Son La Bridge – Vietnam

An application of the VSL tension member system

▲ Son La stay bar bridge – the first bridge of this type in Vietnam

▲ The Son La Bridge has been built as part of a programme to develop transportation in rural areas.
.

The province of Son La has invested Son La Bridge is a steel-concrete


in the building of Son La Bridge, composite structure with two H-
which uses advanced technology in shaped steel pylons, a steel deck and
the form of the VSL tension member a concrete deck slab. The whole
system. The bridge is part of a bridge is 66m long and 7.5m wide,
national programme of stayed with a 36m-long centre span. Each
bridges to develop transportation in pylon is 10.5m high.
rural areas.
The design load is H13 to meet the
A clear advantage has been the 22TCN 221-95 design code.
proximity of VSL’s supply centre in
Singapore, with its large stock of VSL’s CT Stressbar system is used
stressbars and a wide range of for the 24 stays that support the
corresponding accessories. bridge. VSL Vietnam supplied 63 CT
Stressbars with diameters of 73mm,
56mm and 40mm, in lengths that
varied from 5.059m to 8.766m.
Scope of works performed
Using the VSL tension members
• Fatigue test for the CT Stressbar as main and back stays enabled
- full system testing with 45% the designers to create an
GUTS and 500,000 cycles aesthetically-superior and cost- ▲ The forked clevises at the top of the
• Supply of CT Stressbar and effective support system in this stays allowed for easy installation
accessories remote mountainous area. at this elevated location.
• Supply of shop drawings, method
statement and technical
assistance during installation
ID 1391
VSL tension members have proven OWNER
to be one of the most popular tools Son La Province
for engineers wishing to control loads
and forces in structures. In addition, MAIN CONTRACTOR
their fast installation has been shown Civil Engineering & Trading
to have a positive economic Company
influence on the construction
programme. .VSL ENTITY
VSL Vietnam Ltd.
VSL has been manufacturing high
quality architectural tension member DATE
components for more than 20 years 2001 – 2002
and can draw on complete and
widely-ranging experience.

▲ The bridge has been designed to


accommodate two lanes of traffic.
▼ General view of the bridge
VSL’s manufacturing facility
produces a full range of components
to ISO 9002. This provides a fully
compatible system giving ease of
erection and consistent high quality
throughout the project.

VSL is particularly proud to develop


project-specific solutions that meet
the challenges of today’s highly
competitive market conditions.

In this particular case, VSL has


proved that its experience and
expertise extend beyond the supply
of components. As a professional
post-tensioning business ,VSL can
provide its know-how throughout the
entire process of stressbar
▼ The bridge has steel pylons and a
steel deck structure with stressbar
The VSL tension member system installation.
stays. uses high tensile bars and
engineered connection fittings to
provide aesthetic and efficient
structural solutions for tension
member applications.

▲ The VSL tension member provides a


very cost-effective and aesthetic
solution.
Edited 2008

www.vsl.com
ID 1391

Вам также может понравиться