Академический Документы
Профессиональный Документы
Культура Документы
Security Directives
for Industrial Facilities
2017
RESTRICTED
All Rights reserved to HCIS. Copying or distribution prohibited without written permission from HCIS
SEC-19
Residential Compounds for Industrial Facilities
Version 1.0
Security Directives
for Industrial Facilities
2017
RESTRICTED
All Rights reserved to HCIS. Copying or distribution prohibited without written permission from HCIS
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
Version 1.0
Page 2 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
Version History
This Security Directive supersedes all previous Security Directives issued by the High
Commission for Industrial Security (HCIS), Ministry of Interior.
Version 1.0
Page 3 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
Version 1.0
Page 4 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
Table of Contents
1 PURPOSE ................................................................................................................................................ 7
2 SCOPE ..................................................................................................................................................... 7
3 ACRONYMS & DEFINITIONS .................................................................................................................... 7
4 REFERENCES ........................................................................................................................................... 7
5 GENERAL REQUIREMENTS ...................................................................................................................... 8
5.1. COMPOUND DEFINITION ............................................................................................................................ 8
5.2. OTHER HCIS REGULATIONS ........................................................................................................................ 8
5.3. SECURITY INFRASTRUCTURE ........................................................................................................................ 8
5.3.1. Perimeter Boundary ........................................................................................................................ 8
5.3.2. Gates ............................................................................................................................................... 9
5.3.3. Lighting ........................................................................................................................................... 9
5.4. SECURITY SYSTEMS ................................................................................................................................. 10
5.5. FIRE PROTECTION ................................................................................................................................... 10
5.6. PROCEDURES ......................................................................................................................................... 10
6 PROOF OF COMPLIANCE ....................................................................................................................... 11
Version 1.0
Page 5 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
Version 1.0
Page 6 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
1 Purpose
This document provide requirements for security of residential compounds at industrial
facilities.
2 Scope
This directive provides Facility Operators (FO) with specific security requirements for
implementation at residential compounds for industrial facilities.
4 References
This directive adopts the latest edition of the references listed.
Version 1.0
Page 7 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
5 General Requirements
Residential compounds for industrial facilities shall not be constructed within the
operational area perimeter of the industrial facility. FO shall use the requirements stated
in SAF-06 to determine the minimum distance the residential compound perimeter shall
be located from the operational area perimeter.
Location
Compound size (m2)
Number of residential units
Type (Family/bachelor)
Tenant demographics (nationality)
A 6m clear zone shall be located on both sides of the fence. The clear zone
refers to an area, adjacent to the perimeter boundary, cleared of all
Version 1.0
Page 8 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
5.3.2. Gates
Gates leading into the facility shall incorporate the following elements:
5.3.3. Lighting
The perimeter boundary, gate area and internal facility areas shall be
adequately illuminated with area lighting systems as specified in SEC-04.
Version 1.0
Page 9 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
5.4.1. If large areas inside the facility are not developed then VASS cameras shall
be deployed to monitor this area.
5.4.2. All video imagery shall be analyzed by a video analytics system that shall
annunciate an alarm at the gatehouse and/or local SCC.
5.4.3. All video imagery shall be recorded for 30 day period.
5.4.4. VASS systems and components shall comply with SEC-05 requirements.
5.6. Procedures
FO shall compile proper security policy and procedures for the access control of all
personnel, including contractors that need access to the compound.
FO shall have a complete set of procedures that include post orders, patrols and
emergency response scenarios to manage compound security.
Version 1.0
Page 10 of 12
Kingdom of Saudi Arabia
Ministry of Interior َوز َارة الداخليـَّـة
High Commission for Industrial Security اهليئة العليا لألمن الصناعي
Secretariat General األمانة العامة
SEC-19 Residential Compounds for Industrial Facilities
6 Proof of Compliance
FO shall provide HCIS with a Proof of Compliance (PoC), as part of the Stage 3 workflow,
to explain and demonstrate how the FO is complying with specific requirements in this
directive. This will augment the Stage 3 submission which covers all items.
This PoC shall provide details for each of the requirements listed below. PoC submissions
shall be supported with manufacturer’s brochures or catalogs ONLY where they are
relevant to the response.
In all cases the responses shall be specific in nature and include adequate technical details
to demonstrate compliance to HCIS:
SEC-19
Requirement FO Response
Reference
1. 5.1 Compound Definition Provide requested details
2. 5.3 Security Infrastructure Provide details
3. 5.4 Security Systems Provide details
4. 5.5 Fire Protection Provide overview of fire protection design
5. 5.6 Procedures Provide a list of procedures for security personnel at
the compound
Version 1.0
Page 11 of 12
Ministry of Interior
High Commission for Industrial Security
Riyadh
Kingdom of Saudi Arabia