1. Start ID Fan by keeping IGV closed. 2. Adjust furnace draught @-40mmwc by opening ID Fan IGV. 3. Start SA Fan by keeping IGV closed. 4. Adjust SA Fan airflow @ 5 to 6 kg/sec.& maintain furnace draught @ -40mmwc. 5. Start any one Roots blower with minimum speed. (30 to 35 % speed reference.) 6. Start PA fan by keeping IGV closed. 7. Increased PA flow up to 17kg/sec.gradually by opening IGV of PA Fan. Adjust furnace draught @ -40mmwc while increasing PA flow. 8. Increase SA flow @ 12 kg/sec. 9. Increase Roots blower speed up to 55% & normalise disch. Pressure. (1800mmwc). 10. Start sand feeding through sand feeder & increase bedht.gradually up to1100mm. 11. Start one HGG with minimum oil firing (250-350 kg/hr.) after raising bed ht. up to700mm.Another HGG should be started only after stable operation of 1st HGG is ensured. Note: Pre condition of HGG start are as under. a) LDO pressure should be greater than 6kg/cm2. b) Compressed air for atomisation should be greaterthan 7 Kg/cm2. c) Differential pressure across the HGG > 25mmWC. d) Total Primary air flow > 14 kg/sec. 12. Increase oil firing in HGG gradually up to 800kg/hr. by observing O/L gas temp. <850Oc. 13. Raise the bed temp. at the rate of 100OC/HR. 14. Charge Imported coal when bed temp. is @ 600 Oc by starting anyone coal feeder at minimum speed.(8% to10% reference of coal feeder) 15. Close all steam side vents when drum pressure increases2 to3 kg/cm2. 16. Close all steam side drains when drum pressure reaches more than 5 kg/cm2. 17. Raise the bed temperature gradually (120Oc/hr)up to 850Oc. 18. At 15 kg/cm2drumpressure close all SH vent v/vs & operate startup ventv/v such that increase of drum pressure can be kept within permissible gradient of 2kg/cm2(g) per min. Overheating of superheater must be avoided. 19. HGG oil firing cut down gradually with raise of bed temp. & Stopped when bed temp. raise up to 850Oc.Also stop LDO pump. 20.Open HGG By Pass Air dampers. Close combustion dampers & dilution dampers after HGG O/L gas temp. < 200oc. 21. Raise the steam pressure (2kg/min.), steam temp. gradually up to 60kg/cm2(g) & 500Oc.by increasing coal feeding & airflow. Control steam pre. & steam temp. by operating start up vent v/v. 22.Start another coal feeder with minimum speed if required. 23.Charge ESP when Flue gas temp. at Air Preheater Outlet reaches up to 120Oc. 24.Start ESP Ash recirculation feeder & ESP 1 st field denseveyor towards intermediate ash silo when bed temp.>850 Oc.to control bed temp. Also modulate PA flow & SA flows to control bed temp, steam pressure & steam temp. 25.Take Air Heater in line when Air Heater O/L gas temp. reaches up to 1300c to minimize Air Heater cold end corrosion. 26.Open bypass of main steam stop v/v at pre.58Kg/cm2. & allow line heating for at least 10mins. Maintain Boiler pressure 2 to 3 kg/cm2 less than running boiler (AFBC) by modulating start up vent v/v. Also check that steam temp. difference of both boilers is less then 30Oc at the time of parallelling CFBC. ( not less than470 Oc). Then open MSSV fully.
Note: Ensure following points before connecting incoming Boiler
(CFBC) with AFBC. 1. TG tripping interlock must be in line for steam temp. Very low . 2. Incoming Boiler is healthy in respect of Control & instrumentation. 3. Incoming Boiler pressure less than 2 to 3 kg/cm 2.of running Boiler. 4. Steam temperature difference of incoming Boiler and running Boiler is less then 30OC.
27. Start HP dosing in boiler to increase PH of Boiler drum water.