IMS Explorations

FIELD BORE LOG CHART


PROJECT:
R.L. : C.H. No. :
DATE : Water table : BORE HOLE No :
CLIENT : C Rod Size : Dia of Bore :
Remarks
Depth (M)
Length of Pressure 5 To 10 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 10 To 15 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT Readings
From To

1
IMS Explorations
FIELD BORE LOG CHART
PROJECT:
R.L. : C.H. No. :
DATE : Water table : BORE HOLE No :
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore :

Depth (M)
Length of Run Pressure 5 To 10 Minits 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT Lugeon Value
(M) Kg/sq.cm LT LT Readings
From To

2
IMS Explorations
FIELD BORE LOG CHART
PROJECT:
R.L. : C.H. No. :
DATE : Water table : BORE HOLE No :
CLIENT : Rod Size : Dia of Bore :

Depth (M)
Length of Pressure 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT Readings
From To

3
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : 82.79 C.H. No. :
DATE : 17-12-2009 Water table : 9.60 BORE HOLE No : RBBHC1
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Start Pressure 0 To 5 5 To 10 Minits 10 To 15 Average of Last
S.No. End Time Head Level Lugeon Value
(M) Time Kg/sq.cm Minits LT LT Minits LT Two Readings
From To

1 22.00 19.00 3.00 3.10 3.25 1.40 0.5 151 151 150 151 201

2 -do- -do- -do- 3.25 3.40 1.40 1.0 160 159 158 159 106

3 -do- -do- -do- 3.45 4.00 1.40 1.5 167 166 165 166 74

4 -do- -do- -do- 4.00 4.15 1.40 1.0 161 162 160 161 107

5 -do- -do- -do- 4.15 4.30 1.40 0.5 147 144 143 144 191

4
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : 82.79 C.H. No. :
DATE : 17-12-2009 Water table : 9.60 BORE HOLE No: RBBHC1
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT Readings
From To

1 25.00 22.00 3 Mtr 11.00 11.15 1.35 0.5 149 149 148 149 198

2 -do- -do- -do- 11.15 11.30 1.35 1.0 155 154 154 154 103

3 -do- -do- -do- 11.30 11.45 1.35 1.5 165 164 163 164 73

4 -do- -do- -do- 11.45 12.00 1.35 1.0 154 152 152 152 101

5 -do- -do- -do- 12.10 12.25 1.35 0.5 144 144 144 144 192

1 28.00 25.00 3 Mtr 9.45 10.00 1.3 0.5 110 110 109 110 146

2 -do- -do- -do- 10.15 10.20 1.3 1.0 115 115 114 115 76

3 -do- -do- -do- 10.20 10.35 1.3 1.5 121 121 121 121 54

4 -do- -do- -do- 10.40 10.55 1.3 1.0 114 114 114 114 76

5 -do- -do- -do- 10.55 11.00 1.3 0.5 109 109 108 109 145

1 31.00 28.00 3 Mtr 8.00 8.15 1.3 0.5 145 144 144 144 192

2 -do- -do- -do- 8.15 8.30 1.3 1.0 158 158 157 158 105

3 -do- -do- -do- 8.40 8.55 1.3 1.5 167 167 166 167 74

4 -do- -do- -do- 8.55 9.10 1.3 1.0 157 156 156 156 104

5 -do- -do- -do- 9.10 9.25 1.3 0.5 144 143 143 143 191

5
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : 82.79 C.H. No. :
DATE : 17-12-2009 Water table : 9.60 BORE HOLE No : RBBHC1
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 5 To 10 Minits 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT LT Readings
From To

1.00 34.00 31.00 3 Mtr 4.30 4.45 1.40 0.50 152.00 152.00 151.00
152 202

2.00 -do- -do- -do- 4.45 5.00 1.40 1.00 161.00 160.00 160.00
160 107

3.00 -do- -do- -do- 5.00 5.15 1.40 1.50 169.00 168.00 168.00
168 75

4.00 -do- -do- -do- 5.15 5.30 1.40 1.00 160.00 159.00 159.00
159 106

5.00 -do- -do- -do- 5.30 5.45 1.40 0.50 148.00 146.00 146.00
146 195

1.00 37.00 34.00 3 Mtr 2.40 2.55 1.30 0.50 148.00 148.00 148.00
148 197

2.00 -do- -do- -do- 2.55 3.10 1.30 1.00 155.00 120.00 110.00
115 77

3.00 -do- -do- -do- 3.15 3.30 1.30 1.50 164.00 163.00 163.00
163 72

4.00 -do- -do- -do- 3.30 3.45 1.30 1.00 158.00 157.00 158.00
158 105

5.00 -do- -do- -do- 3.55 4.10 1.30 0.50 145.00 144.00 144.00
144 192

1.00 40.00 37.00 3 Mtr 1.00 1.15 1.40 0.50 150.00 155.00 150.00
153 203

2.00 -do- -do- -do- 1.15 1.30 1.40 1.00 162.00 162.00 162.00
162 108

3.00 -do- -do- -do- 1.30 1.45 1.40 1.50 170.00 170.00 170.00
170 76

4.00 -do- -do- -do- 1.50 2.05 1.40 1.00 162.00 162.00 162.00
162 108

5.00 -do- -do- -do- 2.05 2.20 1.40 0.50 150.00 149.00 149.00
149 199

6
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 05-01-2010 Water table : 7.10 BORE HOLE No : RBBHC2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
(M) Kg/sq.cm LT Readings
From To

1 22.00 19.00 3 Mtr 12.05 12.20 1.4 0.5 54 52 52 52 69

2 -do- -do- -do- 12.20 12.35 1.4 1.0 58 58 57 58 38

3 -do- -do- -do- 12.35 12.50 1.4 1.5 60 61 61 61 27

4 -do- -do- -do- 1.00 1.15 1.4 1.0 58 58 57 58 38

5 -do- -do- -do- 1.15 1.30 1.4 0.5 52 51 50 51 67

7
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 05-01-2010 Water table : 7.10 BORE HOLE No : RBBHC2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure Average of Last
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value
(M) Kg/sq.cm Two Readings
From To

1 25.00 22.00 3 Mtr 4.20 4.35 1.4 0.5 52 50 50 50 67

2 -do- -do- -do- 4.35 4.50 1.4 1.0 54 54 54 54 36

3 -do- -do- -do- 4.55 5.10 1.4 1.5 58 58 58 58 26

4 -do- -do- -do- 5.10 5.25 1.4 1.0 52 50 51 51 34

5 -do- -do- -do- 5.25 5.40 1.4 0.5 47 47 46 47 62

1 28.00 25.00 3 Mtr 2.55 3.10 1.4 0.5 48 47 47 47 63

2 -do- -do- -do- 3.10 3.25 1.4 1.0 53 54 53 54 36

3 -do- -do- -do- 3.25 3.40 1.4 1.5 60 58 58 58 26

4 -do- -do- -do- 3.45 3.50 1.4 1.0 52 52 52 52 35

5 -do- -do- -do- 3.50 4.05 1.4 0.5 46 46 45 46 61

1 31.00 28.00 3 Mtr 12.30 12.45 1.4 0.5 54 52 52 52 69

2 -do- -do- -do- 12.45 1.00 1.4 1.0 56 56 56 56 37

3 -do- -do- -do- 1.30 1.45 1.4 1.5 60 60 60 60 27

4 -do- -do- -do- 1.45 2.00 1.4 1.0 54 53 53 53 35

5 -do- -do- -do- 2.15 2.30 1.4 0.5 50 49 50 50 66

8
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 05-01-2010 Water table : 7.10 BORE HOLE No : RBBHC2
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level Lugeon Value Remarks
Run (M) Kg/sq.cm LT LT LT Readings
From To

1 34.00 31.00 3 Mtr 10.35 10.50 1.3 0.5 55 54 54 54 72

2 -do- -do- -do- 11.00 11.15 1.3 1.0 58 58 58 58 39

3 -do- -do- -do- 11.15 11.30 1.3 1.5 62 62 62 62 28

4 -do- -do- -do- 11.30 11.35 1.3 1.0 57 56 56 56 37

5 -do- -do- -do- 11.35 11.50 1.3 0.5 53 52 52 52 69

1 37.00 34.00 3 Mtr 9.05 9.20 1.4 0.5 60 60 58 59 79

2 -do- -do- -do- 9.20 9.35 1.4 1.0 66 65 65 65 43

3 -do- -do- -do- 9.35 9.50 1.4 1.5 75 74 74 74 33

4 -do- -do- -do- 9.50 10.05 1.4 1.0 65 64 64 64 43

5 -do- -do- -do- 10.05 10.20 1.4 0.5 59 59 59 59 79

1 40.00 37.00 3 Mtr 7.20 7.35 1.4 0.5 180 180 178 179 239

2 -do- -do- -do- 7.35 7.50 1.4 1.0 190 189 188 189 126 38 Mtr

3 -do- -do- -do- 7.50 8.05 1.4 1.5 200 170 158 164 73 50% Water Loss

4 -do- -do- -do- 8.15 8.30 1.4 1.0 190 188 186 187 125

5 -do- -do- -do- 8.30 8.45 1.4 0.5 178 177 176 177 235

9
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 22-01-2010 Water table : 17.40 BORE HOLE No: RBBHC3

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm Readings
From To

1 19.00 16.00 3 Mtr 11.15 11.30 1.5 0.5 205 204 203 204 271

2 -do- -do- -do- 11.30 11.45 1.5 1.0 215 214 213 214 142

3 -do- -do- -do- 11.45 12.00 1.5 1.5 220 220 220 220 98

4 -do- -do- -do- 12.00 1.5 1.0 214 213 212 213 142

5 -do- -do- -do- 12.20 12.35 1.5 0.5 204 202 202 202 269

1 22.00 19.00 3 Mtr 9.20 9.35 1.5 0.5 167 166 166 166 221

2 -do- -do- -do- 9.35 9.50 1.5 1.0 160 168 167 168 112

3 -do- -do- -do- 9.55 10.10 1.5 1.5 167 168 177 173 77

4 -do- -do- -do- 10.10 10.25 1.5 1.0 162 160 159 160 106

5 -do- -do- -do- 10.30 10.45 1.5 0.5 160 159 158 159 211

10
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 22-01-2010 Water table : 17.40 BORE HOLE No : RBBHC3

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
Run (M) Kg/sq.cm LT LT LT Two Readings
From To

1 25.00 22.00 3 Mtr 4.35 4.50 1.5 0.5 177 176 176 176 235

2 -do- -do- -do- 4.50 5.05 1.5 1.0 170 178 177 178 118

3 -do- -do- -do- 5.10 5.25 1.5 1.5 177 178 176 177 79

4 -do- -do- -do- 5.25 4.50 1.5 1.0 172 170 169 170 113

5 -do- -do- -do- 5.40 5.55 1.5 0.5 160 161 161 161 215

1 28.00 25.00 3 Mtr 2.50 3.05 1.5 0.5 197 196 195 196 261

2 -do- -do- -do- 3.05 3.20 1.5 1.0 205 204 203 204 136

3 -do- -do- -do- 3.30 3.45 1.5 1.5 214 213 212 213 94

4 -do- -do- -do- 3.45 4.00 1.5 1.0 205 204 203 204 136

5 -do- -do- -do- 4.00 4.15 1.5 0.5 196 194 192 193 257

1 31.00 28.00 3 Mtr 1.15 1.30 1.5 0.5 98 97 96 97 129

2 -do- -do- -do- 1.30 1.45 1.5 1.0 108 107 106 107 71

3 -do- -do- -do- 1.45 2.00 1.5 1.5 114 113 113 113 50

4 -do- -do- -do- 2.00 2.15 1.5 1.0 107 106 106 106 71

5 -do- -do- -do- 2.15 2.30 1.5 0.5 98 96 95 96 127

11
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 22-01-2010 Water table : 17.40 BORE HOLE No : RBBHC3

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
(M) Kg/sq.cm LT LT LT Two Readings
From To

1 34.00 31.00 3 Mtr 11.30 11.45 1.5 0.5 98 97 99 97 129

2 -do- -do- -do- 11.45 12.00 1.5 1.0 108 107 96 107 71

3 -do- -do- -do- 12.00 12.15 1.5 1.5 114 113 106 113 50

4 -do- -do- -do- 12.25 12.40 1.5 1.0 107 106 113 106 71

5 -do- -do- -do- 12.40 12.55 1.5 0.5 98 96 106 96 127

1 37.00 34.00 3 Mtr 9.55 10.10 1.5 0.5 111 100 95 98 133

2 -do- -do- -do- 10.10 10.25 1.5 1.0 105 104 104 104 69

3 -do- -do- -do- 10.25 10.40 1.5 1.5 110 109 108 109 48

4 -do- -do- -do- 10.40 10.55 1.5 1.0 103 102 103 103 68

5 -do- -do- -do- 10.55 11.10 1.5 0.5 100 99 99 99 132

1 40.00 37.00 3 Mtr 8.15 8.30 1.5 0.5 198 197 196 197 262

2 -do- -do- -do- 8.30 8.45 1.5 1.0 210 209 208 209 139

3 -do- -do- -do- 8.50 9.05 1.5 1.5 218 217 216 217 96

4 -do- -do- -do- 9.05 9.20 1.5 1.0 218 207 206 207 138

5 -do- -do- -do- 9.20 9.35 1.5 0.5 196 195 194 195 259

12
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 23-01-2010 Water table : 15.60 BORE HOLE No : RBBHC4

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits Average of Last Two
S.No. Start Time End Time Head Level 10 To 15 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Readings
From To

Last Reading Pre, Reading


1 22.00 19.00 3 Mtr 0.5 80 82 80 81 108
9707 9949

2 -do- -do- -do- 10207 1.0 88 86 84 85 57

3 -do- -do- -do- 10422 1.5 95 60 60 60 27

4 -do- -do- -do- 10696 1.0 90 92 92 92 61

5 -do- -do- -do- 10955 0.5 88 86 85 86 114

1 25.00 22.00 3 Mtr 4.40 4.55 1.5 0.5 169 168 167 168 223

2 -do- -do- -do- 4.55 5.10 1.5 1.0 172 171 170 171 114

3 -do- -do- -do- 5.10 5.25 1.5 1.5 182 180 181 181 80

4 -do- -do- -do- 5.25 5.40 1.5 1.0 170 169 168 169 112

5 -do- -do- -do- 5.40 5.55 1.5 0.5 154 153 115 134 179

13
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 23-01-2010 Water table : 15.60 BORE HOLE No : RBBHC4

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
(M) Kg/sq.cm LT LT LT Two Readings
From To

1 28.00 25.00 3 Mtr 3.00 3.15 1.4 0.5 111 110 109 110 146

2 -do- -do- -do- 3.15 3.30 1.4 1.0 115 114 114 114 76

3 -do- -do- -do- 3.30 3.45 1.4 1.5 122 122 121 122 54

4 -do- -do- -do- 3.50 4.05 1.4 1.0 114 111 111 111 74

5 -do- -do- -do- 4.05 4.20 1.4 0.5 110 109 106 108 143

1 31.00 28.00 3 Mtr 1.20 1.35 1.4 0.5 70 69 68 69 91

2 -do- -do- -do- 1.35 1.50 1.4 1.0 69 69 69 69 46

3 -do- -do- -do- 1.50 2.05 1.4 1.5 80 82 81 82 36

4 -do- -do- -do- 2.05 2.20 1.4 1.0 70 69 62 66 44

5 -do- -do- -do- 2.20 2.35 1.4 0.5 61 59 58 59 78

1 34.00 31.00 3 Mtr 11.40 11.55 1.4 0.5 190 191 191 191 255

2 -do- -do- -do- 11.55 12.10 1.4 1.0 199 198 197 198 132

3 -do- -do- -do- 12.10 12.25 1.4 1.5 206 205 203 204 91

4 -do- -do- -do- 12.25 12.40 1.4 1.0 197 196 193 195 130

5 -do- -do- -do- 12.40 12.55 1.4 0.5 187 185 183 184 245

14
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 23-01-2010 Water table : 15.60 BORE HOLE No : RBBHC4

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT Two Readings
From To

1 37.00 34.00 3 Mtr 10.00 10.15 1.5 0.5 90 89 88 89 118

2 -do- -do- -do- 10.15 10.30 1.5 1.0 96 95 94 95 63

3 -do- -do- -do- 10.35 10.50 1.5 1.5 100 100 99 100 44

4 -do- -do- -do- 10.50 11.05 1.5 1.0 97 97 96 97 64

5 -do- -do- -do- 11.05 11.20 1.5 0.5 89 88 87 88 117

1 40.00 37.00 3 Mtr 8.10 8.25 1.5 0.5 171 165 152 159 211

2 -do- -do- -do- 8.25 8.40 1.5 1.0 188 187 170 179 119

3 -do- -do- -do- 8.40 8.55 1.5 1.5 196 195 194 195 86

4 -do- -do- -do- 8.55 9.10 1.5 1.0 187 185 176 181 120

5 -do- -do- -do- 9.20 9.35 1.5 0.5 162 160 150 155 207

15
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 19-01-2010 Water table : 0.00 BORE HOLE No : RBBHC5

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
(M) Kg/sq.cm LT LT LT Two Readings
From To

1 7.00 5.50 1.5 Mtr 4.40 4.55 1.3 0.5 60 61 61 61 163

2 -do- -do- -do- 4.55 5.10 1.3 1.0 70 70 69 70 93

3 -do- -do- -do- 5.10 5.25 1.3 1.5 78 77 76 77 68

4 -do- -do- -do- 5.25 5.40 1.3 1.0 69 68 67 68 90

5 -do- -do- -do- 5.40 5.55 1.3 0.5 58 57 54 56 148

1 10.00 7.00 3 Mtr 3.10 3.25 1.5 0.5 110 112 112 112 149

2 -do- -do- -do- 3.25 3.40 1.5 1.0 120 120 119 120 80

3 -do- -do- -do- 3.40 3.55 1.5 1.5 128 127 126 127 56

4 -do- -do- -do- 3.55 4.10 1.5 1.0 118 116 115 116 77

5 -do- -do- -do- 4.10 4.25 1.5 0.5 108 107 106 107 142

1 13.00 10.00 3 Mtr 1.30 1.45 1.5 0.5 171 161 150 156 207

2 -do- -do- -do- 1.45 2.00 1.5 1.0 187 86 170 128 85

3 -do- -do- -do- 2.00 2.15 1.5 1.5 197 193 194 194 86

4 -do- -do- -do- 2.20 2.35 1.5 1.0 185 183 182 183 122

5 -do- -do- -do- 2.35 2.50 1.5 0.5 166 166 165 166 221

16
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 20-01-2010 Water table : 0.00 BORE HOLE No: RBBHC5

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
(M) Kg/sq.cm LT LT LT Two Readings
From To

1 16.00 13.00 3 Mtr 11.40 11.55 1.5 0.5 90 89 88 89 118

2 -do- -do- -do- 11.55 12.10 1.5 1.0 98 98 97 98 65

3 -do- -do- -do- 12.15 12.30 1.5 1.5 105 104 103 104 46

4 -do- -do- -do- 12.30 12.45 1.5 1.0 192 96 96 96 64

5 -do- -do- -do- 12.30 1.05 1.5 0.5 88 87 86 87 115

1 19.00 16.00 3 Mtr 10.00 10.15 1.5 0.5 171 167 154 161 214

2 -do- -do- -do- 10.15 10.30 1.5 1.0 187 186 179 183 122

3 -do- -do- -do- 10.35 10.50 1.5 1.5 197 194 195 195 86

4 -do- -do- -do- 10.50 11.05 1.5 1.0 186 185 183 184 123

5 -do- -do- -do- 11.05 11.20 1.5 0.5 168 168 168 168 224

1 22.00 19.00 3 Mtr 8.15 8.30 1.5 0.5 172 170 174 172 229

2 -do- -do- -do- 8.30 8.45 1.5 1.0 182 180 184 182 121

3 -do- -do- -do- 8.50 9.05 1.5 1.5 197 196 189 193 86

4 -do- -do- -do- 9.10 9.25 1.5 1.0 195 194 189 192 128

5 -do- -do- -do- 9.25 9.40 1.5 0.5 180 180 179 180 239

17
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 19-01-2010 Water table : 0.00 BORE HOLE No : RBBHC5

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 0 To 5 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 25.00 22.00 3 Mtr 4.30 4.45 1.5 0.5 161 162 162 162 216

2 -do- -do- -do- 4.45 5.60 1.5 1.0 182 183 182 183 122

3 -do- -do- -do- 5.10 5.25 1.5 1.5 201 200 200 200 89

4 -do- -do- -do- 5.25 5.40 1.5 1.0 181 180 179 180 120

5 -do- -do- -do- 5.40 5.55 1.5 0.5 160 160 159 160 213

1 28.00 25.00 3 Mtr 2.55 3.10 1.5 0.5 171 166 154 160 213

2 -do- -do- -do- 3.10 3.25 1.5 1.0 187 186 178 182 121

3 -do- -do- -do- 3.25 3.40 1.5 1.5 196 195 194 195 86

4 -do- -do- -do- 3.40 3.55 1.5 1.0 186 184 167 176 117

5 -do- -do- -do- 3.55 4.10 1.5 0.5 164 158 152 155 207

1 31.00 28.00 3 Mtr 1.10 1.25 1.5 0.5 172 170 150 160 213

2 -do- -do- -do- 1.25 1.40 1.5 1.0 182 181 180 181 120

3 -do- -do- -do- 1.50 2.05 1.5 1.5 198 197 190 194 86

4 -do- -do- -do- 2.05 2.20 1.5 1.0 196 195 190 193 128

5 -do- -do- -do- 2.20 2.35 1.5 0.5 179 180 178 179 239

18
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 19-01-2010 Water table : 0.00 BORE HOLE No : RBBHC5

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 34.00 31.00 3 Mtr 11.25 11.40 1.5 0.5 172 168 155 162 215

2 -do- -do- -do- 11.40 11.55 1.5 1.0 188 187 180 184 122

3 -do- -do- -do- 11.55 12.10 1.5 1.5 198 197 196 197 87

4 -do- -do- -do- 12.20 12.35 1.5 1.0 187 185 168 #VALUE!

5 -do- -do- -do- 12.35 12.50 1.5 0.5 166 160 150 155 207

1 37.00 34.00 3 Mtr 9.40 9.55 1.5 0.5 172 170 174 172 229

2 -do- -do- -do- 9.55 10.10 1.5 1.0 182 181 185 183 122

3 -do- -do- -do- 10.15 10.30 1.5 1.5 198 197 190 194 86

4 -do- -do- -do- 10.30 10.45 1.5 1.0 196 195 190 193 128

5 -do- -do- -do- 10.50 11.05 1.5 0.5 180 181 179 180 240

1 40.00 37.00 3 Mtr 8.00 8.15 1.5 0.5 162 160 154 157 209

2 -do- -do- -do- 8.15 8.30 1.5 1.0 172 168 155 162 108

3 -do- -do- -do- 8.30 8.45 1.5 1.5 188 187 180 184 82

4 -do- -do- -do- 8.50 9.05 1.5 1.0 166 165 160 163 108

5 -do- -do- -do- 9.05 9.20 1.5 0.5 158 157 157 157 209

19
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 05-12-2009 Water table : 8 mtr BORE HOLE No: RBBHR1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value
Run (M) Kg/sq.cm Readings
From To

1 22.00 20.50 1.50 12.30 12.45 1.50 0.5 47 47 46 47 124

2 -do- -do- -do- 12.45 1.00 1.50 1.0 50 49 49 49 65

3 -do- -do- -do- 1.00 1.15 1.50 1.5 54 54 54 54 48

4 -do- -do- -do- 1.15 1.30 1.50 1.0 50 49 49 49 65

5 -do- -do- -do- 1.35 1.50 1.50 0.5 45 45 45 45 120

1 25.00 22.00 3 Mtr 9.40 9.55 1.3 0.5 80 80 80 80 107

2 -do- -do- -do- 9.55 10.10 1.3 1.0 86 85 85 85 57

3 -do- -do- -do- 10.10 10.25 1.3 1.5 90 89 89 89 40

4 -do- -do- -do- 10.35 10.50 1.3 1.0 85 85 85 85 57

5 -do- -do- -do- 10.50 11.05 1.3 0.5 80 79 79 79 105

1 28.00 25.00 3 Mtr 8.00 8.15 1.3 0.5 55 54 54 54 72

2 -do- -do- -do- 8.15 8.30 1.3 1.0 60 45 30 38 25

3 -do- -do- -do- 8.40 8.55 1.3 1.5 65 65 64 65 29

4 -do- -do- -do- 8.55 9.05 1.3 1.0 60 58 58 58 39

5 -do- -do- -do- 9.05 9.20 1.3 0.5 64 62 61 62 82

20
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 05-12-2009 Water table : 8 mtr BORE HOLE No: RBBHR1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
(M) Kg/sq.cm LT Readings
From To

1 31.00 28.00 3 Mtr 3.45 4.00 1.4 0.5 40 42 42 42 56

2 -do- -do- -do- 4.10 4.15 1.4 1.0 45 44 44 44 29

3 -do- -do- -do- 4.15 4.30 1.4 1.5 50 48 47 48 21

4 -do- -do- -do- 4.30 4.45 1.4 1.0 45 44 43 44 29

5 -do- -do- -do- 4.45 5.05 1.4 0.5 40 40 39 40 53

1 34.00 31.00 3 Mtr 2.00 2.15 1.3 0.5 64 62 60 61 81

2 -do- -do- -do- 2.15 2.30 1.3 1.0 63 65 65 65 43

3 -do- -do- -do- 2.30 2.45 1.3 1.5 70 72 71 72 32

4 -do- -do- -do- 2.55 3.10 1.3 1.0 62 61 60 61 40

5 -do- -do- -do- 3.10 3.25 1.3 0.5 61 60 60 60 80

1 37.00 34.00 3 Mtr 12.00 12.15 1.3 0.5 65 64 64 64 85

2 -do- -do- -do- 12.15 12.30 1.3 1.0 68 68 68 68 45

3 -do- -do- -do- 12.35 12.50 1.3 1.5 71 70 71 71 31

4 -do- -do- -do- 12.50 1.05 1.3 1.0 66 65 66 66 44

5 -do- -do- -do- 1.05 1.20 1.3 0.5 62 61 61 61 81

21
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 05-12-2009 Water table : 8 mtr BORE HOLE No: RBBHR1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of 5 To 10 Minits 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level Pressure Kg/sq.cm 0 To 5 Minits LT Lugeon Value
Run (M) LT LT Readings
From To

1 40.00 37.00 3 Mtr 10.15 10.30 1.3 0.5 68 65 64 65 86

2 -do- -do- -do- 10.30 10.45 1.3 1.0 74 74 71 73 48

3 -do- -do- -do- 10.45 11.00 1.3 1.5 80 80 79 80 35

4 -do- -do- -do- 11.05 11.20 1.3 1.0 71 70 70 70 47

5 -do- -do- -do- 11.20 11.35 1.3 0.5 65 63 63 63 84

22
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : RBBHR2 C.H. No. :
DATE : 20-12-2009 Water table : 9.90 Mtr BORE HOLE No: RBBHR2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT Readings
From To

1 19.00 16.00 3 Mtr 4.05 4.20 1.3 0.5 75 75 75 75 100

2 -do- -do- -do- 4.20 4.35 1.3 1.0 81 80 80 80 53

3 -do- -do- -do- 4.35 4.50 1.3 1.5 88 87 87 87 39

4 -do- -do- -do- 5.00 5.15 1.3 1.0 80 79 79 79 53

5 -do- -do- -do- 5.15 5.30 1.3 0.5 74 74 73 74 98

1 22.00 19.00 3 Mtr 2.25 2.40 1.3 0.5 55 55 55 55 73

2 -do- -do- -do- 2.40 2.55 1.3 1.0 60 61 60 61 40

3 -do- -do- -do- 2.55 3.10 1.3 1.5 66 66 66 66 29

4 -do- -do- -do- 3.20 3.35 1.3 1.0 59 60 60 60 40

5 -do- -do- -do- 3.35 3.50 1.3 0.5 54 53 53 53 71

23
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : RBBHR2 C.H. No. :
DATE : 20-12-2009 Water table : 9.90 Mtr BORE HOLE No: 3 RBBHR2
CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 5 To 10 Minits Average of Last
S.No. Start Time End Time Head Level 10 To 15 Minits LT Lugeon Value
(M) Kg/sq.cm LT LT Two Readings
From To

1 25.00 22.00 3 Mtr 12.50 1.05 1.4 0.5 68 68 67 68 90

2 -do- -do- -do- 1.05 1.20 1.4 1.0 75 74 75 75 50

3 -do- -do- -do- 1.20 1.35 1.4 1.5 82 84 83 84 37

4 -do- -do- -do- 1.35 1.50 1.4 1.0 74 73 72 73 48

5 -do- -do- -do- 1.50 2.05 1.4 0.5 66 66 65 66 87

1 28.00 25.00 3 Mtr 11.00 11.15 1.3 0.5 110 110 108 109 145

2 -do- -do- -do- 11.15 11.30 1.3 1.0 116 116 115 116 77

3 -do- -do- -do- 11.30 11.45 1.3 1.5 125 124 124 124 55

4 -do- -do- -do- 11.45 12.00 1.3 1.0 115 114 114 114 76

5 -do- -do- -do- 12.15 12.30 1.3 0.5 108 108 108 108 144

1 31.00 28.00 3 Mtr 9.15 9.30 1.3 0.5 64 63 63 63 84

2 -do- -do- -do- 9.30 9.45 1.3 1.0 68 68 68 68 45

3 -do- -do- -do- 9.45 10.00 1.3 1.5 75 74 74 74 33

4 -do- -do- -do- 10.10 10.25 1.3 1.0 67 67 67 67 45

5 -do- -do- -do- 10.25 10.40 1.3 0.5 63 62 62 62 83

24
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : RBBHR2 C.H. No. :
DATE : 20-12-2009 Water table : 9.90 Mtr BORE HOLE No: 3 RBBHR2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Run 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level Pressure Kg/sq.cm 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
(M) LT Readings
From To

1 34.00 31.00 3 Mtr 7.30 7.45 1.3 0.5 40 40 39 40 53

2 -do- -do- -do- 7.45 8.00 1.3 1.0 45 45 45 45 30

3 -do- -do- -do- 8.00 8.15 1.3 1.5 48 48 47 48 21

4 -do- -do- -do- 8.25 8.40 1.3 1.0 44 44 43 44 29

5 -do- -do- -do- 8.40 8.55 1.3 0.5 39 39 39 39 52

1 37.00 34.00 3 Mtr 4.35 4.50 1.3 0.5 65 64 64 64 85

2 -do- -do- -do- 4.50 5.05 1.3 1.0 68 68 67 68 45

3 -do- -do- -do- 5.15 5.30 1.3 1.5 70 69 70 70 31

4 -do- -do- -do- 3.30 5.45 1.3 1.0 66 64 65 65 43

5 -do- -do- -do- 5.45 6.00 1.3 0.5 66 65 64 65 86

1 40.00 37.00 3 Mtr 3.00 3.15 1.3 0.5 60 55 55 55 73

2 -do- -do- -do- 3.15 3.30 1.3 1.0 68 63 63 63 42

3 -do- -do- -do- 3.35 3.50 1.3 1.5 75 75 74 75 33

4 -do- -do- -do- 3.50 4.05 1.3 1.0 67 63 63 63 42

5 -do- -do- -do- 4.05 4.20 1.3 0.5 60 59 58 59 78

25
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 31-12-2009 Water table : 8.00 BORE HOLE No: RBBHL1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last Two
S.No. Start Time End Time Head Level Lugeon Value Remarks
Run (M) Kg/sq.cm LT LT LT Readings
From To

1 19.50 18.00 1.5 Mtr 7.00 7.15 1.5 0.5 40 40 39 40 105

2 -do- -do- -do- 7.15 7.30 1.5 1.0 44 43 43 43 57

3 -do- -do- -do- 7.30 7.45 1.5 1.5 48 47 47 47 42

4 -do- -do- -do- 7.45 8.00 1.5 1.0 43 42 42 42 56

5 -do- -do- -do- 8.05 8.20 1.5 0.5 39 39 40 40 105

1 22.00 19.00 3 Mtr 3.10 3.25 1.4 0.5 210 210 209 210 279 Water Loss

2 -do- -do- -do- 3.25 3.40 1.4 1.0 216 215 215 215 143 50%

3 -do- -do- -do- 3.45 4.00 1.4 1.5 222 222 221 222 98 19.5 Mtr

4 -do- -do- -do- 4.15 4.30 1.4 1.0 215 215 214 215 143

5 -do- -do- -do- 4.30 4.45 1.4 0.5 208 208 208 208 277

1 25.00 22.00 3 Mtr 1.35 1.50 1.4 0.5 195 194 195 195 259

2 -do- -do- -do- 1.50 2.05 1.4 1.0 204 203 203 203 135

3 -do- -do- -do- 2.05 2.20 1.4 1.5 212 211 210 211 94

4 -do- -do- -do- 2.20 2.35 1.4 1.0 203 203 202 203 135

5 -do- -do- -do- 2.35 2.50 1.4 0.5 193 192 192 192 256

26
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 31-12-2009 Water table : 8.00 BORE HOLE No: RBBHL1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value
Run (M) Kg/sq.cm Readings
From To

1 28.00 25.00 3 Mtr 11.55 12.10 1.4 0.5 155 154 154 154 205

2 -do- -do- -do- 12.10 12.25 1.4 1.0 162 161 161 161 107

3 -do- -do- -do- 12.25 12.40 1.4 1.5 169 168 168 168 75

4 -do- -do- -do- 12.45 1.00 1.4 1.0 161 161 161 161 107

5 -do- -do- -do- 1.00 1.15 1.4 0.5 154 153 152 153 203

1 31.00 28.00 3 Mtr 10.15 10.30 1.4 0.5 155 154 154 154 205

2 -do- -do- -do- 10.30 10.45 1.4 1.0 162 161 161 161 107

3 -do- -do- -do- 10.45 11.00 1.4 1.5 169 168 168 168 75

4 -do- -do- -do- 11.05 11.20 1.4 1.0 161 161 161 161 107

5 -do- -do- -do- 11.20 11.35 1.4 0.5 154 153 152 153 203

1 34.00 31.00 3 Mtr 8.35 8.50 1.4 0.5 102 101 100 101 134

2 -do- -do- -do- 8.50 9.05 1.4 1.0 106 106 105 106 70

3 -do- -do- -do- 9.05 9.20 1.4 1.5 111 111 110 111 49

4 -do- -do- -do- 9.25 9.40 1.4 1.0 104 104 103 104 69

5 -do- -do- -do- 9.40 9.55 1.4 0.5 100 100 99 100 133

27
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :
DATE : 31-12-2009 Water table : 8.00 BORE HOLE No: RBBHL1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 0 To 5 Minits 5 To 10 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level Lugeon Value Remarks
Run (M) Kg/sq.cm LT LT LT Two Readings
From To

1 37.00 34.00 3 Mtr 7.00 7.15 1.4 0.5 188 187 188 188 250

2 -do- -do- -do- 7.15 7.30 1.4 1.0 195 195 194 195 130 Water Loss

3 -do- -do- -do- 7.30 7.45 1.4 1.5 205 204 204 204 91 75%

4 -do- -do- -do- 7.45 8.00 1.4 1.0 194 194 194 194 129 36 Mtr

5 -do- -do- -do- 8.00 8.15 1.4 0.5 188 182 189 186 247

1 40.00 37.00 3 Mtr 4.30 4.45 1.4 0.5 170 168 168 168 224

2 -do- -do- -do- 4.45 5.00 1.4 1.0 177 175 175 175 117

3 -do- -do- -do- 5.00 5.15 1.4 1.5 185 184 184 184 82

4 -do- -do- -do- 5.15 5.30 1.4 1.0 176 174 174 174 116

5 -do- -do- -do- 5.30 5.45 1.4 0.5 168 168 168 168 224

28
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : +84.280 C.H. No. :
DATE : 25-12-2009 Water table : 10.50 BORE HOLE No: RBBHL2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure Average of Last Two
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value
Run (M) Kg/sq.cm Readings
From To

1 22.00 19.00 3 Mtr 7.30 7.45 1.3 0.5 190 189 189 189 252

2 -do- -do- -do- 7.45 8.00 1.3 1.0 196 150 130 140 93

3 -do- -do- -do- 8.10 8.25 1.3 1.5 104 203 203 203 90

4 -do- -do- -do- 8.25 8.40 1.3 1.0 194 193 193 193 129

5 -do- -do- -do- 8.40 8.55 1.3 0.5 188 187 187 187 249

29
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : +84.280 C.H. No. :
DATE : 25-12-2009 Water table : 10.50 BORE HOLE No: RBBHL2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Pressure 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 0 To 5 Minits LT 5 To 10 Minits LT Lugeon Value
Run (M) Kg/sq.cm LT Two Readings
From To

1 25.00 22.00 3 Mtr 3.00 3.15 1.4 0.5 169 169 168 169 225

2 -do- -do- -do- 3.15 3.30 1.4 1.0 169 169 169 169 113

3 -do- -do- -do- 3.30 3.45 1.4 1.5 175 175 174 175 78

4 -do- -do- -do- 3.55 4.10 1.4 1.0 168 167 167 167 111

5 -do- -do- -do- 4.10 4.25 1.4 0.5 166 165 165 165 220

1 28.00 25.00 3 Mtr 1.30 1.45 1.4 0.5 185 184 184 184 245

2 -do- -do- -do- 1.45 2.00 1.4 1.0 188 189 189 189 126

3 -do- -do- -do- 2.00 2.15 1.4 1.5 196 196 196 196 87

4 -do- -do- -do- 2.15 2.30 1.4 1.0 187 187 187 187 125

5 -do- -do- -do- 2.30 2.45 1.4 0.5 184 184 184 184 245

1 31.00 28.00 3 Mtr 11.00 11.15 1.4 0.5 170 170 170 170 227

2 -do- -do- -do- 11.15 11.30 1.4 1.0 178 178 177 178 118

3 -do- -do- -do- 11.35 11.50 1.4 1.5 185 185 185 185 82

4 -do- -do- -do- 11.50 12.05 1.4 1.0 177 177 176 177 118

5 -do- -do- -do- 12.15 12.30 1.4 0.5 169 168 168 168 224

30
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : +84.280 C.H. No. :
DATE : 25-12-2009 Water table : 10.50 BORE HOLE No: RBBHL2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : 32 Dia of Bore : 75 (NX)

Depth (M)
Length of Run Average of Last Two
S.No. Start Time End Time Head Level Pressure Kg/sq.cm 0 To 5 Minits LT 5 To 10 Minits LT 10 To 15 Minits LT Lugeon Value
(M) Readings
From To

1 34.00 31.00 3 Mtr 9.15 9.30 1.3 0.5 175 174 174 174 232

2 -do- -do- -do- 9.30 9.45 1.3 1.0 186 186 185 186 124

3 -do- -do- -do- 9.45 10.00 1.3 1.5 195 195 195 195 87

4 -do- -do- -do- 10.10 10.25 1.3 1.0 185 185 185 185 123

5 -do- -do- -do- 10.25 10.40 1.3 0.5 174 174 174 174 232

1 37.00 34.00 3 Mtr 7.30 7.45 1.3 0.5 170 169 169 169 225

2 -do- -do- -do- 7.45 8.00 1.3 1.0 180 178 178 178 119

3 -do- -do- -do- 8.10 8.25 1.3 1.5 188 188 187 188 83

4 -do- -do- -do- 8.25 8.40 1.3 1.0 179 178 178 178 119

5 -do- -do- -do- 8.40 8.55 1.3 0.5 169 169 168 169 225

1 40.00 37.00 3 Mtr 3.30 3.45 1.3 0.5 190 190 189 190 253

2 -do- -do- -do- 3.45 4.00 1.3 1.0 200 198 198 198 132

3 -do- -do- -do- 4.00 4.15 1.3 1.5 220 218 218 218 97

4 -do- -do- -do- 4.25 4.40 1.3 1.0 201 201 200 201 134

5 -do- -do- -do- 4.40 4.55 1.3 0.5 185 184 184 184 245

31
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 11-02-2010 Water table : 13.00 m BORE HOLE No : LBBHC 1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 19.00 16.00 3 Mtr 11.55 12.10 0.5 143 142 140

2 -do- -do- -do- 12.10 12.25 1.0 152 151 150

3 -do- -do- -do- 12.25 12.40 1.5 150 165 163

4 -do- -do- -do- 12.45 1.00 1.0 171 168 166

5 -do- -do- -do- 1.00 1.15 0.5 154 152 149

1 22.00 19.00 3 Mtr 10.20 10.35 0.5 133 132 130

2 -do- -do- -do- 10.35 10.50 1.0 142 141 140

3 -do- -do- -do- 10.50 11.05 1.5 150 155 153

4 -do- -do- -do- 11.05 11.20 1.0 161 158 156

5 -do- -do- -do- 11.20 11.35 0.5 144 142 139

1 25.00 22.00 3 Mtr 8.55 9.10 1.5 0.5 71 70 67

2 -do- -do- -do- 9.10 9.25 1.5 1.0 75 74 74

3 -do- -do- -do- 9.25 9.40 1.5 1.5 81 80 80

4 -do- -do- -do- 9.40 9.45 1.5 1.0 74 73 72

5 -do- -do- -do- 9.45 10.00 1.5 0.5 69 68 68

32
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 11-02-2010 Water table : 13.00 m BORE HOLE No : LBBHC 1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 28.00 25.00 3 Mtr 7.30 7.45 1.5 0.5 109 103 95

2 -do- -do- -do- 7.45 8.00 1.5 1.0 121 116 107

3 -do- -do- -do- 8.00 8.15 1.5 1.5 130 128 129

4 -do- -do- -do- 8.15 8.30 1.5 1.0 117 113 98

5 -do- -do- -do- 8.30 8.45 1.5 0.5 99 93 96

1 31.00 28.00 3 Mtr 3.55 4.10 1.5 0.5 82 78 74

2 -do- -do- -do- 4.10 4.25 1.5 1.0 109 104 98

3 -do- -do- -do- 4.25 4.40 1.5 1.5 121 118 109

4 -do- -do- -do- 4.45 5.00 1.5 1.0 107 100 98

5 -do- -do- -do- 5.00 5.15 1.5 0.5 77 73 69

1 34.00 31.00 3 Mtr 2.20 2.35 1.5 0.5 110 104 96

2 -do- -do- -do- 2.35 2.50 1.5 1.0 122 117 108

3 -do- -do- -do- 2.50 3.05 1.5 1.5 133 131 130

4 -do- -do- -do- 3.00 3.20 1.5 1.0 119 115 100

5 -do- -do- -do- 3.20 3.35 1.5 0.5 101 95 99

33
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 11-02-2010 Water table : 13.00 m BORE HOLE No : LBBHC 1

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX)

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 37.00 34.00 3 Mtr 12.45 1.00 1.5 0.5 82 79 75

2 -do- -do- -do- 1.00 1.15 1.5 1.0 110 105 99

3 -do- -do- -do- 1.15 1.30 1.5 1.5 123 119 110

4 -do- -do- -do- 1.30 1.45 1.5 1.0 108 101 99

5 -do- -do- -do- 1.45 2.00 1.5 0.5 79 75 71

1 40.00 37.00 3 Mtr 11.05 11.20 1.5 0.5 80 78 72

2 -do- -do- -do- 11.20 11.35 1.5 1.0 91 89 74

3 -do- -do- -do- 11.35 11.50 1.5 1.5 103 101 95

4 -do- -do- -do- 11.55 12.10 1.5 1.0 88 75 82

5 -do- -do- -do- 12.10 12.25 1.5 0.5 76 72 68

34
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHC 1
DATE : Water Level : 13.00 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 0.00 3.00 0 to 1 3 Ltr 3.00 m

2 -do- -do- 1 to 2 1.6 Ltr -do-

3 -do- -do- 2 to 5 3.4 Ltr -do-

4 -do- -do- 5 to 10 6 Ltr -do-

5 -do- -do- 10 to 15 8 Ltr -do-

6 -do- -do- 15 to 30 14 Ltr -do-

7 -do- -do- 30 to 60 14 Ltr -do-

1 3.00 6.00 0 to 1.00 5-3 Ltr 3.00 m

2 -do- -do- 1 to 2 4-2 Ltr -do-

3 -do- -do- 2 to 5 6.00 Ltr -do-

4 -do- -do- 5 to 10 9.00 Ltr -do-

5 -do- -do- 10 to 15 13.2 Ltr -do-

6 -do- -do- 15 to 30 16.3 Ltr -do-

7 -do- -do- 30 to 60 21 Ltr -do-

35
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHC 1
DATE : Water Level : 13.00 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 6.00 9.00 0 to 1 6.4 Ltr 3.00 m

2 -do- -do- 1 to 2 5.8 Ltr -do-

3 -do- -do- 2 to 5 6.5 Ltr -do-

4 -do- -do- 5 to 10 9.2 Ltr -do-

5 -do- -do- 10 to 15 15.4 Ltr -do-

6 -do- -do- 15 to 30 18.5 Ltr -do-

7 -do- -do- 30 to 60 22 Ltr -do-

1 9.00 12.00 0 to 1.00 6-2 Ltr 3.00 m

2 -do- -do- 1 to 2 5-9 Ltr -do-

3 -do- -do- 2 to 5 7.5 Ltr -do-

4 -do- -do- 5 to 10 9.2 Ltr -do-

5 -do- -do- 10 to 15 13.5 Ltr -do-

6 -do- -do- 15 to 30 17.5 Ltr -do-

7 -do- -do- 30 to 60 23.6 Ltr -do-

36
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 09-02-2010 Water table : 10.50 m BORE HOLE No : LBBHR 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 14m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 16.00 13.00 3 Mtr 3.10 3.15 1.3 0.5 90 89 88

2 -do- -do- -do- 3.15 3.30 1.5 1.0 96 95 92

3 -do- -do- -do- 3.35 3.50 1.5 1.5 100 98 96

4 -do- -do- -do- 3.50 4.05 1.5 1.0 93 90 89

5 -do- -do- -do- 4.10 4.25 1.5 0.5 86 83 79

1 19.00 16.00 3 Mtr 1.35 1.50 1.5 0.5 161 162 160

2 -do- -do- -do- 1.50 2.05 1.5 1.0 172 170 168

3 -do- -do- -do- 2.05 2.20 1.5 1.5 181 179 165

4 -do- -do- -do- 2.20 2.35 1.5 1.0 169 166 155

5 -do- -do- -do- 2.35 2.50 1.5 0.5 150 144 136

1 22.00 19.00 3 Mtr 12.00 12.15 1.5 0.5 155 153 145

2 -do- -do- -do- 12.15 12.30 1.5 1.0 166 165 160

3 -do- -do- -do- 12.30 12.45 1.5 1.5 175 173 168

4 -do- -do- -do- 12.45 1.00 1.5 1.0 155 153 149

5 -do- -do- -do- 1.05 1.20 1.5 0.5 140 135 130

37
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 09-02-2010 Water table : 10.50 m BORE HOLE No : LBBHR 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 14m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 25.00 22.00 3 Mtr 10.20 10.35 1.5 0.5 120 121 121

2 -do- -do- -do- 10.35 10.50 1.5 1.0 128 127 125

3 -do- -do- -do- 10.50 11.05 1.5 1.5 138 136 133

4 -do- -do- -do- 11.05 11.20 1.5 1.0 126 122 119

5 -do- -do- -do- 11.20 11.35 1.5 0.5 118 116 114

1 28.00 25.00 3 Mtr 8.45 9.00 1.4 0.5 95 93 92

2 -do- -do- -do- 9.00 9.15 1.4 1.0 101 100 100

3 -do- -do- -do- 9.20 9.35 1.4 1.5 110 109 107

4 -do- -do- -do- 9.35 9.50 1.4 1.0 99 97 96

5 -do- -do- -do- 9.50 10.05 1.4 0.5 93 91 89

1 31.00 28.00 3 Mtr 7.15 7.30 1.5 0.5 150 151 148

2 -do- -do- -do- 7.30 7.45 1.5 1.0 162 158 157

3 -do- -do- -do- 7.45 8.00 1.5 1.5 169 168 165

4 -do- -do- -do- 8.00 8.15 1.5 1.0 159 156 149

5 -do- -do- -do- 8.15 8.30 1.5 0.5 147 144 128

38
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 09-02-2010 Water table : 10.50 m BORE HOLE No : LBBHR 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 14m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 34.00 31.00 3 Mtr 5.10 5.25 1.4 0.5 99 98 96

2 -do- -do- -do- 5.25 5.40 1.4 1.0 100 100 95

3 -do- -do- -do- 5.40 5.55 1.4 1.5 109 108 106

4 -do- -do- -do- 5.55 6.10 1.4 1.0 110 99 94

5 -do- -do- -do- 6.10 6.25 1.4 0.5 96 93 91

1 37.00 34.00 3 Mtr 3.40 3.55 1.5 0.5 150 151 148

2 -do- -do- -do- 3.55 4.10 1.5 1.0 161 160 159

3 -do- -do- -do- 4.10 4.25 1.5 1.5 171 169 166

4 -do- -do- -do- 4.25 4.40 1.5 1.0 160 157 150

5 -do- -do- -do- 4.40 4.55 1.5 0.5 148 145 130

1 40.00 37.00 3 Mtr 2.00 2.15 1.5 0.5 61 59 57

2 -do- -do- -do- 2.15 2.30 1.5 1.0 69 68 66

3 -do- -do- -do- 2.30 2.45 1.5 1.5 79 78 75

4 -do- -do- -do- 2.50 3.05 1.5 1.0 68 67 64

5 -do- -do- -do- 3.05 3.20 1.5 0.5 59 58 58

39
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHR 2
DATE : Water Level : 10.50 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 0.00 3.00 0 to 1 4 Ltr 3.00 m

2 -do- -do- 1 to 2 1.9 Ltr -do-

3 -do- -do- 2 to 5 3.8 Ltr -do-

4 -do- -do- 5 to 10 6.5 Ltr -do-

5 -do- -do- 10 to 15 8.5 Ltr -do-

6 -do- -do- 15 to 30 13 Ltr -do-

7 -do- -do- 30 to 60 13.5 Ltr -do-

1 3.00 6.00 0 to 1.00 6 Ltr 3.00 m

2 -do- -do- 1 to 2 5-4 Ltr -do-

3 -do- -do- 2 to 5 6.3 Ltr -do-

4 -do- -do- 5 to 10 9.8 Ltr -do-

5 -do- -do- 10 to 15 14.2 Ltr -do-

6 -do- -do- 15 to 30 15.8 Ltr -do-

7 -do- -do- 30 to 60 19.5 Ltr -do-

40
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHR 2
DATE : Water Level : 10.50 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 6.00 9.00 0 to 1 5.2 Ltr 3.00 m

2 -do- -do- 1 to 2 5.0 Ltr -do-

3 -do- -do- 2 to 5 6.2 Ltr -do-

4 -do- -do- 5 to 10 8.9 Ltr -do-

5 -do- -do- 10 to 15 14.5 Ltr -do-

6 -do- -do- 15 to 30 17.9 Ltr -do-

7 -do- -do- 30 to 60 21 Ltr -do-

1 9.00 12.00 0 to 1.00 5.9 Ltr 3.00 m

2 -do- -do- 1 to 2 4-9 Ltr -do-

3 -do- -do- 2 to 5 6.4 Ltr -do-

4 -do- -do- 5 to 10 9 Ltr -do-

5 -do- -do- 10 to 15 13.2 Ltr -do-

6 -do- -do- 15 to 30 17 Ltr -do-

7 -do- -do- 30 to 60 20.7 Ltr -do-

41
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 15-02-2010 Water table : 13.30 m BORE HOLE No : LBBHL- 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 17m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 19.00 17.50 1.5 Mtr 10.10 10.25 1.5 0.5 61 59 58

2 -do- -do- -do- 10.25 10.40 1.5 1.0 72 69 66

3 -do- -do- -do- 10.40 10.55 1.5 1.5 81 78 76

4 -do- -do- -do- 10.55 11.10 1.5 1.0 69 66 65

5 -do- -do- -do- 11.20 11.35 1.5 0.5 57 54 51

1 22.00 19.00 3 Mtr 8.30 8.45 1.5 0.5 160 158 155

2 -do- -do- -do- 8.45 9.00 1.5 1.0 171 166 163

3 -do- -do- -do- 9.00 9.15 1.5 1.5 183 181 177

4 -do- -do- -do- 9.20 9.35 1.5 1.0 169 166 155

5 -do- -do- -do- 9.35 9.50 1.5 0.5 150 145 140

1 25.00 22.00 3 Mtr 4.55 5.10 1.5 0.5 110 109 106

2 -do- -do- -do- 5.10 5.25 1.5 1.0 121 120 116

3 -do- -do- -do- 5.25 5.40 1.5 1.5 133 131 131

4 -do- -do- -do- 5.40 5.55 1.5 1.0 120 118 115

5 -do- -do- -do- 5.55 6.10 1.5 0.5 101 99 96

42
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 15-02-2010 Water table : 13.30 m BORE HOLE No : LBBHL- 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 17m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 28.00 25.00 3 Mtr 3.25 3.40 1.4 0.5 66 65 63

2 -do- -do- -do- 3.40 3.55 1.4 1.0 76 75 73

3 -do- -do- -do- 3.55 4.10 1.4 1.5 88 88 87

4 -do- -do- -do- 4.15 4.30 1.4 1.0 75 73 70

5 -do- -do- -do- 4.30 4.45 1.4 0.5 61 59 58

1 31.00 28.00 3 Mtr 1.45 2.00 1.5 0.5 131 130 130

2 -do- -do- -do- 2.00 2.15 1.5 1.0 143 140 138

3 -do- -do- -do- 2.15 2.30 1.5 1.5 151 149 146

4 -do- -do- -do- 2.30 2.45 1.5 1.0 140 135 130

5 -do- -do- -do- 2.50 3.05 1.5 0.5 125 123 119

1 34.00 31.00 3 Mtr 12.00 12.15 1.5 0.5 115 114 114

2 -do- -do- -do- 12.20 12.35 1.5 1.0 120 121 121

3 -do- -do- -do- 12.35 12.50 1.5 1.5 131 130 129

4 -do- -do- -do- 12.55 1.10 1.5 1.0 115 115 114

5 -do- -do- -do- 1.10 1.25 1.5 0.5 100 99 98

43
IMS Explorations
FIELD BORE LOG CHART
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. R.L. : C.H. No. :

DATE : 15-02-2010 Water table : 13.30 m BORE HOLE No : LBBHL- 2

CLIENT : ConTec Design And Engineering Solutions (P)Ltd Rod Size : Dia of Bore : 75 (NX) Casing 17m

Depth (M)
Length of Run Pressure 0 To 5 Minits 10 To 15 Minits Average of Last
S.No. Start Time End Time Head Level 5 To 10 Minits LT Lugeon Value Remarks
(M) Kg/sq.cm LT LT Two Readings
From To

1 37.00 34.00 3 Mtr 9.20 9.35 1.5 0.5 134 133 130

2 -do- -do- -do- 9.35 9.50 1.5 1.0 148 148 148

3 -do- -do- -do- 9.55 11.10 1.5 1.5 159 158 157

4 -do- -do- -do- 11.10 11.25 1.5 1.0 138 137 130

5 -do- -do- -do- 11.25 11.40 1.5 0.5 129 126 125

1 40.00 37.00 3 Mtr 7.45 8.00 1.4 0.5 54 53 51

2 -do- -do- -do- 8.00 8.15 1.4 1.0 64 62 59

3 -do- -do- -do- 8.15 8.30 1.4 1.5 71 69 68

4 -do- -do- -do- 8.30 8.45 1.4 1.0 62 60 58

5 -do- -do- -do- 8.45 9.00 1.4 0.5 52 51 50

44
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHL 2
DATE : Water Level : 13.30 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 0.00 3.00 0 to 1 6 Ltr 3.00 m

2 -do- -do- 1 to 2 1.9 Ltr -do-

3 -do- -do- 2 to 5 5.5 Ltr -do-

4 -do- -do- 5 to 10 4.2 Ltr -do-

5 -do- -do- 10 to 15 5.2 Ltr -do-

6 -do- -do- 15 to 30 7 Ltr -do-

7 -do- -do- 30 to 60 7.8 Ltr -do-

1 3.00 6.00 0 to 1.00 4.8 Ltr 3.00 m

2 -do- -do- 1 to 2 4-2 Ltr -do-

3 -do- -do- 2 to 5 7.8 Ltr -do-

4 -do- -do- 5 to 10 8.2 Ltr -do-

5 -do- -do- 10 to 15 7.5 Ltr -do-

6 -do- -do- 15 to 30 9 Ltr -do-

7 -do- -do- 30 to 60 11 Ltr -do-

45
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHL 2
DATE : Water Level : 13.30 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 6.00 9.00 0 to 1 7.2 Ltr 3.00 m

2 -do- -do- 1 to 2 6.2 Ltr -do-

3 -do- -do- 2 to 5 8.3 Ltr -do-

4 -do- -do- 5 to 10 9 Ltr -do-

5 -do- -do- 10 to 15 11 Ltr -do-

6 -do- -do- 15 to 30 13.3 Ltr -do-

7 -do- -do- 30 to 60 19.4 Ltr -do-

1 9.00 12.00 0 to 1.00 6.8 Ltr 3.00 m

2 -do- -do- 1 to 2 6-0 Ltr -do-

3 -do- -do- 2 to 5 12.0 Ltr -do-

4 -do- -do- 5 to 10 13.4 Ltr -do-

5 -do- -do- 10 to 15 13.2 Ltr -do-

6 -do- -do- 15 to 30 16 Ltr -do-

7 -do- -do- 30 to 60 23 Ltr -do-

46
IMS Explorations
FIELD BORE LOG CHART ( WATER TABLE )
PROJECT: Proposed work at Hydro Electric scheme on River Godavari at Kanthanapally village, Eturu Nagaram (Mdl),
Warangal (Dist), A.P. BORE HOLE No : LBBHL 2
DATE : Water Level : 13.30 m

CLIENT : ConTec Design And Engineering Solutions (P)Ltd

Depth (M)
Water Level In the Elevation water
S.No. Time in Min Water Lts Length of Section Height of Water Level Ground Level (R.L) Diameter Casing Remarks
Tank Tank
From To

1 12.00 15.00 0 to 1 7.1 Ltr 3.00 m

2 -do- -do- 1 to 2 6.8 Ltr -do-

3 -do- -do- 2 to 5 11.3 Ltr -do-

4 -do- -do- 5 to 10 12.2 Ltr -do-

5 -do- -do- 10 to 15 11.2 Ltr -do-

6 -do- -do- 15 to 30 19 Ltr -do-

7 -do- -do- 30 to 60 27 Ltr -do-

1 15.00 17.00 0 to 1.00 6.9 Ltr 2.00 m

2 -do- -do- 1 to 2 6-2 Ltr -do-

3 -do- -do- 2 to 5 11.9 Ltr -do-

4 -do- -do- 5 to 10 11.8 Ltr -do-

5 -do- -do- 10 to 15 13.2 Ltr -do-

6 -do- -do- 15 to 30 21 Ltr -do-

7 -do- -do- 30 to 60 30 Ltr -do-