5
4
3
2
1
A
11
16
15
14
13
12
10
LAYOUT-1
Span lenth
30
40
50
50
50
50
50
50
50
50
50
50
50
50
45
50
AAAC 7/3.15mm CON
90
120
150
150
150
150
150
150
150
150
150
150
150
150
165
150
PSC Pole 9mt
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
2
2
1
Tapping Channel
HT POLE SCHEDULE
HT TI Fitting
1
1
1
1
1
1
1
1
1
1 11 KV Disc With Metal Parts
3
6
6
6
6
6
3
1
1
1
1
1
1
1
1
1
1
1
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
1
2
2
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
X-
proposed
AB Switch
19 50 150 1 1 1 3 1 1
20 50 150 1 1 1 3 1 1
21 50 150 1 1 1 3 1 1
22 50 150 1 1 1 3 1 1
23 50 150 1 1 1 3 1 1
24 50 150 1 1 6 3 1 2 1
25 50 150 1 1 1 3 1 1
26 50 150 1 1 1 3 1 1
27 50 150 1 1 6 3 1 1 1
1265 3825 26 14 18 51 19 78 32 1 17 28
sag 3% 115
14
TOTAL 3940 26 18 51 19 78 32 1 17 28
XLPE
Termination kit
V Trough
CABLE
120SQ
SPAN
LOC
MM
27-F 50 50 40 10 2
DETAILED ESTIMATE FOR EXTENSION OF 11 KV SUPPLY TO M/S. Mailam
Murugan Mines FOR A DEMAND OF 1000KVA AT Nerkunapattu , in respect of
Koovathur section.
Sl.No Description Qty Rate Per Amount
1 AAAC7/3.15 Conductor 3940 30000 KM 118200.00
2 PSC 9 m pole 26 3228 Each 83928.00
3 Tapping channel 14 1031 Each 14434.00
4 HT TI Fitting 18 205 Each 3690.00
5 11 KV Disc with metal parts 51 472 Each 24072.00
6 11 KV V Cross Arm 19 813 Each 15447.00
7 11 KV Pin Insulator with Pin 78 106 Each 8268.00
8 Back clamp 9 mtr 32 142 Each 4544.00
9 Back clamp 9 .14mtr 1 109 Each 109.00
10 Stay set Complete 17 1268 Loc 21556.00
11 MS Bold & Nut 28 807 Loc 22596.00
Sub Total 316844.00
Contingencies @ 1% 3168.44
Sub-total 320012.44
Labour and transport 15% 48001.87
Sub-total 368014.31
Esst & Supervision 15% 55202.1459
Sub-total 423216.45
TOTAL 423220.00
Credit 0.00
TOTAL 423220.00
LAYING OF HT UG CABLE
SL NO Description Oty Rate Per
11 KV 3 X 120 sq mm XLPE UG
1 50 639000.00 Km
cable
sub total
contingencies 1%
sub total
sub total
Total
OR SAY Rs.
Amount
31950.00
36424.00
1710.00
5784.00
75868.00
758.68
76626.68
11494.00
88120.68
13218.10
101338.78
101340.00
ERECTION OF 1 NO 11 KV DP STRUCTURE AT Loc F WITH 11 KV METERING
ARRANGEMENT
11 KV AB Switch with PT
2 1 13983.00 each
Insulator
sub total
sub total
OR SAY Rs
oc F WITH 11 KV METERING
Consumer
Board side
side
10806.00 0
13983.00 0
1626.00 0
6947.00 0
218.00 0
410.00 0
3604.00 0
848.00 0
5072.00 0
0.00 54000.00
0.00 27400.00
1455.00 0
2050.00 0
5371.00 0
2421.00 0.00
54811.00 81400.00
2740.55 814.00
57551.55 82214.00
17265.465 12332.10
74817.02 94546.10
16459.7433 14181.92
91276.76 108728.02
91280.00 108730.00
CALCULATION OF VOLTAGE REGULATION FOR NEWLY PROPOSED 11 KV FEEDER
LF 0.4
DF 1.5
KV 11
Voltage Reg
2.322
EOS TO 1 NO HT SERVICE TO M/S.MAILAM MURGAN MINES AT
NERGUNAPATTU VILLAGE
737140.00 91280
Gross 828420.00
Consumer 91280