Академический Документы
Профессиональный Документы
Культура Документы
Objective
Profile
I have 08 Years Self-motivated, team oriented and Highly Professional, experienced
and Skilled in Instrumentation Construction, Troubleshooting, Maintenance,
commissioning and Pre- Commissioning of Instruments experience in large scale of
Power Plant, Oil and Gas Pipe line Industries, Ability to learn quickly, follow the
procedure exactly, solve The problems independently and always willing to accept
significant responsibility and involvement and working knowledge of international codes
and QA/QC standards and their application to the operation.
Professional Experience
ORASCOM Co Ltd.
At BAIJI Power Plant (960 MW) SIEMENS SGT 2000E, Iraq
Client Ministry of Electricity Iraq (MOE)
Project BAIJI Power Plant
Position I & C Commissioning Foreman
Location Iraq
Duration 13 Jan 2014 to 05 Dec 2014
Responsibilities:
Commissioning of GT field Instruments such as thermocouples RTD’s, pressure transmitter,
pressure switches, DP switchers vibration sensors, flame sensors, humming sensors flow switches
& leakage sensors.
Hot loop checked & cold loop checked.
Commissioning of fuel forwarding field Instruments
Commissioning and troubleshooting of MOV’s & control valves
Following the approved testing and commissioning schedules.
Assist SIEMENS instruments and GT mechanical engineer.
Testing and commissioning of DCS (SPPA T3000) signals.
Preventive maintenance of field instruments.
Field and Bench Calibrations of different Instruments.
4000 MW Qurayyah Combined Cycle Power Plant being constructed adjacent to the existing
Qurayyah Power Plant approximately 100 km south of Dammam. The project comprises 18 GE frame
7FA gas turbines and 6 GE D11 Steam turbines consisting of 6 blocks, three gas turbines, related
HRSGs and 1 steam turbine to each block
At Qurrayyah CCPP (4000MW) Project Dammam, KSA
Client Saudi Electric Company (SEC)
Project Qurrayyah Combined Cycle Power plant
Position I & C Foreman
Location Saudi Arabia
Duration 09 Jan 2011 to 05 Dec 2013
Duties and responsibilities:
Installation of GT field Instruments such as thermocouples RTD’s, pressure transmitter, pressure
switches, DP switchers vibration sensors, flame sensors, humming sensors flow switches &
leakage sensors.
Commissioning and troubleshooting of MOV’s & control valves
Following the approved testing and commissioning schedules.
Preparing test result sheets and reporting to Engineer.
Testing instrument and troubleshooting.
Hot loop checking & cold loop cheek.
Internal, AC loop and DC loop wiring test of panels.
Commissioning & troubleshooting of MV/LV switchgears & motors of STG & HRSG
STG (Steam turbine D11) commissioning.
Analog i/o and digital i/o All signal check and loop test.
Energized Mark-6 Panel.
Personal Training:
Qualification:
Institution Major Evaluation Tenure
Rawalpindi Swedish
Diploma of Associate 76% marks,
Institute of
Engineer in Electrical A Grade 2006 to 2009
Technology, Pakistan.
(PBTE) Technology
Govt.Boy High School
SSC Science 56% marks, March 2005
Sahlian. Azad
Physics, Math, B Grade To
Jammu & Kashmir
Chemistry English 2nd Division March 2003
Personal Data: