28988.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Cum 19725.00
Cum 22309.00
Cum 24489.00
Cum 27540.00

Cum 26750.00
Cum 32249.00
Cum 34131.00
Cum 38910.00

M.Ton 10988.00
M.Ton 11603.00
M.Ton 11911.00
M.Ton 12526.00

Mtr 1821.00
Mtr 2027.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Each 5776.00
Each 6703.00
Each 7168.00
Each 1818.00

Each 4626.00
Each 5572.00
Each 6518.00

Each 4603.00
Each 5327.00
Each 6050.00

test amendments, in position for R.C.C. walls


, complete.

Labour Charges
for fixing CI
Total
Puddle Flanges per
each (in Rs.)
5 6
491.00 2647.00
491.00 3172.00
491.00 4897.00
986.00 7379.00
986.00 9573.00
1338.00 12353.00
1338.00 16197.00
1338.00 19511.00
2197.00 23881.00
2197.00 27622.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


2197.00 36368.00
pipe conforming to IS 7181-1986 with latest
nting material, conveying to work spot with all

Labour Charges
for fixing CI
Total
Puddle Flanges per
each (in Rs.)
5 6
281.00 1968.00
281.00 2399.00
281.00 3656.00
377.00 5158.00
377.00 6845.00
456.00 8706.00
456.00 11612.00
456.00 13956.00
643.00 16955.00
643.00 19768.00
643.00 26236.00

endments with Cement Mortar Lining (CML)


per annex A of IS 8329 with finishing layer of
ich epoxy paint & Bituminous Coating, laying
g cost of jointing material, conveying to work

Labour Charges
for fixing DI
Total
Puddle Flanges per
each (in Rs.)
5 6

281.00 2094.00
281.00 2848.00
377.00 4103.00
377.00 5573.00
456.00 7288.00
456.00 8935.00
456.00 11517.00
643.00 14403.00

281.00 2094.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


281.00 2848.00
377.00 4103.00
377.00 5573.00
456.00 7504.00
456.00 11553.00
456.00 13833.00
643.00 18994.00

ize including finial and grounding, aluminium


of 40 mm dia pipe suitably jointed by collars

Each 10872.00
Each 13601.00
Each 16327.00
Each 19055.00
and shade over one coat of primer including
r new R.C.C. over head tanks and cleaning of

Sqm 185.00
Sqm 204.00
Sqm 222.00
Sqm 241.00

and shade over one coat of primer including


shes and cleaning of paint stains wherever

Sqm 185.00
Sqm 204.00
Sqm 222.00
Sqm 241.00

Per Mtr of 3 rows 911.00

h minimum 2% of approved quality of water


g the old plaster wherever necessary for the
s per directions etc., complete with all lead &
staging.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Sqm 317.00
Sqm 348.00
Sqm 380.00
Sqm 412.00

Sqm 342.00
Sqm 374.00
Sqm 412.00
Sqm 437.00
h minimum 2% of approved quality of water
head tank and giving satisfactory water proof
shell portion, bottom dome, bottom slabs and

Sqm 294.00
Sqm 325.00
Sqm 357.00
Sqm 389.00

Sqm 316.00
Sqm 348.00
Sqm 380.00
Sqm 412.00

Sqm 3028.00

For Specifications and rates refer


Excavation by Mechanical means
as per item No.1 (1).vii of part II

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Cum 5505.00

Cum 6665.00

Cum 7134.00

Cum 7308.00

Cum 13224.00

Cum 12655.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Cum 12674.00

Cum 16072.00

Cum 3071.00

Cum 2972.00

Sqm 190.00

Sqm 204.00
Sqm 222.00

M.Ton 9451.00

80% of Rates of ESR is applicable

Mtr 392.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Mtr 570.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


PART IV: (OPEN WELL & JACK WELL, CONNECTING PIPELINE, WELL SINKING, BORE WELL

Item
Specification Unit
No.
1. Open Well &JackWell
Note: For excavation and concrete works below ground level an additional weightage of 25% is applic
(excluding the cost of cement and steel )for Jack well, Connecting main, Intake well, Switch
room,Transformer substation ,Footbridge work,Anchor Block,Thrust Block and RCC supports at H
works only.

1 Diversion of water course by providing coffer dams or ring bunds or islands as may be necessary for in
well, connecting pipe line, Jackwell etc. for foundation bailing out by pumping water during excavation
until completion of foundation and dismantling of coffer dam or ring bund or Island after completio
work etc., complete with all lead & lifts.

1) 0 to 2 Mtr. Height Cum


2)-do- 2 Mtr. to 4 Mtr. Height Cum
3) Beyond 4 Mtr. Height Cum

Earth work excavation


Earth work excavation for foundation by Manual means - DELETED

2 Earthwork in excavation for foundations of structures by Mechanical Means as per drawing and techni
specification, including setting out, construction of shoring, strutting, barricading, danger lighting, brac
removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to
extent required , utilising the available excavated earth locally for the work etc., complete

a -do- In Ordinary / All soils / Hard soil

0-3 mtr depth Cum


3-6 mtr depth Cum
6-9 mtr depth Cum
9-12 mtr depth Cum
Note : Add Rs 18.00 per cum. for every additional 3 Mtr. depth or part there off, for depth beyond 12 Mt

b Ordinary rock comprising of lime stone, sand stone, hard laterite, fissured rock, conglomerate or other so
disintegrated rock which may be querried or split with crow bars. Boulders which do not require blas
having max. dia in any direction of more than 300mm; found lying loose on the surface or embedded in r
bed, soil, talus, slope wash and terrace material of dissimilar origin.

0-3 mtr depth Cum


3-6 mtr depth Cum
6-9 mtr depth Cum
9-12 mtr depth Cum

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Note : Add Rs 26.00 per cum for every additional 3 Mtr. depth or part there off, for depth beyond 12 Mtr.

c Hard rock - Any rock or cement concrete or RCC, excavation of which require the use of mechanical plan

0-3 mtr depth Cum


3-6 mtr depth Cum
6-9 mtr depth Cum
9-12 mtr depth Cum
Note : Add Rs 153.00 per cum for every additional 3 Mtr. depth or part there off, For depth beyond 12 Mt

Additional Dewatering charges for open wells and Jackwells shall be paid as under:
a) Upto 12 m depth in any kind of strata, 20% of the normal rate.
b) Beyond 12 m depth but upto 18 mtr depth 25% of the normal rate.
c) Beyond 18 m depth 30% of the normal rate.

d) When the overnight recuperation exceeds one Metre depth, a rate analysis may be worked out based
actual observations and got approved by C.E.
3 (a) Providing and constructing II Sort, coursed/size stone masonry for circular wells with granite, trap or
other approved stone in C.M. 1:6 with 20 to 28 cms. high courses, and bond stones at 2m. apart in e
course, with radial construction with all lead & lift for all materials, for steining and parapet,includ
scaffolfing, curing, etc., complete with both sides size stone facing.

1) 0 to 2 Mtr. Depth Cum


2) 2 to 4 Mtr. Depth Cum
3) 4 to 6 Mtr. Depth Cum
4) 6 to 8 Mtr. Depth Cum
Note : Add Rs 404.00 per cum. for every additional 2 Mtr. depth or part there off,for depth beyond 8 Mtr.

(b) Providing and constructing II Sort, coursed/size stone, dry masonry for circular wells with granite, tra
any other approved stone, with 20 to 28 cms. high courses and bond stones at 2m. apart in each course, w
radial construction with all lead & lift. for all materials, Scaffolding etc., complete with both sides size s
facing.

1) 0 to 2 Mtr. Depth Cum


2) 2 to 4 Mtr. Depth Cum
3) 4 to 6 Mtr. Depth Cum
4) 6 to 8 Mtr. Depth Cum
Note : For depth beyond 8 Mtr., add Rs. 202.00 per cum. for every additional 2 Mtr. depth or part there of
4 Providing pointing to stone masonry in C.M. 1:3 proportion Sqm
including racking of joints 2.5cms. deep scaffolding curing with
all lead & lift for all materials.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Note : A weightage of 8% over the normal rate may be paid, if dewatering is essential for carrying out
work under item No. 3 and 4.

5 Filling alround the well behind steining with available excavated rubble or earth (obtained from the
excavation) including providing and laying necessary graded filter media (6mm to 40 mm. size alround
weep holes) as directed and hand packing wherever necessary without causing damage to well steining w
all lead and lift etc., complete.

1) Labour charges for back filling. Cum

2) Charges for providing and laying filter media alround weep Each
hole, (with 6mm. to 40mm graded metal 0.25 Cum. per weep
hole).
2. Conneting Pipe line
6 Earth work excavation Specifications and rates as per pipe
Excavation works
Note: Additional dewatering charges for connecting main shall be paid as under

1) Upto 12 Mtr. Depth in any kind of strata 30% of the normal rate.

2) Beyond 12 m. depth 35% of the normal rate.


7 Labour charges for laying following filter media in all depth as per specifications in infiltration gallery w
including cleaning, screening and placing it under water with all lead & lift to the point of laying
complete.
1) Graded Granite/Trap/Basalt/Metal from 6mm to 40mm size Cum
2) -do- coursed sand passing through a sieve of 4 meshes 2.5 cms. Cum
and retained on a sieve of 10 meshes to 2.5 cms. and filling it
under water and coursed sand passing through a sieve of 10
meshes to 2.5 cms. and retained on 20 meshes to 2.5 cms. and
filling it under water.

8 Collecting and stacking the following filter media at the site of Cum
work with all lead & lift 6mm., 10mm., 12mm., 20mm., 40mm.,
size
9 Providing and laying porous pipes made out of cement jelly 1:4 proportion as per I.S.4350:1967 in nala
for infiltration gallery including curing etc., shifting to the site lowering into trenches carefully aligning
complete with all lead & lift for all materials

1) 0 to 6 mtr mtr depth


1) 300 mm Rmtr
2) 375 mm Rmtr
3) 450 mm Rmtr
4) 525 mm Rmtr
5) 600 mm Rmtr
6) 750 mm Rmtr

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


7) 900 mm Rmtr
2) 6 to 12 mtr depth
1) 300 mm Rmtr
2) 375 mm Rmtr
3) 450 mm Rmtr
4) 525 mm Rmtr
5) 600 mm Rmtr
6) 750 mm Rmtr
7) 900 mm Rmtr
3) 12 to 18 mtr depth
1) 300 mm Rmtr
2) 375 mm Rmtr
3) 450 mm Rmtr
4) 525 mm Rmtr
5) 600 mm Rmtr
6) 750 mm Rmtr
7) 900 mm Rmtr
4) 18 to 24 mtr depth
1) 300 mm Rmtr
2) 375 mm Rmtr
3) 450 mm Rmtr
4) 525 mm Rmtr
5) 600 mm Rmtr
6) 750 mm Rmtr
7) 900 mm Rmtr
Note: 1) A weightage of 8% over the normal rate for the quantity of work done in watery situation may
allowed towards dewatering charges.

2) If moulds are supplied by the Board, necessary hire charges will be levied on the contractor.

3. Well Sinking

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


10 (a) Providing, fabricating, welding and setting out M.S. cutting M.Ton
edges using M.S. angles and plates of appropriate size (for RCC
well curb) with stiffners, holes to fix M.S. Rounds 18 to 20 mm
dia, with nuts and washers including cutting and threading
wherever required providing and welding or fixing fishplates with
bolts, nuts and washers etc. as per approved design including
clearing of site for the work with all lead etc., complete.

(b) -do- Labour charges only M.Ton

11 Fabricating Mild Steel or Tor Steel Bars of any size including M.Ton
conveying of steel to work site with all lead including cleaning,
straightening or bending placing in position tieing as per design
including cost of binding wire, hoisting if any etc. (excluding cost
of steel)

12 (a) Providing and laying Vibrated M30 design mix using 20mm Cum
and down size of approved gradation hard granite, trap or basalt
broken metal including weigh batch plant mixing, shoring,
strutting, plywood/steel form work, curing etc., complete with all
lead for all materials, for well curb or RCC cutting edge
(Cement @ 400 Kgs).

(b) -do- for RCC steining below ground level. Cum


(c) -do- for R.C.C steining above ground level upto 3.50M height. Cum

Note: For additional lift charges beyond 3.50 Mtr height, see additional lift charges page.

13 Providing and constructing C.R. II Sort or size stone steining in Cum


C.M. 1:5 with Granite/Trap/Basalt stones 20 to 28 cms. height
with Bond stones at 2m apart in each course with radial
construction with one side khandki or size stone facing if
necessary including two line dressing for all quoins of 5 cms.
wide, fixing of dowel bars with all lead & lift, for all materials,
curing scaffolding etc, complete.

14 Providing and laying vibrated cement concrete 1:1½:3 proportion Cum


machine mixed for bottom plug using 25% quick setting cement
20 mm and down size hard granite/trap/basalt broken metal
including machine mixing cost and conveyance of all materials,
machinery, labour, tamping, curing etc complete with a lead &
lift.
Note : A weightage of 8% over the normal rate for the quantity of work done in watery situation dewate
charges may be allowed for item No. 10, 11, 12, 13, 14.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


15 Sinking of wells as per approved design in all kinds of soils and soil mixed with boulders upto 30 cms,
(excluding hard rock requiring blasting) including dewatering application of kentledge for alround seatin
wells, removal of boulders, burried timbers, trunks, fossils, including depositing the excavated stuf
directed with necessary shoring and strutting etc., complete as per specification with all lead & lift (R
bunds and coffer dams are to be provided wherever required and to be paid for as per actuals)

i Upto 7.5 m Depth


1) 1.8 Mtr Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth
4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
ii Below 7.5 and Upto 9 m Depth
1) 1.8 Mtr Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth
4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
iii Below 9 and Upto 10.5 m Depth
1) 1.8 Mtr Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth
4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
iv Below 10.5 and Upto 12 m Depth
1)1.8 Mtr Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
v Below 12 and Upto 13.5 m Depth
1) 1.8 Mtr Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth
4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
vi Below 13.5 and Upto 15 m Depth
1) 1.8 Mtr. Per Rmtr depth
2) 2.5 Mtr Per Rmtr depth
3) 2.75 Mtr Per Rmtr depth
4) 3 Mtr Per Rmtr depth
5) 3.5 Mtr Per Rmtr depth
6) 4 Mtr Per Rmtr depth
7) 4.5 Mtr Per Rmtr depth
8) 5 Mtr Per Rmtr depth
Note:1) Beyond 15 m depth add 15% of the earlier rate for every additional 1.50 m depth of part thereof
2) The rates for sinking of wells of other diameters beyond 5 mtr. Dia may be worked out in the ratio of
inner area of that well to the inner area of 5 mtr dia well.

3) Delifting charges for masonry and concrete items: 50 % of lift charges is applicable.
4) When the overnight recuperation exceeds one Metre depth, a rate analysis may be worked out based
actual observations and got approved by C.E.
4. Bore Wells
1
(i)Sinking Borewells
(ii) fixing hand pump
Respective Panchayat Raj Enginee
(iii) Dismantling Hand Pump
circle Schedule of Rates is to be adopte
(iv) Reboring Drilled Bore well
(v) Bore Well Platform
2 Insertion or removal of casing pipes of 150mm dia including Mtr
welding, cutting, threading, handling charges etc., complete.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


LL SINKING, BORE WELL)

Rate
(in Rs.)

weightage of 25% is applicable


main, Intake well, Switch gear
ck and RCC supports at Head

s as may be necessary for intake


ing water during excavation and
d or Island after completion of

555.00
1101.00
1651.00

ns as per drawing and technical


cading, danger lighting, bracing,
ling the bottom of trench to the
tc., complete

87.00
99.00
114.00
131.00
off, for depth beyond 12 Mtr.

ck, conglomerate or other soft or


rs which do not require blasting
the surface or embedded in river

116.00
133.00
153.00
175.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


off, for depth beyond 12 Mtr.

re the use of mechanical plant.

677.00
778.00
894.00
1027.00
off, For depth beyond 12 Mtr.

under:

sis may be worked out based on

ar wells with granite, trap or any


ond stones at 2m. apart in each
r steining and parapet,including

3133.00
3340.00
3922.00
4170.00
e off,for depth beyond 8 Mtr.

ircular wells with granite, trap or


at 2m. apart in each course, with
mplete with both sides size stone

1703.00
1911.00
2118.00
2326.00
l 2 Mtr. depth or part there off.
180.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


is essential for carrying out the

or earth (obtained from the well


6mm to 40 mm. size alround the
ng damage to well steining with

62.00

351.00

ions and rates as per pipeline


n works
der

tions in infiltration gallery works


lift to the point of laying etc.,

570.00
622.00

1135.00

as per I.S.4350:1967 in nala bed


o trenches carefully aligning etc.,

1601.00
1673.00
2236.00
2952.00
3343.00
4059.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


4141.00

2036.00
2255.00
2962.00
3823.00
4214.00
5076.00
5158.00

2182.00
2400.00
3107.00
3969.00
4359.00
5221.00
5303.00

2327.00
2546.00
3253.00
4114.00
4505.00
5367.00
5448.00
done in watery situation may be

on the contractor.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


82237.00

24010.00

9451.00

10626.00

9850.00
9942.00

harges page.

3336.00

6635.00

ne in watery situation dewatering

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


with boulders upto 30 cms, size
kentledge for alround seating of
epositing the excavated stuff as
cation with all lead & lift (Ring
or as per actuals)

1952.00
2968.00
3414.00
4420.00
5253.00
6592.00
7996.00
9841.00

2245.00
3413.00
3927.00
5084.00
6041.00
7581.00
9195.00
11317.00

2582.00
3925.00
4516.00
5846.00
6947.00
8718.00
10574.00
13015.00

2969.00
4514.00
5193.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


6723.00
7990.00
10026.00
12161.00
14967.00

3414.00
5191.00
5972.00
7732.00
9188.00
11530.00
14230.00
17212.00

3927.00
5969.00
6868.00
8892.00
10566.00
13260.00
16082.00
19794.00
1.50 m depth of part thereof
be worked out in the ratio of the

pplicable.
sis may be worked out based on

e Panchayat Raj Engineering


edule of Rates is to be adopted

178.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


PART V- UGD WORKS
Specification Unit

Supply, laying and jointing of Stone Ware pipes

1 Supply & Laying of SWG pipes with Hemp yarn and jointing with CM 1:11/2 - DELETED.
2 Supplying, lowering, laying, fixing, testing and commissioning S.W. junction pipes, conforming to
651:1992 with latest amendements, of following sizes including conveying to worksite and caulking w
hemp dipped in tar cement and jointing with C.M. 1:1½ perfect linking curing for 10 days, and testing w
water, with all lead and lift including cost of jointing materials etc., complete. (contractor will make
own arrangements for procuring water for testing).

Cost of lowering,
Cost of Junction laying, jointing &
Sl.No. Particulars of Pipe Pipe per each (in perfect linking per
Rs.) each.
( in Rs.)
1) 150 mm x 100 mm. dia 254.00 308.00
2) 200 mm x 100 mm. dia 336.00 438.00
3) 250 mm x 100 mm. dia 490.00 555.00

3 Supplying, lowering, laying, jointing, testing and commissioning glazed stoneware pipes conforming t
651:1992 with latest amendements, in all respects jointing with EPDM rubber rings (seals according to
681 & ASPM 425). Rubber seals joints, pipe will have groves in interior of sockets and exterior of
spigots. The rubber gaskets shall be prefixed at the factory by the manufacturer rigidly with approved g
to have leak proof joints includeing conveying of pipe to worksite and rolling and lowering into trenc
into, laying true to line, level and perfect linking at joints, testing and commissioning, including load
and unloading at both destinations and cuts of pipes wherever necessary including jointing of GSW p
and specials, with rubber gaskets conforming to EN 681 and ASTM C - 425 including cleaning the so
and spigot with soap solutions and applying talcum powder for detecting then applying glue and be
inserting of rubber gaskets, jacking and fixing in perfect condition including the cost of soap solut
talcum powder and glue etc., and giving necessary hydrualic test to the required pressure of water h
with all lead and lifts including costing of jointing of materials and disposal fo debris as directed
complete (Contractor will make his own arrangements for procuring for testing)

1) 150 mm dia Mtr


2) 200 mm dia Mtr
3) 250 mm dia Mtr

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


4 Supplying Unplasticised PVC pipes conforming to IS 15328:2003 with latest amendments ended w
integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru
line and level and perfect linking at joints, testing and commissioning, including loading and unloadin
both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cos
elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with
labour, with all lead & lift including encasing the pipe alround to a depth of not less than 15cms with
gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic tes
the required pressure as per ISS (contractor will make his own arrangements for procuring water
testing).

a Supply & laying of PVC - U Pipes as per IS 15328 SN 4 - Ring tite:


160 mm dia RMtr 291.00 91.00
200 mm dia RMtr 447.00 108.00
250 mm dia RMtr 703.00 113.00
315 mm dia RMtr 1115.00 137.00

b Supply & laying of PVC - U Pipes as per IS 15328 SN 8 - Ring tite:


110 mm dia RMtr 162.00 81.00
160 mm dia RMtr 343.00 91.00
200 mm dia RMtr 533.00 108.00
250 mm dia RMtr 827.00 113.00
315 mm dia RMtr 1328.00 137.00

5 Supplying of Class SN 8 Double wall corrugated (external annual corrugated & smooth internal w
(DWC) piping system with integral socket as per IS16098 with latest amendments and conveying
worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at jo
testing and commissioning, including loading and unloading at both destinations and cuts of p
wherever necessary including jointing with all labour, all lead & lift including encasing the pipe alroun
a depth of not less than 15cms with soft gravel or selected earth available from the excavation
complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make
own arrangements for procuring water for testing).

ID
1) 100 mm dia Rmtr 203.00 52.00
2) 135 mm dia Rmtr 282.00 55.00
3) 150 mm dia Rmtr 282.00 66.00
4) 170 mm dia Rmtr 406.00 69.00
5) 200 mm dia Rmtr 356.00 69.00
6) 250 mm dia Rmtr 551.00 89.00
7) 300 mm dia Rmtr 754.00 119.00
8) 400 mm dia Rmtr 1310.00 119.00
9) 500 mm dia Rmtr 1975.00 188.00
10) 600 mm dia Rmtr 2947.00 191.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


6 Supplying UPVC FOAM CORE pipes conforming to IS 16098 P-I 2013 with latest amendments en
with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, lay
true to line and level and perfect linking at joints, testing and commissioning, including loading
unloading at both destinations and cuts of pipes whereever necessary including jointing of UPVC p
(wih cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of appro
type with all labour, lead and lifts, including encasing the pipes alround to a depth of not less than 15
with soft gravel or selected earth available from the excavation etc., complete and giving neces
hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements fro procu
water for testing) etc.,

SN4 - Ring Fit - 160mm dia Rmtr


SN8 - Ring Fit - 160 mm dia Rmtr
SN - 4 Self Fit
160mm dia Rmtr
200 mm dia Rmtr
250 mm dia Rmtr
315mm dia Rmtr
SN - 8 Self Fit
160mm dia Rmtr
200 mm dia Rmtr
250 mm dia Rmtr
315mm dia Rmtr

7 Providing, laying, supply, jointing materials, jointiing and testing byt excluding excavation and b
fillings etc., for Oriented Poly Vinyl Chloride pipes or O-PVC pipes of highest Orientation Class 500 w
homogeneous SPIGOT including supply of elastomeric sealing ring manufactured as per IS16647 - 2
and the eslastomeric sealing ring gasket conforming to EN 681-1 with latest amendments.
manufacturing, testing at factory, supply, transportation, handling, stacking, installation, jointing
testing at sites shall comply with all applicable standards (ISO 16422-2014 with latest amendments).

PN - 16 with elastomeric
fittings
110 mm dia Rmtr
160 mm dia Rmtr
200 mm dia Rmtr
250 mm dia Rmtr
315 mm dia Rmtr
400 mm dia Rmtr
PN - 25 with elastomeric
fittings
110 mm dia Rmtr
160 mm dia Rmtr
200 mm dia Rmtr
250 mm dia Rmtr
315 mm dia Rmtr
400 mm dia Rmtr

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


8 Providing PVC-U INDIVIDUAL U.G.D House service connection (which shall be laid from inside
customer proterty ) which includes:

(a) providing and fixing the PE Inspection chambres of 315 mm dia 0.42 m depth .
(b) civil works like Earthwork excavation for the pipeline trenches for laying of PVC-U pipes for the ho
connections in all types of soils , disintegrated rock,soft rock, hard rock, including cutting of any r
using , crossing drains, compound, Dismantling of existing structures like culverts, bridges, retaining w
and other structure comprising of masonry, c.c. wood work, steel work, including T & P and scaffold
wherever necessary sorting the dismantled material, disposal of unserviceable and stacking the service
material with all lifts and lead , restoring the damaged portions inside or outside the property premis
refilling the portions of trenches that are dug open including linking to existing sewer network
complete.

110 mm dia Nos

9 Providing, supplying and fixing in position of High density poly ethylene manhole of 1200 mm inte
diameter for all depths with top opening of 600mm, PE manhole chambers shall be on the basis
EN13598-2:9009 shall meet relevant BIS/ASTM standards and specifications. All chambers shall be
solid single wall 100mm or greater thickness construction made of 100% virgin PE material with
recycling or foam content. All chambers shall come with a prefabricated integrated base with apprpr
benching with a gredient of 1-2%. The manholes shall be seated on M10 cement concrete (1:3:6
200mm depth. The inlet pipes to be connected with elastomer seal for a flexible connection of p
according to EN 681-1. The manhole shall have straight channel DN 200 with four extra inlets
200/160/110, 45o and 90o right and left and drop arrangement if required and Outlet DN 200/160/
including steps. The manholes shall also be designed to receive house connection at shaft level as
requirement. In case the system is made of midular parts then triple safety (three sided lip/element)
according to standard practices to be used to connect the parts. Manholes shall have corrossion resista
steps vertical step distance 25 cms in order to safe guard against uplift pressure, manhole should have s
horizontal re-inforcement ribs of appropriate thickness and width. These ribs should be stratagically pla
at regular intervals all along the outside of the shaft of the manhole. During installation, special care m
be taken to ensure proper compaction of the excavated earth with proctar density of 95%, below
around the manhole, suitably anchored over concrete to take traffic load without settlement.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Rates for supply of HDPE manholes shall be inclusive of all duties, carriage, unloading, stacking at st
VAT / Sales tax or/ and any other levies. Rates include 2 numbers inlet seal of appropriate pipe diamete
per standard practices and also inclusive of excavation with dewatering if necessary, back filling etc.,
supply & installation of manhole frame and covers etc., complete.

Sewage Chambers DN
1200 mm
1) upto 1.0 mtr depth Nos
2) 1.0 - 2.0 mtr depth Nos
3) 2.0 - 3.0 mtr depth Nos
4) 3.0 - 4.0 mtr depth Nos
5) 4.0 - 5.0 mtr depth Nos
6) 5.0 - 6.0 mtr depth Nos

Manhole Chambers
10 Providing and constructing of Manhole chambers conical in shape at top with CC 1:3:6 foundation u
40mm and down size graded metal of approved quality and with an offset of 0.15 Mtr. alround the cham
and brick masonry in C.M. 1:4 plaster with bricks of approved quality and CM plaster 1:3 propor
12mm thick inside and outside except for the conical surface outside where the thickness of plaster shal
20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing
pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SF
manhole frame and cover conforming to IS 12592 (Part-I): 1988 & IS 12592 (Part-II):1991 with lat
amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as direc
watering, curing, barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shor
strutting, dewatering, engraving Manhole No. on the inner conical surface etc. as per the drawing with
lead and lift for various diameters and depths noted below.

Sl.No. Cost of Each manhole Cost of each


excluding frame Medium duty SFRC Cost of plastic foot
Particulars of Manholes ,cover and plastic foot manhole frame and steps
steps cover ( in Rs.)
( in Rs.) (in Rs.)
10.1 -do- with table moulded bricks of approved quality and medium duty SFRC manhole frame and cover
1.20 Mtr. dia.

1) For 1.0 mtr depth 17679.00 998.00 198.00


2) For 2.0 mtr depth 28843.00 998.00 495.00
3) For 3.0 mtr depth 42817.00 998.00 891.00
4) For 4.0 mtr depth 58350.00 998.00 1188.00
5) For 5.0 mtr depth 80900.00 998.00 1485.00
6) For 6.0 mtr depth 100183.00 998.00 1782.00
7) For 7.0 mtr depth 124941.00 998.00 2079.00
8) For 8.0 mtr depth 149182.00 998.00 2376.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


10.2 -do- with laterite bricks of approved quality and medium duty SFRC manhole frame and cover for 1
Mtr. dia.
1) For 1.0 mtr depth 15386.00 998.00 198.00
2) For 2.0 mtr depth 23929.00 998.00 495.00
3) For 3.0 mtr depth 34628.00 998.00 891.00
4) For 4.0 mtr depth 46866.00 998.00 1188.00
5) For 5.0 mtr depth 64599.00 998.00 1485.00
6) For 6.0 mtr depth 79258.00 998.00 1782.00
7) For 7.0 mtr depth 97887.00 998.00 2079.00
8) For 8.0 mtr depth 116000.00 998.00 2376.00
10.3 -do- with table moulded bricks of approved quality and medium duty SFRC manhole frame and cover
1.50 Mtr. dia.

1) For 1.0 mtr depth 21294.00 998.00 198.00


2) For 2.0 mtr depth 36286.00 998.00 495.00
3) For 3.0 mtr depth 53153.00 998.00 891.00
4) For 4.0 mtr depth 73927.00 998.00 1188.00
5) For 5.0 mtr depth 100765.00 998.00 1485.00
6) For 6.0 mtr depth 122898.00 998.00 1782.00
7) For 7.0 mtr depth 151735.00 998.00 2079.00
8) For 8.0 mtr depth 180054.00 998.00 2376.00
10.4 -do- with laterite bricks of approved quality and medium duty SFRC manhole frame and cover for 1
Mtr. dia.
1) For 1.0 mtr depth 18500.00 998.00 198.00
2) For 2.0 mtr depth 30005.00 998.00 495.00
3) For 3.0 mtr depth 43329.00 998.00 891.00
4) For 4.0 mtr depth 59089.00 998.00 1188.00
5) For 5.0 mtr depth 79666.00 998.00 1485.00
6) For 6.0 mtr depth 96346.00 998.00 1782.00
7) For 7.0 mtr depth 118014.00 998.00 2079.00
8) For 8.0 mtr depth 139166.00 998.00 2376.00
10.5 -do- with table moulded bricks of approved quality and medium duty SFRC manhole frame and cover
1.80 Mtr. dia.
1) For 1.0 mtr depth 25119.00 998.00 198.00
2) For 2.0 mtr depth 45045.00 998.00 495.00
3) For 3.0 mtr depth 61461.00 998.00 891.00
4) For 4.0 mtr depth 79543.00 998.00 1188.00
5) For 5.0 mtr depth 103408.00 998.00 1485.00
6) For 6.0 mtr depth 128877.00 998.00 1782.00
7) For 7.0 mtr depth 161792.00 998.00 2079.00
8) For 8.0 mtr depth 191951.00 998.00 2376.00
10.6 -do- with laterite bricks of approved quality and medium duty SFRC manhole frame and cover for 1
Mtr. dia.
1) For 1.0 mtr depth 22264.00 998.00 198.00
2) For 2.0 mtr depth 37106.00 998.00 495.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


3) For 3.0 mtr depth 49669.00 998.00 891.00
4) For 4.0 mtr depth 63896.00 998.00 1188.00
5) For 5.0 mtr depth 82291.00 998.00 1485.00
6) For 6.0 mtr depth 101476.00 998.00 1782.00
7) For 7.0 mtr depth 126183.00 998.00 2079.00
8) For 8.0 mtr depth 148133.00 998.00 2376.00
11.1 -do- with table moulded bricks of approved quality and heavy duty SFRC manhole frame and cover
1.20 Mtr. dia.
1) For 1.0 mtr depth 17679.00 1476.00 198.00
2) For 2.0 mtr depth 28843.00 1476.00 495.00
3) For 3.0 mtr depth 42817.00 1476.00 891.00
4) For 4.0 mtr depth 58350.00 1476.00 1188.00
5) For 5.0 mtr depth 80900.00 1476.00 1485.00
6) For 6.0 mtr depth 100183.00 1476.00 1782.00
7) For 7.0 mtr depth 124941.00 1476.00 2079.00
8) For 8.0 mtr depth 149182.00 1476.00 2376.00
11.2 -do- with laterite bricks of approved quality and heavy duty SFRC manhole frame and cover for 1.20
dia.

1) For 1.0 mtr depth 15386.00 1476.00 198.00


2) For 2.0 mtr depth 23929.00 1476.00 495.00
3) For 3.0 mtr depth 34628.00 1476.00 891.00
4) For 4.0 mtr depth 46866.00 1476.00 1188.00
5) For 5.0 mtr depth 64599.00 1476.00 1485.00
6) For 6.0 mtr depth 79258.00 1476.00 1782.00
7) For 7.0 mtr depth 97887.00 1476.00 2079.00
8) For 8.0 mtr depth 116000.00 1476.00 2376.00
11.3 -do- with table moulded bricks of approved quality and heavy duty SFRC manhole frame and cover
1.50 Mtr. dia.

1) For 1.0 mtr depth 21294.00 1476.00 198.00


2) For 2.0 mtr depth 36286.00 1476.00 495.00
3) For 3.0 mtr depth 53153.00 1476.00 891.00
4) For 4.0 mtr depth 73927.00 1476.00 1188.00
5) For 5.0 mtr depth 100765.00 1476.00 1485.00
6) For 6.0 mtr depth 122898.00 1476.00 1782.00
7) For 7.0 mtr depth 151735.00 1476.00 2079.00
8) For 8.0 mtr depth 180054.00 1476.00 2376.00
11.4 -do- with laterite bricks of approved quality and heavy duty SFRC manhole frame and cover for 1.50 M
dia.
1) For 1.0 mtr depth 18500.00 1476.00 198.00
2) For 2.0 mtr depth 30005.00 1476.00 495.00
3) For 3.0 mtr depth 43329.00 1476.00 891.00
4) For 4.0 mtr depth 59089.00 1476.00 1188.00
5) For 5.0 mtr depth 79666.00 1476.00 1485.00
6) For 6.0 mtr depth 96346.00 1476.00 1782.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


7) For 7.0 mtr depth 118014.00 1476.00 2079.00
8) For 8.0 mtr depth 139166.00 1476.00 2376.00
11.5 -do- with table moulded bricks of approved quality and heavy duty SFRC manhole frame and cover
1.80 Mtr. dia.
1) For 1.0 mtr depth 25119.00 1476.00 198.00
2) For 2.0 mtr depth 45045.00 1476.00 495.00
3) For 3.0 mtr depth 61461.00 1476.00 891.00
4) For 4.0 mtr depth 79543.00 1476.00 1188.00
5) For 5.0 mtr depth 103408.00 1476.00 1485.00
6) For 6.0 mtr depth 128877.00 1476.00 1782.00
7) For 7.0 mtr depth 161792.00 1476.00 2079.00
8) For 8.0 mtr depth 191951.00 1476.00 2376.00
11.6 -do- with laterite bricks of approved quality and heavy duty SFRC manhole frame and cover for 1.80 M
dia.
1) For 1.0 mtr depth 22264.00 1476.00 198.00
2) For 2.0 mtr depth 37106.00 1476.00 495.00
3) For 3.0 mtr depth 49669.00 1476.00 891.00
4) For 4.0 mtr depth 63896.00 1476.00 1188.00
5) For 5.0 mtr depth 82291.00 1476.00 1485.00
6) For 6.0 mtr depth 101476.00 1476.00 1782.00
7) For 7.0 mtr depth 126183.00 1476.00 2079.00
8) For 8.0 mtr depth 148133.00 1476.00 2376.00
Note:1) For earth work excavation for manholes, the rate for excavation of pipe trenches is applicable.

2) Plastic foot steps rate @ Rs.99.00 is considered.


3) The rate of any fractional increase in the depth of the manhole on decimeter basis, shall be paid
adding the difference in rates between the immediately preceding and succeeding depths of such fractio
depth of manhole on linear basis:

For eg. To pay for 1.20 M depth manhole:


Rate for 1 M depth Manhole excluding manhole frame cover and plastic foot steps rate Rs.x

Rate for 2 M depth Manhole excluding manhole frame cover and plastic foot steps rate Rs.y
Therefore rate for 1.20 M depth Manhole
= Rs. X + (y-x / 1.00) x 0.20 + Manhole frame and cover rate + Plastic foot steps rate

13 Providing and fixing cast iron soil pipe for ventilating shaft 5 metres high with specials and cowl and w
suitable grips in C.C. 1:2:4 pillar using 10mm to 20mm graded hard granite/trap/basalt or any o
approved metal with 15 cms thick C.C. around upto 1.22 meters above the G.L. and with a foundation b
of 90x90x90 cms plastered with 12mm thick CM 1:3 to all exposed faces and linking the shaft to
manhole by means of 15 cms. dia. S.W. pipes and specials, jointing, with tar dipped hemp 1:1½ C
caulking, curing, with all lead & lifts. for all materials earth work excavation and refilling in all strata,
disposal of surplus earth as directed with all lead and lifts, etc. complete.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


1) With 150 mm. dia shaft Each

2) With 100 mm. dia shaft Each

14 Providing and constructing flushing tank of 900 liters capacity with 1.80mx0.90mx0.65m internal size o
bed of CC 1:2:4 of dimensions 2.4m x 2.4m x 0.15m using 10mm to 20 mm graded aggregate of appro
quality with 34 cms. B.B. masonry in C.M. 1:3, providing and fixing specified cover slab, 15 cms. th
providing and laying 25mm dia G.I. inlet and outlet connections with pipes and specials of approved m
and class, providing and fixing C.I. syphon set of approved make and design in C.M. 1:3 and excavatio
all strata (Wherever necessary) including hard rock by chistelling, giving necessary hydraulic test, with
lead for all materials, curing and disposing off the surplus earth etc., complete.

-1 1) With 1:2:4 R.C.C. covering slab (precast) Each


2) With B.S. slab 15cms. thick two line dressed and fixed in C.M. Each
1:6
3) With 1:2:4 R.C.C. covering slab excluding cost of syphon set. Each
4) With B.S. slab 15 cms. thick two line dressed and fixed in C.M. Each
1:6
excluding cost of syphon set.

(2) 1) -do- Flushing tank of 1400 liters capacity (other details as per Each
item No. 10) with 1:2:4 R.C.C. covering slab (precast)

2) With B.S. slab 15 cms. thick two line dressed and fixed in C.M. Each
1:6
3) With 1:2:4 R.C.C. covering slab excluding cost of syphonset. Each

4) With B.S. slab 15 cms. thick two line dressed and fixed in C.M. Each
1:6 excluding cost of syphon set heavy duty

15 Construction of sylk pattern drains with new B.S. check slabs 7.5cms. thick including all lead. laid ov
bed of 1:3:6 cement concrete 15 cms, thick including moulding drain in C.C. 1:2:4 with a minim
thickness of 3.75 cms. at the invert and plastered with C.M. 1:3 proportion 1.25 cms. thick curing fo
days including earth work excavation in all soils upto disintigrated rock or soft rock (inclusive) form
sides of drain and other details as per KPWD Hand Book Vol 1 page 266

1) 7.5 cms. Section as per drawings in hand book Rmtr


2) 10 cms. (1) section Rmtr
3) 10 cms. (2) section Rmtr
4) 12.5 cms. (1) section Rmtr
5) 12.5 cms. (2) section Rmtr
6) 15 cms. (2) section Rmtr
7) 15 cms. (3) section Rmtr
8) 17.5 cms. (2) section Rmtr

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


16 Supply and erection of 2.50 mtrs. height ready made latrins/ pumphouse/water cisterns includ
conveying the same carefully to work spot, loading and unloading at both destinations with all lead and
etc. complete.

1) -do- 900 mm dia Each


2) -do- 1200 mm dia Each
17 Supplying to work spot rolling, lowering and placing in position RCC perforated rings in the alre
excavated pit including loading and unloading at both the destinations with all lead and lift etc., comple

1) 900mm x 1100 mm Each


2) 1200mm x 1250 mm Each

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


Rate
(in Rs.)

- DELETED.
on pipes, conforming to IS
worksite and caulking with
for 10 days, and testing with
e. (contractor will make his

Total

562.00
774.00
1045.00

ware pipes conforming to IS


rings (seals according to EN
sockets and exterior of the
r rigidly with approved glue
g and lowering into trenches
issioning, including loading
uding jointing of GSW pipes
ncluding cleaning the socket
en applying glue and before
g the cost of soap solution,
uired pressure of water head
al fo debris as directed etc.,
)

341.00
415.00
489.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


est amendments ended with
into trenches, laying true to
ng loading and unloading at
f UPVC pipes (with cost of
ng of approved type, with all
ot less than 15cms with soft
g necessary hydraulic test to
nts for procuring water for

382.00
555.00
816.00
1252.00

243.00
434.00
641.00
940.00
1465.00

ed & smooth internal wall)


endments and conveying to
nd perfect linking at joints,
inations and cuts of pipes
encasing the pipe alround to
le from the excavation etc.
SS (contractor will make his

255.00
337.00
348.00
475.00
425.00
640.00
873.00
1429.00
2163.00
3138.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


th latest amendments ended
wering into trenches, laying
ning, including loading and
ing jointing of UPVC pipes
s) with jointing of approved
depth of not less than 15cms
plete and giving necessary
n arrangements fro procuring

486.00
560.00

494.00
730.00
1124.00
1753.00

568.00
859.00
1288.00
2056.00

uding excavation and back


t Orientation Class 500 with
tured as per IS16647 - 2017
h latest amendments. The
g, installation, jointing and
h latest amendments).

894.00
1252.00
1674.00
2307.00
3075.00
4448.00

927.00
1367.00
1850.00
2489.00
3256.00
4874.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


shall be laid from inside the

epth .
f PVC-U pipes for the house
cluding cutting of any road
erts, bridges, retaining walls
ding T & P and scaffolding
and stacking the serviceable
side the property premises,
existing sewer network etc.

7025.00

anhole of 1200 mm internal


rs shall be on the basis of
. All chambers shall be of a
virgin PE material without
egrated base with apprpriate
cement concrete (1:3:6) of
lexible connection of pipes
with four extra inlets DN
and Outlet DN 200/160/110
nection at shaft level as per
three sided lip/element) seal
ll have corrossion resistance
e, manhole should have solid
hould be stratagically placed
nstallation, special care must
density of 95%, below and
ut settlement.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


unloading, stacking at store,
appropriate pipe diameter as
essary, back filling etc., and

19508.00
29058.00
46280.00
70494.00
84115.00
96089.00

h CC 1:3:6 foundation using


15 Mtr. alround the chamber
CM plaster 1:3 proportion
thickness of plaster shall be
nished smooth and fixing of
supplying and fixing SFRC
2 (Part-II):1991 with laterst
d at 30cms apart as directed,
d cover, cost of tar, shoring,
. as per the drawing with all

Total Cost per


each
(in Rs.)

manhole frame and cover for

18875.00
30336.00
44706.00
60536.00
83383.00
102963.00
128018.00
152556.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


le frame and cover for 1.20

16582.00
25422.00
36517.00
49052.00
67082.00
82038.00
100964.00
119374.00
manhole frame and cover for

22490.00
37779.00
55042.00
76113.00
103248.00
125678.00
154812.00
183428.00
le frame and cover for 1.50

19696.00
31498.00
45218.00
61275.00
82149.00
99126.00
121091.00
142540.00
manhole frame and cover for

26315.00
46538.00
63350.00
81729.00
105891.00
131657.00
164869.00
195325.00
le frame and cover for 1.80

23460.00
38599.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


51558.00
66082.00
84774.00
104256.00
129260.00
151507.00
manhole frame and cover for

19353.00
30814.00
45184.00
61014.00
83861.00
103441.00
128496.00
153034.00
ame and cover for 1.20 Mtr.

17060.00
25900.00
36995.00
49530.00
67560.00
82516.00
101442.00
119852.00
manhole frame and cover for

22968.00
38257.00
55520.00
76591.00
103726.00
126156.00
155290.00
183906.00
ame and cover for 1.50 Mtr.

20174.00
31976.00
45696.00
61753.00
82627.00
99604.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


121569.00
143018.00
manhole frame and cover for

26793.00
47016.00
63828.00
82207.00
106369.00
132135.00
165347.00
195803.00
ame and cover for 1.80 Mtr.

23938.00
39077.00
52036.00
66560.00
85252.00
104734.00
129738.00
151985.00
e trenches is applicable.

meter basis, shall be paid by


ing depths of such fractional

eps rate Rs.x

eps rate Rs.y

ps rate

h specials and cowl and with


nite/trap/basalt or any other
. and with a foundation base
and linking the shaft to the
ar dipped hemp 1:1½ C.M.
and refilling in all strata, and

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


26640.00

19970.00

0mx0.65m internal size on a


raded aggregate of approved
d cover slab, 15 cms. thick,
d specials of approved make
n C.M. 1:3 and excavation in
ssary hydraulic test, with all

41760.00
37061.00
34094.00
29353.00

38683.00

33088.00

30975.00

26234.00

ncluding all lead. laid over a


C.C. 1:2:4 with a minimum
.25 cms. thick curing for 10
oft rock (inclusive) forming

736.00
771.00
882.00
965.00
1042.00
1109.00
1219.00
1466.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


se/water cisterns including
nations with all lead and lift.

17936.00
23372.00
forated rings in the already
lead and lift etc., complete.

5859.00
8982.00

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


PART VI-ADDITIONAL LIFT CHARGES
(1) Additional lift charges for masonry works (Brick & Stone) beyond 3.5 mtr. upto 7 mtr.
is applicable at Rs. 92.00/- Cum where the floor height is above 3.5 mtr. for superstructure
of pump house / GLSR /Jackwell cum pump house etc., for heights above 7.0 mtr. or Part
thereoff, Rs. 92.00/- cum is applicable at 3.0 Mtr stages.

(2) Additional lift charges for concrete works (well steining etc.) beyond 3.5 mtr. upto 7.0
mtr. is applicable at Rs. 92.00/- cum where the floor height is above 3.5 mtr. for
Superstructure of pump house / GLSR / Jackwell cum pump house, Roof slab etc., for
heights above 7.0 mtr. or Part thereoff, Rs. 92.00/- cum is applicable at 3.0 mtr. stages.

Note:
1) The above lift charges are not applicable for providing doors, windowns and ventilators.
2) For pumphouse and GLSR, the height shall be measured from the floor of the
pumphouse/ GLSR , for considering the lift charges.
3) For jackwell cum pumphouse, the height shall be measured from the ground level for
considering the lift charges.
4) For GLSR with R.C.C steining , the lift charges shall be considered beyon 6 m . Only ,
as the rate in the S.R. is inclusive of lift charges upto 6 m.
5) No additional lift charges as per the respective PW,P & IWTD SR's, is admissible for
either laying of concrete or construction of masonry, as the same is included in the above
lift charges.

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


LEAD CHARGES

RATES FOR CONVEYANCE OF MATERIALS BY HEAD LOAD

Gravel where Rough stones, size


Earth, gravel,
stack stones, cut stones,
Sl. No. Description sand, lime, surki
measurements are laterite stones per
per cum
taken per cum cum
1 2 3 4 5

1 Beyond 50 m upto 100 m 20 25 31

2 Beyond 100 m upto 150m 32 40 49

3 Beyond 150 m upto 200m 43 54 68

4 Beyond 200 m upto 250 m 53 66 83

5 Beyond 250 m upto 300 m 67 84 105

"Approved"Chairman S.R. Committee and Chief Engineer,K.U.W.S. D.Board, Bengaluru


¸ÀgÀ§gÁdÄ ªÀÄvÀÄÛ M¼ÀZÀgÀAr ªÀÄAqÀ½

19 £Éà ¸Á°£À zÀgÀ¥ÀnÖ

Urban Water Supply and Drainage Board

Schedule of Rates 2018-19

Вам также может понравиться