ARC Machine Tools

Schedule November 2019


DESPATCH PLAN

WEEK 1 WEEK 2
S.No PART NO. DESCRIPTION 1st~7th 8th~14th
1 48083784 LEVER ASSY PTO 675 675
2 84543113 JOINT LH COMPLETE 225 225
3 98424384 FASTNING PLATE 250 250
4 5117787 LEVER CONTROL INTERN 200 200
5 82822621 SHAFT ASSY THROTTLE 113 113
6 51518628 LINK, SHIFTING LO, W 63 63
7 51518634 LINK WA, SHIFTING 1S 50 50
8 47413003 LEVER ASSY 175 175
9 47409103 SHAFT ASSY LEVERSTRE 1250 1250
10 47752689 SPACER 75 75
11 84426792 DRAIN PLUG-FUEL TANK 63 63
12 48046778 ADAPTER DELIVERY FRO 125 125
13 51518631 LINK, SHIFTING 3RD-4 50 50
14 51518619 LINK WA, SHIFTING RA 63 63
15 47811828 SPACER 75 75
16 47513870 ROD GEAR CHANGE 50 50
17 47412504 STOP ASSY ROD LIMIT 75 75
18 5120284 STOP LIMIT FRONT BLO 75 75
19 47799694 SPACER 25 25
20 47956888 LEVER CONTROL ASSY S 138 138
21 82822614 SHAFT ASSY LEVER FOO 100 100
22 84307286 LEVER CONTROL 0 0
23 47766492 SPACER P.T.O. SHAFT 0 0
24 48169333 LEVER, CONTROL ASSY, 0 0
25 84481705 AXLE PIVOT 0 0
26 47791970 ADAPTER DELIVERY FRO 0 0
27 47130774 PIN 0 0
28 47372050 PLATE COVER LOWER FO 0 0
29 47372051 ROD LIFTING PIN 0 0
30 47972428 SHAFT ASSY THROTTLE 0 0
31 48030567 PLUG SUCTION PORT 0 0
32 48091411 PTO LEVER ASSY 0 0
33 82824466 PLUG FOR SUCTION POR 0 0

Note:
1.Material Shown in RED is critical for production, immediate dispatch needed.
2.Form 38 should accompany all supplies which are dispatched from plant locations outside U.P.
3.Duplicate copy of Invoice (Transporter copy) must accompany all the supplies for claiming Modvat.
4.The suppliers shall not despatch material in excess to quantities authorised through the Firm schedu
5. Material despatched in excess to the schedule will not be accepted by NHI and will be sent back at
6.Raw Material schedule is for your guidance in planning your production and procurement of raw ma
faridabad

e November 2019
DESPATCH PLAN TENTATIVE

WEEK 3 WEEK 4
15th~21st 22nd~28th Total Dec.'19 Jan.'20
675 675 2700 1900 950
225 225 900 350 400
250 250 1000 350 400
200 200 800 350 400
113 113 450 250 550
63 63 250 150 150
50 50 200 150 150
175 175 700 350 400
1250 1250 5000 350 400
75 75 300 250 200
63 63 250 100 250
125 125 500 700 300
50 50 200 150 150
63 63 250 0 500
75 75 300 300 200
50 50 200 100 250
75 75 300 350 400
75 75 300 350 400
25 25 100 100 50
138 138 550 700 400
100 100 400 250 650
0 0 0 100 250
0 0 0 0 300
0 0 0 0 0
0 0 0 0 50
0 0 0 0 250
0 0 0 0 150
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
15650 7650 8550

patch needed.
m plant locations outside U.P.
the supplies for claiming Modvat.
uthorised through the Firm schedules.
ed by NHI and will be sent back at Supplier risk and cost
uction and procurement of raw material. However authorisation to despatch is only our Firm schedule.