Вы находитесь на странице: 1из 111

Steel Summary

CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)


S/no Description 3/8 1/2 5/8 3/4 1 Total

1 Basement Floor Foundation 2,586.95 4,775.44 340.24 7,702.62 Kg


2 Basemment Floor Lintel 171.62 396.32 567.94 Kg
Basemment Floor Slab &
3 Beams 1,749.77 2,415.90 683.26 4,848.93 Kg
4 Ground Floor Foundation 115.21 115.21 Kg
5 Septic Tank of B.F 142.36 117.59 259.95 Kg
6 Septic Tank of G.F 142.36 117.59 259.95 Kg
7 U.G.W. Tank 128.96 134.56 263.51 Kg
8 O.H.W. Tank 102.44 86.25 188.68 Kg
9 Rain Water Tank of B.F 135.10 100.62 235.72 Kg
10 Rain Water Tank of G.F 121.38 105.72 227.10 Kg
Ground Floor Lintel Beam &
11 Column 794.45 816.89 780.21 2,391.55 Kg
12 Ground Floor Slab & Beams 2,179.40 3,374.21 947.48 6,501.09 Kg
First Floor Lintel Beams &
13 Columns 611.69 944.75 249.95 1,806.39 Kg
14 First Floor Slab & Beams 1,917.69 4,221.49 746.01 6,885.19 Kg
15 Mummty Floor Slab & Beams 196.05 492.92 - 688.97 Kg
Sub-Total 10,980.21 18,215.46 - 3,747.15 - 32,942.82 Kg
Add 5% Waistage 1,647.14
Total 34,589.96 Kg
Total Amount Rs 2,905,557.05 Rs
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage
such overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

1 Septic Tank of B.F

Base

4'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
2 Distribution Bars #3 9'' 2 7 14 10.68 ' 149.520 9'-8"

Slab

4'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
2 Distribution Bars #3 9'' 2 7 14 10.68 ' 149.520 9'-8"

Horizontal Bars

9'-8"
6''
1 Long walls #3 9'' 2 7 14 10.68 ' 149.520

5'-8"
6''
2 Short walls #3 9'' 2 7 14 6.68 ' 93.520

Vertical Bars Page 2 of 111


BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Vertical Bars

5'-11"
6''
1 Long walls #4 6'' 2 18 36 6.93 ' 249.480

5'-11"
6''
2 Short walls #4 6'' 2 10 20 6.93 ' 138.600
Total Quantity = ( Rft ) 837.44 388.08 0.00 0.00
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS 0.260 Ton
Weight of Bars Dia Wise Kgs 142.36 117.59 0.00 0.00
Total Weight of Bars in Kgs 259.95

2 Septic Tank of G.F

Page 3 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Base

4'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
2 Distribution Bars #3 9'' 2 7 14 10.68 ' 149.520 9'-8"

Slab

4'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
2 Distribution Bars #3 9'' 2 7 14 10.68 ' 149.520 9'-8"

Horizontal Bars

9'-8"
6''
1 Long walls #3 9'' 2 7 14 10.68 ' 149.520

5'-8"
6''
2 Short walls #3 9'' 2 7 14 6.68 ' 93.520

Vertical Bars

5'-11"
6''
1 Long walls #4 6'' 2 18 36 6.93 ' 249.480

5'-11"
6''
2 Short walls #4 6'' 2 10 20 6.93 ' 138.600
Total Quantity = ( Rft ) 837.44 388.08 0.00 0.00
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS 0.260 Ton
Weight of Bars Dia Wise Kgs 142.36 117.59 0.00 0.00
Page 4 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
WEIGHT OF BARS DIA (C/C) Nos LENGTH #3 #4 #5 #6 0.260 Ton
Total Weight of Bars in Kgs 259.95

3 U.G.W. Tank

Base

5'-8"
6''
1 Main Bars #3 9'' 2 11 22 6.68 ' 146.960

6''
2 Distribution Bars #3 9'' 2 7 14 9.68 ' 135.520 8'-8"

Slab

5'-8"
6''
1 Main Bars #3 9'' 2 11 22 6.68 ' 146.960

6''
2 Distribution Bars #3 9'' 2 7 14 9.68 ' 135.520 8'-8"

Horizontal Bars

8'-8"
6''
1 Long walls #3 9'' 2 10 20 9.68 ' 193.600

5'-8"
6''
2 Short walls #3 9'' 10 0 6.68 ' -

Vertical Bars

6'-11"
6''
1 Long walls #4 6'' 2 16 32 7.93 ' 253.760
Page 5 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

6'-11"
6''
2 Short walls #4 6'' 2 12 24 7.93 ' 190.320
Total Quantity = ( Rft ) 758.56 444.08 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS 0.264 Ton
Weight of Bars Dia Wise Kgs 128.96 134.56 0.00 0.00
Total Weight of Bars in Kgs 263.51

4 O.H.W. Tank

Base

4'-8"
6''
1 Main Bars #3 9'' 2 10 20 5.68 ' 113.600

Page 6 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

6''
2 Distribution Bars #3 9'' 2 7 14 7.68 ' 107.520 6'-8"

Slab

4'-8"
6''
1 Main Bars #3 9'' 2 10 20 5.68 ' 113.600

6''
2 Distribution Bars #3 9'' 2 7 14 7.68 ' 107.520 6'-8"

Horizontal Bars

6'-8"
6''
1 Long walls #3 9'' 2 6 12 7.68 ' 92.160

4'-8"
6''
2 Short walls #3 9'' 2 6 12 5.68 ' 68.160

Vertical Bars

4'-11"
6''
1 Long walls #4 6'' 2 14 28 5.93 ' 166.040

4'-11"
6''
2 Short walls #4 6'' 2 10 20 5.93 ' 118.600
Total Quantity = ( Rft ) 602.56 284.64 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS 0.189 Ton
Weight of Bars Dia Wise Kgs 102.44 86.25 0.00 0.00
Total Weight of Bars in Kgs 188.68
Rain Water Tank of
5 B.F

Base Page 7 of 111


BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Base

3'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
2 Distribution Bars #3 9'' 2 6 12 10.68 ' 128.160 9'-8"

Slab

3'-8"
6''
1 Main Bars #3 9'' 2 13 26 5.68 ' 147.680

6''
1 Distribution Bars #3 9'' 2 6 12 10.68 ' 128.160 9'-8"

Horizontal Bars

9'-8"
6''
1 Long walls #3 9'' 2 7 14 10.68 ' 149.520

5'-8"
6''
2 Short walls #3 9'' 2 7 14 6.68 ' 93.520

Vertical Bars

4'-11"
6''
1 Long walls #4 6'' 2 18 36 5.93 ' 213.480

4'-11"
6''
2 Short walls #4 6'' 2 10 20 5.93 ' 118.600
Total Quantity = ( Rft ) 794.72 332.08 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS 0.236 Ton
Weight of Bars Dia Wise Kgs 135.10 100.62 0.00 0.00
Total Weight of Bars in Kgs 235.72

Page 8 of 111
PLOT# 49, SEC-1, PHASE(VIII)

ng the cost of straightening,removing twists, cutting, bending, binding,wastage, and


acing in position on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

4'-8" 6''

6''
9'-8"

4'-8" 6''

6''
9'-8"

9'-8" 6''

5'-8" 6''

Page 9 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

5'-11" 6''

5'-11" 6''

0.260 Ton

Page 10 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

4'-8" 6''

6''
9'-8"

4'-8" 6''

6''
9'-8"

9'-8" 6''

5'-8" 6''

5'-11" 6''

5'-11" 6''

0.260 Ton
Page 11 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE
0.260 Ton

5'-8" 6''

6''
8'-8"

5'-8" 6''

6''
8'-8"

8'-8" 6''

5'-8" 6''

6'-11" 6''

Page 12 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

6'-11" 6''

0.264 Ton

4'-8" 6''

Page 13 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

6''
6'-8"

4'-8" 6''

6''
6'-8"

6'-8" 6''

4'-8" 6''

4'-11" 6''

4'-11" 6''

0.189 Ton

Page 14 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

3'-8" 6''

6''
9'-8"

3'-8" 6''

6''
9'-8"

9'-8" 6''

5'-8" 6''

4'-11" 6''

4'-11" 6''

0.236 Ton

Page 15 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage,
overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Basement Floor
A Foundation
1 Piles

12''
1 Dowels #4 25 8 200 0.00 38'

3"
2 Stirrups #3 6'' 2 81 162 0.00
Total Quantity = ( Rft ) 0.00 0.00 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 0.00 0.00 0.00 0.00 0.000 T
Total Weight of Bars in Kgs 0.00
2 Bottom Bars

1 X-Direction Bars

25'
6''
1 Main bars at A'-B/4-8 #4 9'' 1 9 9 26.00 ' 234.00

39'-8"
6''
2 Main bars at B-D/4-10 #4 9'' 1 9 9 40.75 ' 366.75

61'-6"
6''
3 Main bars at D-F/1'-10 #4 9'' 1 18 Page 16 of18
111 62.50 ' 1125.00
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
6''
3 Main bars at D-F/1'-10 #4 9'' 1 18 18 62.50 ' 1125.00

54'-6"
6''
4 Main bars at F-L/1'-9 #4 9'' 1 43 43 55.50 ' 2386.50

25'
6''
5 Main bars at L-N'/5-9 #4 9'' 1 14 14 26.00 ' 364.00

2 Y-Direction Bars

46'-10"
6''
1 Main bars at D-K/1'-4 #4 9'' 1 28 28 47.83 ' 1339.24

55'
6''
2 Main bars at A'-L/4-5 #4 9'' 1 12 12 56.00 ' 672.00

65'-7"
6''
3 Main bars at A'-N'/5-8 #4 9'' 1 24 24 66.58 ' 1597.92

61'-6"
6''
4 Main bars at B-N'/8-9 #4 9'' 1 11 11 62.50 ' 687.50

18'-3"
6''
5 Main bars at B-F/9-10 #4 9'' 1 11 11 19.25 ' 211.75

TOP BARS

1 X-Direction Bars

25'
6''
1 Main bars at A'-B/4-8 #3 9'' 1 9 9 26.00 ' 234.00

39'-8"
6''
2 Main bars at B-D/4-10 #3 9'' 1 9 9 40.75 ' 366.75

61'-6"
6''
3 Main bars at D-F/1'-10 #3 9'' 1 18 18 62.50 ' 1125.00

Page 17 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

54'-6"
6''
4 Main bars at F-L/1'-9 #3 9'' 1 43 43 55.50 ' 2386.50

25'
6''
5 Main bars at L-N'/5-9 #3 9'' 1 14 14 26.00 ' 364.00

2 Y-Direction Bars

46'-10"
6''
1 Main bars at D-K/1'-4 #3 9'' 1 28 28 47.83 ' 1339.24

55'
6''
2 Main bars at A'-L/4-5 #3 9'' 1 12 12 56.00 ' 672.00

65'-7"
6''
3 Main bars at A'-N'/5-8 #3 9'' 1 24 24 66.58 ' 1597.92

61'-6"
6''
4 Main bars at B-N'/8-9 #3 9'' 1 11 11 62.50 ' 687.50

18'-3"
6''
5 Main bars at B-F/9-10 #3 9'' 1 11 11 19.25 ' 211.75
Stair Dowels
3'-6"
6''
1 Horizontal Bars #3 8'' 1 7 7 4.50 ' 31.50

3'-9"
6''
2 Vertical Bars #4 6'' 1 8 8 4.25 ' 34.00
Total Quantity = ( Rft ) 9016.16 9018.66 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 1532.75 2732.65 0.00 0.00 4.265 T
Total Weight of Bars in Kgs 4265.40
3 Footing Beam

1 F.B at C & F/1-3 Page 18 of 111


BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

1 F.B at C & F/1-3

12'' 13'-7.5
1 Bottom Bars #4 2 0 15.63 ' 0.00

12'' 13'-7.5
2 Top Bars #4 3 0 15.63 ' 0.00

12''
3 Top Bars #6 2 0 15.63 ' 0.00 13'-7.5

3"
4 Stirrups #3 9'' 19 0 5.00 ' 0.00

2 F.B at B' , D & E/3-5

12'' 17'-4"
1 Bottom Bars #4 2 0 19.33 ' 0.00

12'' 52'
2 Curtailment Bars #4 3 0 19.33 ' 0.00

12''
3 Top Bars #6 2 0 19.33 ' 0.00 54'

3"
4 Stirrups #3 9'' 25 0 5.00 ' 0.00

3 F.B at B-H/3

12'' 55'-10.5
1 Bottom Bars #4 2 0 57.88 ' 0.00
12'' 20'-9"
2 Curtailment Bars #4 3 0 22.75 ' 0.00

12''
3 Top Bars #6 2 Page 19 of 0111 22.75 ' 0.00
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
12''
3 Top Bars #6 2 0 22.75 ' 0.00 20'-9"

3"
4 Stirrups #3 9'' 71 0 5.00 ' 0.00
Total Quantity = ( Rft ) 0.00 0.00 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 0.00 0.00 0.00 0.00 0.000 T
Total Weight of Bars in Kgs 0.00

4 R.C.C WALL

Horizontal Bars

263'
6''
1 Horizontal Bars #3 9'' 1 17 17 264.60 ' 4498.20

Vertical Bars

12'-5"
6''
1 Dowel bars #4 6'' 1 502 502 13.43 ' 6741.86

Stirrups

3"
2 Stirrups #3 6'' 12 23 276 3.00 ' 828.00
Total Quantity = ( Rft ) 5326.20 6741.86 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 905.45 2042.78 0.00 0.00 2.948 T
Total Weight of Bars in Kgs 2948.24

5 Column
Page 20 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
5 Column

1 Typical Column

14'-7"
1 Vertical Bars #4 10 4 40 15.59 ' 623.60

3"
2 Stirrups #3 6'' 10 25 250 3.00 ' 750.00

1 C-3

14'-7"
1 Vertical Bars #4 4 2 8 15.59 ' 124.72

14'-7"
2 Vertical Bars #6 4 8 32 15.59 ' 498.88

3"
3 Stirrups #3 6'' 4 25 100 3.00 ' 300.00

3"
4 Stirrups #3 6'' 4 25 100 4.00 ' 400.00

3"
5 Hook #3 6'' 4 25 100 1.75 ' 175.00
Total Quantity = ( Rft ) 875.00 0.00 0.00 498.88
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 148.75 0.00 0.00 340.24 0.489 T
Total Weight of Bars in Kgs 488.99
WEIGHT OF TOTAL Weight of Bars Dia Wise Kgs 2586.9512 4775.4376 0.0000 340.2362
7.703 T
BARS Total Weight of Bars in Kgs 7702.62

Page 21 of 111
PLOT# 49, SEC-1, PHASE(VIII)

he cost of straightening,removing twists, cutting, bending, binding,wastage, and such


ng in position on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

12''
38'

6" x 21"
3"

0.000 Ton

25' 6''

39'-8" 6''

61'-6" 6''
Page 22 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

54'-6" 6''

25' 6''

46'-10" 6''

55' 6''

65'-7" 6''

61'-6" 6''

18'-3" 6''

25' 6''

39'-8" 6''

61'-6" 6''

Page 23 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

54'-6" 6''

25' 6''

46'-10" 6''

55' 6''

65'-7" 6''

61'-6" 6''

18'-3" 6''

3'-6" 6''

3'-9"

4.265 Ton

Page 24 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

13'-7.5" 12''

13'-7.5" 12''

12''
13'-7.5"

6" x 21"

3"
17'-4" 12''

52' 12''

12''
54'

6" x 21"
3"

55'-10.5" 12''

20'-9" 12''

12''
Page 25 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

20'-9"

6" x 21"

3"
0.000 Ton

263' 6''

12'-5" 6''

6" x 6"
3"

2.948 Ton

Page 26 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

14'-7" 12''

6" x 6"

3"
14'-7" 12''

14'-7" 12''

6" x 6"
3"

15" x 6"
3"
3"

0.489 Ton

7.703 Ton

Page 27 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage
such overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

X - DIRECTION REINFORCEMENT

Basement Floor Lintel


A Beams

1 9" Wall

287'
6''
1 Bottom Bars #4 1 2 2 288.00 ' 576.000

287'
6''
2 Top Bars #4 1 2 2 288.00 ' 576.000

3"
3 Stirrups #3 9'' 1 366 366 2.50 ' 915.000

2 4.5" Wall

38'
6''
1 Bottom Bars #4 1 2 2 39.00 ' 78.000

38'
6''
2 Top Bars #4 1 2 2 39.00 ' 78.000

3"
3 Stirrups #3 9'' 1 54 54 1.75 ' 94.500
Total Quantity = ( Rft ) 1009.50 1308.00 0.00 0.00

WEIGHT OF BARS Page 28 of 111 0.568 Ton


BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Weight per Rft in Kgs 0.170 0.303 0.473 0.682


WEIGHT OF BARS Weight of Bars Dia Wise Kgs 171.62 396.32 0.00 0.00 0.568 Ton
Total Weight of Bars in Kgs 567.94

Page 29 of 111
PLOT# 49, SEC-1, PHASE(VIII)

ng the cost of straightening,removing twists, cutting, bending, binding,wastage, and


acing in position on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

287' 6''

287' 6''

6" x 6"
3"

38' 6''

38' 6''

6" x 1.5"
3"

Page 30 of 111
0.568 Ton
ULE OF SECOND FLOOR SLAB

BAR SHAPE

0.568 Ton

Page 31 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage,
overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Basement floor Floor


A Slab & Beams
X - DIRECTION REINFORCEMENT

A Ground Floor Slab

X - DIRECTION
1 REINFORCEMENT

20'-6"
1 Main bars at D-G/1'-4 #3 8'' 1 26 26 20.50 ' 533.00

8'-6"
2 Main bars at C-G/4-5 #3 8'' 1 29 29 8.50 ' 246.50

6'-6"
3 Main bars at B'-E/5-8 #3 6'' 1 36 36 6.50 ' 234.00

15'-3"
4 Main bars at B-F/8-10 #3 6'' 1 27 27 15.25 ' 411.75

17'-6"
5 Main bars at E'-H/5-8 #3 6'' 1 43 43 17.50 ' 752.50

13'
6 Main bars at G-H/1'-3 #3 9'' 1 21 21 13.00 ' 273.00

8'-3"
7 Main bars at F-I/8-9 #3 8'' 1 37 37 8.25 ' 305.25
Page 32 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

20'-6"
8 Main bars at H-K/1'-4 #3 9'' 1 24 24 20.50 ' 492.00

8'-6"
9 Main bars at H-L/4-5 #3 8'' 1 32 32 8.50 ' 272.00

18'-3"
10 Main bars at H-M/5-8 #4 6'' 1 43 43 18.25 ' 784.75

7'-6"
11 Main bars at J-N/8-9 #3 9'' 1 21 21 7.50 ' 157.50

2 Horizontal Bars (Extra bars)

Page 33 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

9'
1 Main bars at C-G/2 #4 6'' 1 35 35 9.25 ' 323.75

15'-9"
2 Main bars at G-H/2 #4 8'' 1 24 24 16.00 ' 384.00

9'
3 Main bars at B'/3-5 #4 9'' 1 21 21 9.25 ' 194.25

8'-3"
4 Main bars at D-G/4 #4 9'' 1 24 24 8.25 ' 198.00

8'-3"
5 Main bars at H-L/4 #4 9'' 1 24 24 8.25 ' 198.00

2'-6"
6 Main bars at C-G/5 #3 9'' 1 26 26 2.75 ' 71.50

8'-6"
7 Main bars at G-H/5 #4 8'' 1 17 17 8.75 ' 148.75

8'-6"
8 Main bars at H-M/5 #4 6'' 1 30 30 8.50 ' 255.00

13'-6"
9 Main bars at D-H/8 #4 6'' 1 34 34 13.75 ' 467.50

13'-1"
10 Main bars at H-M/8 #4 6'' 1 34 34 13.33 ' 453.22

4'-6"
11 Main bars at B-F/10 #3 8'' 1 28 28 4.75 ' 133.00
2 Y - DIRECTION REINFORCEMENT

Y - DIRECTION
1 REINFORCEMENT

17'
1 Main bars at D-G/1'-4 #3 8'' 1 31 31 17.00 ' 527.00
Page 34 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

16'
2 Main bars at F-H/1'-3 #3 9'' 1 18 18 16.00 ' 288.00

17'
3 Main bars at H-K/1'-4 #3 8'' 1 32 32 17.00 ' 544.00

21'
4 Main bars at C-G/4-5 #3 8'' 1 14 14 21.00 ' 294.00

21'
2 Main bars at H-L/4-5 #3 9'' 1 14 14 21.00 ' 294.00

6'-6"
3 Main bars at B'-E/5-8 #4 6'' 1 27 27 6.50 ' 175.50

21'
4 Main bars at E'-H/5-8 #3 8'' 1 27 27 21.00 ' 567.00

23'
2 Main bars at H-M/5-8 #4 6'' 1 28 28 23.00 ' 644.00

18'-3"
3 Main bars at C-F/8-10 #3 8'' 1 24 24 18.25 ' 438.00

24'-4.5"
4 Main bars at F-I/8-9 #3 9'' 1 14 14 24.38 ' 341.25

13'
2 Main bars at I-N/8-9 #3 9'' 1 12 12 13.00 ' 156.00

Vertical Bars (Extra bars)

4'-6"
1 Main bars at D/1'-5 #3 9'' 1 43 43 4.75 ' 204.25

13'
3''
2 Main bars at D/8'-10 #4 8'' 1 24 24 13.50 ' 324.00

8'-9"
3 Main bars at G/1'-5 #4 9'' 1 43Page 35 of 43
111 8.75 ' 376.25
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
8'-9"
3 Main bars at G/1'-5 #4 9'' 1 43 43 8.75 ' 376.25

25'-6"
4 Main bars at F/8-9 #4 6'' 1 18 18 25.75 ' 463.50

9'-1"
5 Main bars at H/1'-5 #4 9'' 1 43 43 9.08 ' 390.44

14'
6 Main bars at H/5-8 #4 6'' 1 38 38 14.00 ' 532.00

11'-3.5"
2 Main bars at I/8-9 #4 9'' 1 12 12 11.30 ' 135.54

4'-9"
3 Main bars at K/1'-4 #3 8'' 1 32 32 5.00 ' 160.00

5'-6"
4 Main bars at L/4-6 #3 9'' 1 27 27 5.75 ' 155.25

6'-6"
5 Main bars at M/6-9 #4 7'' 1 29 29 6.75 ' 195.75
A Stair
3'' 4'
1 Main Bars #4 6'' 1 63 63 4.44 ' 279.72

3'' 34'-6"
2 Distribution Bars #3 8'' 1 7 7 35.00 ' 245.00
Total Quantity = ( Rft ) 8095.75 6923.92 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 1376.28 2097.95 0.00 0.00 3.474 To
Total Weight of Bars in Kgs 3474.23
Basement Floor Slab
A Beam

Page 36 of 111
1 B-1 at E'/5-8
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

1 B-1 at E'/5-8

12'' 17'
1 Bottom Bars #6 1 3 3 19.25 ' 57.75

12''
2 Top Bars #6 1 3 3 19.25 ' 57.75 17'

3"
3 Stirrups #3 6'' 1 36 36 4.00 ' 144.00

2 B-1 at H-K/6

12'' 15'-1"
1 Bottom Bars #6 1 3 3 17.08 ' 51.24

12''
2 Top Bars #4 1 3 3 17.08 ' 51.24 15'-1"

3"
3 Stirrups #3 6'' 1 31 31 4.00 ' 124.00

3 B-1 at D/9-10

4'' 9'-10"
1 Bottom Bars #6 1 3 3 11.83 ' 35.49

4''
2 Top Bars #4 1 3 3 11.83 ' 35.49 9'-10"

3"
3 Stirrups #3 6'' 1 21 21 4.00 ' 84.00

4 B-2 at E'-H/9

Page 37 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

12'' 20'-9"
1 Bottom Bars #6 1 5 5 22.75 ' 113.75

12''
2 Top Bars #6 1 4 4 22.75 ' 91.00 20'-9"

3"
3 Stirrups #3 6'' 1 43 43 4.50 ' 193.50

5 S.B-1

6'' 99'
1 Bottom Bars #4 1 2 2 100.75 ' 201.50

6'' 99'
2 Top Bars #4 1 2 2 100.75 ' 201.50

3"
3 Stirrups #3 6'' 1 203 203 2.50 ' 507.50

6 UB-3

12'' 7'-3"
1 Bottom Bars #6 1 3 3 9.25 ' 27.75

12''
2 Top Bars #4 1 2 2 9.25 ' 18.50 7'-3"

3"
3 Stirrups #3 6'' 1 16 16 3.50 ' 56.00

7 UB-6

12'' 11'
1 Bottom Bars #6 1 4 4 13.00 ' 52.00
Page 38 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

12''
2 Top Bars #4 1 2 2 13.00 ' 26.00 11'

3"
3 Stirrups #3 6'' 1 23 23 3.50 ' 80.50

8 C B-1

4'' 57'-9"
1 Bottom Bars #6 1 3 3 58.41 ' 175.23

4''
2 Top Bars #4 1 3 3 58.41 ' 175.23 57'-9"

3"
3 Stirrups #3 6'' 1 117 117 3.50 ' 409.50

9 CB-2

4'' 15'
1 Bottom Bars #6 1 6 6 15.66 ' 93.96

4''
2 Top Bars #4 1 6 6 15.66 ' 93.96 15'

3"
3 Stirrups #3 6'' 1 31 31 5.00 ' 155.00

10 CB-3

4'' 10'-3"
1 Bottom Bars #6 3 6 18 10.91 ' 196.38

4''
2 Top Bars #4 3 6 18 10.91 ' 196.38 10'-3"
Page 39 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
2 Top Bars #4 3 6 18 10.91 ' 196.38 10'-3"

3"
3 Stirrups #3 6'' 3 22 66 5.50 ' 363.00

11 CB-4

4'' 9'-3"
1 Bottom Bars #6 1 5 5 9.91 ' 49.55

4''
2 Top Bars #4 1 5 5 9.91 ' 49.55 9'-3"

3"
3 Stirrups #3 6'' 1 20 20 4.00 ' 80.00
Total Quantity = ( Rft ) 2197.00 1049.35 0.00 1001.85
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS
Weight of Bars Dia Wise Kgs 373.49 317.95 0.00 683.26
1.375 To
Total Weight of Bars in Kgs 1374.70
Weight of Bars Dia Wise Kgs 1749.77 2415.90 0.00 683.26
WEIGHT OF TOTAL BARS 4.849 To
Total Weight of Bars in Kgs 4848.93

Page 40 of 111
PLOT# 49, SEC-1, PHASE(VIII)

the cost of straightening,removing twists, cutting, bending, binding,wastage, and such


ing in position on cement concrete complete in all respects.

DULE OF SECOND FLOOR SLAB

BAR SHAPE

20'-6"

8'-6"

6'-6"

15'-3"

17'-6"

13'

8'-3"

Page 41 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

20'-6"

8'-6"

18'-3"

7'-6"

Page 42 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

9' 3''

15'-9" 3''

9' 3''

8'-3"

8'-3"

2'-6" 3''

8'-6" 3''

8'-6"

13'-6" 3''

13'-1" 3''

4'-6" 3''

17'

Page 43 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

16'

17'

21'

21'

6'-6"

21'

23'

18'-3"

24'-4.5"

13'

4'-6" 3''

13' 3''

8'-9"
Page 44 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

8'-9"

25'-6" 3''

9'-1"

14'

11'-3.5"

4'-9" 3''

5'-6" 3''

6'-6" 3''

4' 3''

34'-6" 3''

3.474 Ton

Page 45 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

17' 12''

12''
17'

6" x 15"

3"
15'-1" 12''

12''
15'-1"

6" x 15"
3"

9'-10" 4''

4''
9'-10"

6"x15"
3"

Page 46 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

20'-9" 12''

12''
20'-9"

6" x 18"

3"
99' 6''

99' 6''

6" x 6"
3"

7'-3" 12''

12''
7'-3"

6"x12"
3"

11' 12''

Page 47 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

12''
11'

6" x 12"

3"
57'-9" 4''

4''
57'-9"

12" x 6"

3"

15' 4''

4''
15'

21" x 6"
3"

10'-3" 4''

4''
10'-3"
Page 48 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

10'-3"

24" x 6"

3"
9'-3" 4''

4''
9'-3"

15" x 6"

3"
1.375 Ton

4.849 Ton

Page 49 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage,
overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Ground Floor
A Foundation
Foundation

1 F1 Footing

4'-8"
9''
1 Main Bars #4 8'' 1 8 8 6.18 ' 49.44

4'-8"
9''
2 Distribution Bars #4 8'' 1 8 8 6.18 ' 49.44

2 F2 Footing

3'-8"
9''
1 Main Bars #4 8'' 2 8 16 5.18 ' 82.88

4'-8"
9''
2 Distribution Bars #4 8'' 2 6 12 6.18 ' 74.16

3 F3 Footing

3'-8"
9''
1 Main Bars #4 8'' 2 6 12 5.18 ' 62.16

3'-8"
9''
2 Distribution Bars #4 8'' 2 6 Page 50 of12
111 5.18 ' 62.16
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
2 Distribution Bars #4 8'' 2 6 12 5.18 ' 62.16
Total Quantity = ( Rft ) 0.00 380.24 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 0.00 115.21 0.00 0.00 0.115 T
Total Weight of Bars in Kgs 115.21

Page 51 of 111
PLOT# 49, SEC-1, PHASE(VIII)

he cost of straightening,removing twists, cutting, bending, binding,wastage, and such


ng in position on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

4'-8" 9''

4'-8" 9''

3'-8" 9''

4'-8" 9''

3'-8" 9''

3'-8" 9''
Page 52 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

0.115 Ton

Page 53 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage
such overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

X - DIRECTION REINFORCEMENT

A Ground Floor Column

1 Column

1 Typical Column

13'
1 Vertical Bars #4 25 4 100 13.00 ' 1300.00

3"
2 Stirrups #3 6'' 25 23 575 3.00 ' 1725.00

2 C1 Column

14'
12''
1 Vertical Bars #6 3 10 30 16.00 ' 480.00

1'-3"
3"
2 Hook #3 6'' 3 28 84 1.75 ' 147.00

3"
3 Stirrups #3 6'' 3 29 87 3.00 ' 261.00

3"
Page 54 of 111
4 Stirrups #3 6'' 3 29 87 4.50 ' 391.50
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

4 Stirrups #3 6'' 3 29 87 4.50 ' 391.50

3 C2 Column

11'
12''
1 Vertical Bars #6 2 8 16 13.00 ' 208.00

3"
2 Stirrups #3 6'' 2 23 46 3.00 ' 138.00

3"
3 Stirrups #3 6'' 2 23 46 5.50 ' 253.00

4 C3 Column

14'-3"
1 Vertical Bars #6 4 8 32 14.25 ' 456.00

14'-3"
2 Vertical Bars #4 4 2 8 14.25 ' 114.00

1'-3"
3"
3 Hook #3 6'' 4 22 88 1.75 ' 154.00

3"
4 Stirrups #3 6'' 4 23 92 2.50 ' 230.00

3"
5 Stirrups #3 6'' 4 23 92 4.00 ' 368.00
Total Quantity = ( Rft ) 3667.50 1414.00 0.00 1144.00
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 623.48 428.44 0.00 780.21 1.832 Ton
Total Weight of Bars in Kgs 1832.13
Page 55 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Ground Floor Lintel


A Beams

1 9" Wall

279'
6''
1 Bottom Bars #4 1 2 2 280.00 ' 560.000

279'
6''
2 Top Bars #4 1 2 2 281.00 ' 562.000

3"
3 Stirrups #3 9'' 1 361 361 2.50 ' 902.500

2 4.5" Wall

39'
6''
1 Bottom Bars #4 1 2 2 40.00 ' 80.000

39'
6''
2 Top Bars #4 1 2 2 40.00 ' 80.000

3"
3 Stirrups #3 9'' 1 59 59 1.75 ' 103.250
Total Quantity = ( Rft ) 1005.75 1282.00 0.00 0.00
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 170.98 388.45 0.00 0.00 0.559 Ton
Total Weight of Bars in Kgs 559.42
Weight of Bars Dia Wise Kgs 794.45 816.89 0.00 780.21
WEIGHT OF TOTAL BARS 2.392 Ton
Total Weight of Bars in Kgs 2391.55

Page 56 of 111
PLOT# 49, SEC-1, PHASE(VIII)

ng the cost of straightening,removing twists, cutting, bending, binding,wastage, and


acing in position on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

13'

6" x 6"
3"

14' 12''

1'-3" 3"

6" x 9"
3"

9"x15"
3"

Page 57 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

9"x15"

11' 12''

9" x 9"

3"
15" x 15"

3"
14'-3"

14'-3"

1'-3" 3"

6" x 6"
3"

6" x 15"
3"

1.832 Ton

Page 58 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

279' 6''

279' 6''

6" x 6"

3"
39' 6''

39' 6''

6" x 1.5"
3"

0.559 Ton

2.392 Ton

Page 59 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage,
overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

X - DIRECTION REINFORCEMENT

Ground Floor Slab &


A Beams

A Ground Floor Slab

X - DIRECTION
1 REINFORCEMENT

20'-6"
1 Main bars at D-G/1'-4 #3 8'' 1 26 26 20.50 ' 533.00

8'-6"
2 Main bars at C-G/4-5 #3 8'' 1 29 29 8.50 ' 246.50

17'-6"
3 Main bars at B-H/5-8 #3 8'' 1 48 48 17.50 ' 840.00

10'
4 Main bars at D-F/9-10 #3 6'' 1 29 29 10.00 ' 290.00

15'
5 Main bars at A-F/10-11' #4 6'' 1 55 55 15.00 ' 825.00

28'-3"
6 Main bars at G-H/1'-5 #3 8'' 1 17 17 28.25 ' 480.25

22'
7 Main bars at F-I/9-11 #4 8'' 1 42 42 22.00 ' 924.00
Page 60 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

19'
8 Main bars at H-K/1'-4 #3 9'' 1 24 24 19.00 ' 456.00

8'-6"
9 Main bars at H-N/4-5 #3 8'' 1 34 34 8.50 ' 289.00

8'-9"
10 Main bars at H-N/5-6 #3 6'' 1 45 45 8.75 ' 393.75

8'-9"
11 Main bars at G-H'/6-8 #3 6'' 1 47 47 8.75 ' 411.25

8'
12 Main bars at E'-N/8-9 #3 8'' 1 59 59 8.00 ' 472.00

2 Horizontal Bars (Extra bars)

Page 61 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

9'
1 Main bars at D-G/2 #4 6'' 1 35 35 9.25 ' 323.75

13'
2 Main bars at G-H/2' #4 6'' 1 22 22 13.25 ' 291.50

7'-6"
3 Main bars at H-K/2 #4 6'' 1 35 35 7.75 ' 271.25

21'
4 Main bars at C-G/4 #4 8'' 1 29 29 21.00 ' 609.00

8'-3"
5 Main bars at H-L/4 #4 9'' 1 26 26 8.25 ' 214.50

13'-6"
6 Main bars at G-L/5 #4 8'' 1 17 17 13.50 ' 229.50

20'-6"
7 Main bars at H-L/5 #4 6'' 1 44 44 20.50 ' 902.00

8'-3"
8 Main bars at D-H/8 #4 8'' 1 40 40 8.25 ' 330.00

7'-9"
9 Main bars at F-N/9 #4 8'' 1 53 53 7.75 ' 410.75

4'
10 Main bars at A'-F/10 #4 8'' 1 39 39 4.25 ' 165.75

14'-3"
11 Main bars at F-I/11 #4 4'' 1 84 84 14.50 ' 1218.00
Y - DIRECTION REINFORCEMENT

Y - DIRECTION
1 REINFORCEMENT

17'
1 Main bars at D-G/1'-4 #3 8'' 1 31 31 17.00 ' 527.00
Page 62 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

19'
2 Main bars at C-G/4-5 #3 8'' 1 14 14 19.00 ' 266.00

32'
3 Main bars at B-H/5-8 #3 8'' 1 28 28 32.00 ' 896.00

13'
4 Main bars at E-F/9-10 #3 5'' 1 25 25 13.00 ' 325.00

27'
5 Main bars at A'-F/10-11' #4 8'' 1 23 23 27.00 ' 621.00

10'-6"
6 Main bars at G-H/1'-5 #3 6'' 1 59 59 10.50 ' 619.50

28'
7 Main bars at F-I/9-11 #3 9'' 1 30 30 28.00 ' 840.00

29'
8 Main bars at E'-I/8-9 #3 9'' 1 12 12 29.00 ' 348.00

17'
9 Main bars at H-K/1'-4 #3 8'' 1 29 29 17.00 ' 493.00

22'
10 Main bars at H-N/4-5 #3 9'' 1 12 12 22.00 ' 264.00

22'
11 Main bars at H-N/5-6 #3 8'' 1 14 14 22.00 ' 308.00

23'
12 Main bars at H-N/6-7 #3 8'' 1 15 15 23.00 ' 345.00

11'-3"
13 Main bars at I-N/8-9 #3 8'' 1 17 17 11.25 ' 191.25

1 Vertical Bars (Extra bars)

Page 63 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

5'
1 Main bars at E/1'-5 #3 9'' 1 39 39 5.25 ' 204.75

11'-1"
2 Main bars at B/5-8 #4 4'' 1 56 56 11.33 ' 634.48

18'-9"
3 Main bars at D/9-10 #4 9'' 1 14 14 19.00 ' 266.00

7'
4 Main bars at A & F/10-11 #4 9'' 1 21 21 7.25 ' 152.25

10'
5 Main bars at G/2-5 #4 9'' 1 35 35 10.00 ' 350.00

10'
6 Main bars at H/2-5 #4 9'' 1 35 35 10.00 ' 350.00

15'-3"
7 Main bars at H/5-8 #4 9'' 1 24 24 15.25 ' 366.00

5'-6"
8 Main bars at K/2-4 #3 9'' 1 26 26 5.50 ' 143.00

9'-6"
9 Main bars at L/4-6 #4 8'' 1 28 28 9.75 ' 273.00

5'-6"
10 Main bars at N/6-9 #3 8'' 1 31 31 5.75 ' 178.25
STAIR
3'' 3'-11"
1 Main Bars #4 6'' 1 52 52 4.44 ' 230.88

3'' 29'-6"
2 Distribution Bars #3 8'' 1 6 6 30.00 ' 180.00
Total Quantity = ( Rft ) 10540.50 9958.61 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS 4.809 To
Page 64 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 1791.89 3017.46 0.00 0.00 4.809 To
Total Weight of Bars in Kgs 4809.34
Ground Floor Slab
A Beam

1 B-1 at E'/5-8

12'' 17'
1 Bottom Bars #6 1 3 3 19.25 ' 57.75

12''
2 Top Bars #6 1 3 3 19.25 ' 57.75 17'

3"
3 Stirrups #3 6'' 1 36 36 4.00 ' 144.00

2 B-1 at H-K/6

Page 65 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

12'' 15'-1"
1 Bottom Bars #6 1 3 3 17.08 ' 51.24

12''
2 Top Bars #4 1 3 3 17.08 ' 51.24 15'-1"

3"
3 Stirrups #3 6'' 1 31 31 4.00 ' 124.00

3 B-1 at D/9-10

12'' 9'-10"
1 Bottom Bars #6 1 3 3 11.83 ' 35.49

12''
2 Top Bars #4 1 3 3 11.83 ' 35.49 9'-10"

3"
3 Stirrups #3 6'' 1 21 21 4.00 ' 84.00

4 B-2 at E'-H/9

12'' 20'-9"
1 Bottom Bars #6 1 5 5 22.75 ' 113.75

12''
2 Top Bars #6 1 4 4 22.75 ' 91.00 20'-9"

3"
3 Stirrups #3 6'' 1 43 43 4.50 ' 193.50

5 S.B-1

6'' 99'
1 Bottom Bars #4 1 2 2 100.75 ' 201.50
Page 66 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6
1 Bottom Bars #4 1 2 2 100.75 ' 201.50

6'' 99'
2 Top Bars #4 1 2 2 100.75 ' 201.50

3"
3 Stirrups #3 6'' 1 203 203 2.50 ' 507.50

6 B-4

Page 67 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

6 B-4

12'' 24'-1.5"
1 Bottom Bars #6 1 8 8 26.13 ' 209.00

12''
2 Curtailment Bars #4 1 4 4 26.13 ' 104.50 24'-1.5"

12''
3 Top Bars #4 1 3 3 26.13 ' 78.38 24'-1.5"

3"
4 Stirrups #3 6'' 1 49 49 5.00 ' 245.00

7 UB-1

12'' 26'-9"
1 Bottom Bars #6 1 5 5 28.75 ' 143.75

12''
2 Curtailment Bars #4 1 4 4 28.75 ' 115.00 26'-9"

12''
3 Top Bars #6 1 4 4 28.75 ' 115.00 26'-9"

3"
4 Stirrups #3 6'' 1 55 55 5.00 ' 275.00

8 UB-2

12'' 26'-9"
1 Bottom Bars #6 1 3 3 28.75 ' 86.25

12''
2 Curtailment Bars #4 1 4 4 28.75 ' 115.00 26'-9"

Page 68 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

12''
2 Top Bars #6 1 5 5 28.75 ' 143.75 26'-9"

3"
3 Stirrups #3 6'' 1 51 51 3.50 ' 178.50

9 UB-3
12'' 7'-9"
1 Bottom Bars #6 1 3 3 9.75 ' 29.25

12''
2 Top Bars #4 1 2 2 9.75 ' 19.50 7'-9"

3"
3 Stirrups #3 6'' 1 19 19 3.50 ' 66.50

10 CB-1

4'' 16'-9"
1 Bottom Bars #6 1 3 3 17.41 ' 52.23

4''
2 Top Bars #4 1 3 3 17.41 ' 52.23 16'-9"

3"
3 Stirrups #3 6'' 1 35 35 3.50 ' 122.50

11 CB-2

4'' 15'
1 Bottom Bars #6 1 6 6 15.66 ' 93.96

4''
2 Top Bars #4 1 6 6 15.66 ' 93.96 15'
Page 69 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

2 Top Bars #4 1 6 6 15.66 ' 93.96 15'

3"
3 Stirrups #3 6'' 1 31 31 5.00 ' 155.00

12 CB-4

4'' 10'-2"
1 Bottom Bars #6 2 5 10 10.91 ' 109.10

4''
2 Top Bars #4 2 5 10 10.91 ' 109.10 10'-2"

3"
3 Stirrups #3 6'' 2 23 46 4.00 ' 184.00
Total Quantity = ( Rft ) 2279.50 1177.40 0.00 1389.27
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS
Weight of Bars Dia Wise Kgs 387.52 356.75 0.00 947.48
1.692 To
Total Weight of Bars in Kgs 1691.75
Weight of Bars Dia Wise Kgs 2179.40 3374.21 0.00 947.48
WEIGHT OF TOTAL Bars 6.501 To
Total Weight of Bars in Kgs 6501.09

Page 70 of 111
PLOT# 49, SEC-1, PHASE(VIII)

the cost of straightening,removing twists, cutting, bending, binding,wastage, and such


ing in position on cement concrete complete in all respects.

DULE OF SECOND FLOOR SLAB

BAR SHAPE

20'-6"

8'-6"

17'-6"

10'

15'

28'-3"

22'

Page 71 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

19'

8'-6"

8'-9"

8'-9"

8'

Page 72 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

9' 3''

13' 3''

7'-6" 3''

21'

8'-3"

13'-6"

20'-6"

8'-3"

7'-9"

4' 3''

14'-3" 3''

17'

Page 73 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

19'

32'

13'

27'

10'-6"

28'

29'

17'

22'

22'

23'

11'-3"

Page 74 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

5' 3''

11'-1" 3''

18'-9" 3''

7' 3''

10'

10'

15'-3"

5'-6" 3''

9'-6" 3''

5'-6" 3''

3'-11" 3''

29'-6" 3''

4.809 Ton
Page 75 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

4.809 Ton

17' 12''

12''
17'

6" x 15"

3"

Page 76 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

15'-1" 12''

12''
15'-1"

6" x 15"

3"
9'-10" 12''

12''
9'-10"

3" 6"x15"

20'-9" 12''

12''
20'-9"

6" x 18"
3"

99' 6''

Page 77 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

99' 6''

6" x 6"

3"

Page 78 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

24'-1.5" 12''

12''
24'-1.5"

12''
24'-1.5"

6"x21"

3"
26'-9" 12''

12''
26'-9"

12''
26'-9"

6" x 21"
3"

26'-9" 12''

12''
26'-9"

Page 79 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

12''
26'-9"

6"x12"

3"
7'-9" 12''

12''
7'-9"

6" x 12"

3"

16'-9" 4''

4''
16'-9"

12" x 6"
3"

15' 4''

4''
15'
Page 80 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

15'

21" x 6"

3"
10'-2" 4''

4''
10'-2"

15" x 6"

3" 1.692 Ton

6.501 Ton

Page 81 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage, and such overlap
not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description DIA (C/C) Elements Total Nos BAR SHAPE
Nos LENGTH #3 #4 #5 #6

First Floor Lintel Beams


A & Columns

1 C3 Column

12'
6''
1 Vertical Bars #6 3 8 24 12.50 ' 300.00

12'
6''
2 Vertical Bars #4 3 2 6 12.50 ' 75.00

1'-3"
3"
3 Hook #3 6'' 3 22 66 1.75 ' 115.50

3"
4 Stirrups #3 6'' 3 23 69 2.50 ' 172.50

3"
5 Stirrups #3 6'' 3 23 69 4.00 ' 276.00

3"
2 Stirrups #3 6'' 3 23 69 5.10 ' 351.90

1 Typical Column

12'
6''
1 Vertical Bars #4 25 4 100 12.50 ' 1250.00
Page 82 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description DIA (C/C) Elements Total Nos BAR SHAPE
Nos LENGTH #3 #4 #5 #6

3"
2 Stirrups #3 6'' 25 23 575 2.50 ' 1437.50
Total Quantity = ( Rft ) 2353.40 1325.00 0.00 300.00
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 400.08 401.48 0.00 204.60 1.006 Ton
Total Weight of Bars in Kgs 1006.15

2 LB-2

7'-6"
12''
1 Bottom Bars #6 1 5 5 9.50 ' 47.500

12''
2 Top Bars #6 1 2 2 9.50 ' 19.000 7'-6"

3"
3 Stirrups #3 6'' 1 17 17 4.00 ' 68.000

7 9" Wall

467'-6"
6''
1 Bottom Bars #4 1 2 2 468.50 ' 937.000

6''
2 Top Bars #4 1 2 2 288.00 ' 576.000 467'-6"

3"
3 Stirrups #3 9'' 1 414 414 2.50 ' 1,035.000

8 4.5" Wall

69'
6''
1 Bottom Bars #4 1 2 2 70.00 ' 140.000
Page 83 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description DIA (C/C) Elements Total Nos BAR SHAPE
Nos LENGTH #3 #4 #5 #6

6''
2 Top Bars #4 1 2 2 70.00 ' 140.000 69'

3"
3 Stirrups #3 9'' 1 81 81 1.75 ' 141.750
Total Quantity = ( Rft ) 1244.75 1793.00 0.00 66.50
Weight per Rft in Kgs 0.170 0.303 0.473 0.682
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 211.61 543.28 0.00 45.35 0.800 Ton
Total Weight of Bars in Kgs 800.24
Weight of Bars Dia Wise Kgs 611.6855 944.7540 0.0000 249.9530
WEIGHT OF TOTAL BARS 1.806 Ton
Total Weight of Bars in Kgs 1806.39

Page 84 of 111
PLOT# 49, SEC-1, PHASE(VIII)

t of straightening,removing twists, cutting, bending, binding,wastage, and such overlaps as are


osition on cement concrete complete in all respects.

ULE OF SECOND FLOOR SLAB

BAR SHAPE

12'

12'

1'-3" 3"

6" x 6"
3"

6" x 15"
3"

6" x 15"
3"

12'

Page 85 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

6" x 6"

3"
1.006 Ton

7'-6" 12''

12''
7'-6"

3" 6" x 15"

467'-6" 6''

6''
467'-6"

6" x 6"
3"

69' 6''

Page 86 of 111
ULE OF SECOND FLOOR SLAB

BAR SHAPE

6''
69'

6" x 1.5"

3"
0.800 Ton

1.806 Ton

Page 87 of 111
CONSTRUCTION OF PLOT# 49, SEC-1, PHASE(VIII)
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage
such overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

First Floor Slab &


A Beams
1 First Floor Slab

X - DIRECTION
1 REINFORCEMENT

17'-6"
1 Main bars at D-G/2-4 #3 9'' 1 24 24 17.50 ' 420.00

8'-6"
2 Main bars at C-G/4-5 #3 9'' 1 26 26 8.50 ' 221.00

17'-6"
3 Main bars at B-H/5-8 #4 6'' 1 65 65 17.50 ' 1137.50

11'
4 Main bars at B-F/9-10 #3 8'' 1 28 28 11.00 ' 308.00

7'-6"
5 Main bars at E'-N/8-9 #3 6'' 1 79 79 7.50 ' 592.50

28'-3"
6 Main bars at G-H/1'-5 #3 9'' 1 15 15 28.25 ' 423.75

14'
7 Main bars at F-J1/9-10A #4 6'' 1 55 55 14.00 ' 770.00

19'
8 Main bars at H-K/2-4 #3 9'' 1 24 24 19.00 ' 456.00

Page 88 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

8'-6"
9 Main bars at H-L/4-5 #3 9'' 1 26 26 8.50 ' 221.00

19'
10 Main bars at H-N/5-8 #4 6'' 1 45 45 19.00 ' 855.00

9'-6"
12 Main bars at I-N/8-9' #3 6'' 1 25 25 9.50 ' 237.50

Horizontal Bars (Extra bars)

6'
1 Main bars at D-G/2 #4 9'' 1 24 24 6.25 ' 150.00

14'-9"
2 Main bars at G-H/2 #4 6'' 1 22 22 15.00 ' 330.00

Page 89 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

6'-6"
3 Main bars at H-K/2 #4 9'' 1 24 24 6.75 ' 162.00

8'-3"
4 Main bars at C-G/4 #4 9'' 1 26 26 8.25 ' 214.50

8'-3"
5 Main bars at H-L/4 #4 9'' 1 26 26 8.25 ' 214.50

12'-6"
6 Main bars at B-H/5 #4 8'' 1 49 49 12.50 ' 612.50

8'-3"
7 Main bars at H-L/5 #4 6'' 1 44 44 8.25 ' 363.00

17'-3"
8 Main bars at B-H/5 #4 8'' 1 49 49 17.25 ' 845.25

12'-3"
9 Main bars at H-J1/8 #4 6'' 1 29 29 12.25 ' 355.25

15'
10 Main bars at J1-N/8 #4 6'' 1 19 19 15.25 ' 289.75

11'
11 Main bars at B-E/10 #4 9'' 1 26 26 11.25 ' 292.50

5'-6"
12 Main bars at F-J1/10a #4 9'' 1 36 36 5.75 ' 207.00
Y - DIRECTION REINFORCEMENT

Y - DIRECTION
1 REINFORCEMENT

17'
1 Main bars at D-G/2-4 #3 8'' 1 31 31 17.00 ' 527.00

19'
2 Main bars at C-G/4-5 #3 9'' 1 13 13 19.00 ' 247.00
Page 90 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

2 Main bars at C-G/4-5 #3 9'' 1 13 13 19.00 ' 247.00

32'
3 Main bars at B-H/5-8 #3 8'' 1 28 28 32.00 ' 896.00

18'-3"
4 Main bars at B-F/9-10 #3 8'' 1 17 17 18.25 ' 310.25

10'-6"
5 Main bars at G-H/1'-5 #3 8'' 1 44 44 10.50 ' 462.00

28'
6 Main bars at F-I/9-10a #3 8'' 1 20 20 28.00 ' 560.00

39'
7 Main bars at E'-N/8-9 #3 8'' 1 12 12 39.00 ' 468.00

17'
8 Main bars at H-K/1'-4 #3 8'' 1 29 29 17.00 ' 493.00

19'
9 Main bars at H-N/4-5 #3 9'' 1 12 12 19.00 ' 228.00

22'
10 Main bars at H-N/5-8 #4 6'' 1 39 39 22.00 ' 858.00

Page 91 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

1 Vertical Bars (Extra bars)

5'
1 Main bars at E/1'-5 #3 9'' 1 39 39 5.25 ' 204.75

11'-1"
2 Main bars at B/5-8 #4 4'' 1 56 56 11.33 ' 634.48

5'
3 Main bars at D/9-10 #3 9'' 1 14 14 5.25 ' 73.50

12'
4 Main bars at F/9-10a #4 9'' 1 21 21 12.00 ' 252.00

9'
5 Main bars at G/2-5 #4 9'' 1 35 35 9.00 ' 315.00

9'
6 Main bars at H/2-5 #4 9'' 1 39 39 9.00 ' 351.00

15'-6"
7 Main bars at H/5-8 #4 6'' 1 36 36 15.50 ' 558.00

10'-3"
8 Main bars at I/9-10a #4 4'' 1 43 43 10.50 ' 451.50

9'-6"
9 Main bars at L/4-6 #4 8'' 1 28 28 9.75 ' 273.00

5'-6"
10 Main bars at N/6-9 #3 8'' 1 31 31 5.75 ' 178.25

5'
11 Main bars at B-H/1 #3 8'' 1 80 80 5.25 ' 420.00

10'
12 Main bars at B-D/3 #4 6'' 1 44 44 10.00 ' 440.00

Page 92 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

STAIR
3'' 3'-11"
1 Main Bars #4 6'' 1 52 52 4.44 ' 230.88
3'' 29'-6"
2 Distribution Bars #3 8'' 1 6 6 30.00 ' 180.00
Total Quantity = ( Rft ) 8127.50 11162.61 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 1381.68 3382.27 0.00 0.00 4.764 Ton
Total Weight of Bars in Kgs 4763.95
Ground Floor Slab
A Beam

1 B-1

12'' 17'-3"
1 Bottom Bars #6 1 3 3 19.25 ' 57.75

12''
2 Top Bars #6 1 3 3 19.25 ' 57.75 17'-3"

6"x

3"
3 Stirrups #3 6'' 1 36 36 4.00 ' 144.00

2 B-2

12'' 22'-9"
1 Bottom Bars #6 1 5 5 24.75 ' 123.75

12''
2 Top Bars #4 1 4 4 24.75 ' 99.00 22'-9"

3"
6" x
3 Stirrups #3 6'' 1 47 47 4.50 ' 211.50
Page 93 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6
3 Stirrups #3 6'' 1 47 47 4.50 ' 211.50

3 B-3

12'' 24'-1.5"
1 Bottom Bars #6 1 5 5 26.13 ' 130.63

12''
2 Top Bars #6 1 2 2 26.13 ' 52.25 24'-1.5"

6" x

3"
3 Stirrups #3 6'' 1 49 49 4.50 ' 220.50

4 UB-5

12'' 18'
1 Bottom Bars #6 1 5 5 20.00 ' 100.00

12''
2 Curtailment Bars #4 1 4 4 20.00 ' 80.00 18'

12''
2 Top Bars #6 1 3 3 20.00 ' 60.00 18'

Page 94 of 111
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

6" x

3"
3 Stirrups #3 6'' 1 37 37 5.00 ' 185.00

5 CB-1

4'' 13'-4.5"
1 Bottom Bars #6 1 7 7 14.04 ' 98.25

4'' 13'-4.5"
2 Top Bars #4 1 6 6 14.04 ' 84.21

12"

3"
3 Stirrups #3 6'' 1 28 28 3.50 ' 98.00

6 CB-4

4'' 12'-5"
1 Bottom Bars #6 1 7 7 31.41 ' 219.87

4'' 12'-5"
2 Top Bars #4 1 6 6 31.41 ' 188.46

15"

3"
3 Stirrups #3 6'' 1 61 61 4.00 ' 244.00

7 CB-5

4'' 27'
1 Bottom Bars #6 1 7 7 27.66 ' 193.62

4'' 27'
2 Top Bars #4 1 6 6 27.66 ' 165.96

27"

3"
3 Stirrups #3 6'' 1 55 55 of 111 6.00 '
Page 95 330.00
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHAPE
DIA (C/C) Nos LENGTH #3 #4 #5 #6

3 Stirrups #3 6'' 1 55 55 6.00 ' 330.00

18"

3"
4 Stirrups #3 6'' 1 55 55 4.00 ' 220.00
Total Quantity = ( Rft ) 1653.00 617.63 0.00 1093.86
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 281.01 187.14 0.00 746.01 1.214 Ton
Total Weight of Bars in Kgs 1214.16
PARAPET WALL
3'' 4'-4.5"
1 Vertical Bars #4 6'' 1 441 441 4.88 ' 2152.08

3'' 249'-6"
1 Horizontal Bars #3 8'' 1 6 6 250.00 ' 1500.00
Total Quantity = ( Rft ) 1500.00 2152.08 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS
Weight of Bars Dia Wise Kgs 255.00 652.08 0.00 0.00
0.907 Ton
Total Weight of Bars in Kgs 907.08
WEIGHT OF TOTAL Weight of Bars Dia Wise Kgs 1917.68500 4221.49296 0.00000 746.01252
6.885 Ton
BARS Total Weight of Bars in Kgs 6885.19

Page 96 of 111
PLOT# 49, SEC-1, PHASE(VIII)

ng the cost of straightening,removing twists, cutting, bending, binding,wastage, and


acing in position on cement concrete complete in all respects.

DULE OF SECOND FLOOR SLAB

BAR SHAPE

Page 97 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

3''

3''

Page 98 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

3''

3''

3''

3''

Page 99 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

Page 100 of 111


DULE OF SECOND FLOOR SLAB

BAR SHAPE

3''

3''

3''

3''

3''

3''

3''

Page 101 of 111


DULE OF SECOND FLOOR SLAB

BAR SHAPE

3''

3''

4.764 Ton

12''

12''

6"x15"
3"

12''

12''
3"

6" x 18"

Page 102 of 111


DULE OF SECOND FLOOR SLAB

BAR SHAPE

12''

12''

6" x 18"

3"
12''

12''

12''

Page 103 of 111


DULE OF SECOND FLOOR SLAB

BAR SHAPE

6" x 21"

3"
4''

4''

12" x 6"

3"
4''

4''

15" x 6"
3"

4''

4''

27" x 6"
3"

Page 104 of 111


DULE OF SECOND FLOOR SLAB

BAR SHAPE

18" x6"

3"
1.214 Ton

3''

3''

0.907 Ton

6.885 Ton

Page 105 of 111


CONSTRUCTION OF 287 GARDEN CITY ( ABDUL WAHEED )
Discription of item.

Providing and laying mild steel reinforcement bars (G-60) with and including the cost of straightening,removing twists, cutting, bending, binding,wastage,
overlaps as are not shown over the drawings, placing in position on cement concrete complete in all respects.

BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

Mummty Floor Slab &


A Beams
Slab
12'-3"
1 Main Bars #3 8'' 1 22 22 12.25 ' 269.50

14'-6"
2 Distribution Bars #3 9'' 1 17 17 14.50 ' 246.50

11'-6"
3 Main Bars #3 9'' 1 25 25 11.50 ' 287.50

18'-1.5"
4 Distribution Bars #4 9'' 1 16 16 18.13 ' 290.00

3'' 5-9"
7 Extras Horz. #4 9'' 1 17 17 6.00 ' 102.00

7'-9"
8 Extras Horz. #4 9'' 1 25 25 7.75 ' 193.75

3'' 4'-9"
9 Extras Horz. #4 9'' 1 25 25 5.00 ' 125.00

3'' 5'-4"
10 Extras Ver. #4 9'' 2 Page 106 of38
19 111 5.58 ' 212.04
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

10 Extras Ver. #4 9'' 2 19 38 5.58 ' 212.04

3'' 6'-9"
11 Extras Ver. #4 9'' 2 16 32 7.00 ' 224.00
Total Quantity = ( Rft ) 803.50 1146.79 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS Weight of Bars Dia Wise Kgs 136.60 347.48 0.00 0.00 0.484 To
Total Weight of Bars in Kgs 484.07
Beam

1 9" Wall

6'' 99'
1 Bottom Bars #4 1 2 2 100.00 ' 200.00

6''
2 Top Bars #4 1 2 2 100.00 ' 200.00 99'

3"
3 Stirrups #3 9'' 1 121 121 2.50 ' 302.500

2 4.5" Wall

6'' 19'
1 Bottom Bars #4 1 2 2 20.00 ' 40.00

6''
2 Top Bars #4 1 2 2 20.00 ' 40.00 19'

3"
Page 107 of 111
3 Stirrups #3 9'' 1 27 27 1.75 ' 47.250
BAR BENDING SCHEDULE OF SECOND FLOOR SLAB

TOTAL LENGTH. (FET)


BAR SPACING Each CUT
B.Mark Description Elements Total Nos BAR SHA
DIA (C/C) Nos LENGTH #3 #4 #5 #6

3 Stirrups #3 9'' 1 27 27 1.75 ' 47.250


Total Quantity = ( Rft ) 349.75 480.00 0.00 0.00
Weight per Rft in Kgs 0.17 0.30 0.47 0.68
WEIGHT OF BARS
Weight of Bars Dia Wise Kgs 59.46 145.44 0.00 0.00
0.205 To
Total Weight of Bars in Kgs 204.90
Weight of Bars Dia Wise Kgs 196.05250 492.91737 0.00000 0.00000
WEIGHT OF TOTAL
BARS
0.689 To
Total Weight of Bars in Kgs 688.97

Page 108 of 111


GARDEN CITY ( ABDUL WAHEED )

the cost of straightening,removing twists, cutting, bending, binding,wastage, and such


ing in position on cement concrete complete in all respects.

DULE OF SECOND FLOOR SLAB

BAR SHAPE

12'-3"

14'-6"

11'-6"

18'-1.5"

5-9"

7'-9"

4'-9"

5'-4"
Page 109 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

6'-9"

0.484 Ton

99' 6''

6''
99'
3"

6" x 6"

19' 6''

6''
19'
3"

6" x 1.5"
Page 110 of 111
DULE OF SECOND FLOOR SLAB

BAR SHAPE

6" x 1.5"

0.205 Ton

0.689 Ton

Page 111 of 111

Вам также может понравиться