Академический Документы
Профессиональный Документы
Культура Документы
I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Signature _______________________________
Date 15/10/2018
I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.
Signature _______________________________
Date _______________________________
I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.
Signature _______________________________
Date _______________________________
NB: This declaration must be completed in full, submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
F:\final project.igc3.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet
Sheet number 2 of 20
Regularly
2.HAZARD:Observed people working Frequent breaks and job
in hazardous area where cement dust rotation should be provided
and chemical particles present. Health surveillance of
Within 1 month
workers exposed to hazard
area
CONSEQUENCE: Lung problem like
Appropriate PPE should be Immediately
black lung disease through inhalation provided like RPE
and skin irritant caused by absorption.
3.HAZARD: Observed trailing cable of Reposition of the cable wire Within 1 week
drilling machine on pathway where Adequate lightning should be Immediately
workers are walking. provided in workplace
Appropriate warning signage
can be given so people will Immediately
CONSEQUENCE: It can lead to trip have awareness about it.
hazard which can cause serious injury Good housekeeping by
like head injury and bone fracture or providing suitable storage Within 1 month
even head hit against sharp edge can area for storage, clear
lead to fatality. obstacles from pathway.
F:\final project.igc3.doc
The generator should be
repositioned from area where Within 1 week
4.HAZARD: Observed two person doing
workers are performing their
electrical work near power generator job
without any hearing protection. Replace high noise generator Within 1 month
with a low noise one
CONSEQUENCE:The sound generated Provide ear defender or ear
by the power generator could lead to plug to workers working in Immediately
hearing loss and non auditory disease noisy environment
like fatigue and stress. Frequent break or job rotation
should be provided Regularly
F:\final project.igc3.doc
8.HAZARD: Observed stagnation of Routine inspection should be
done in construction site to Within 1 week
water near to construction site where ensure prevention of stagnant
workers doing drilling operation. water
Appoint pest control contractor
CONSEQUENCE: The workers may by management to prevent Within 1 month
get exposed by absorption or inhalation disease spread on work place
of harmful bacteria and virus may lead Stagnant water should be
to disease like leptospirosis, hepatitis B drained through pump Immediately
etc
F:\final project.igc3.doc
12.HAZARD: Had observed a driver While reversing banks man Within 3 week
reversing fork lift truck without any with suitable clothing must
safety alarm on area where pedestrians give instruction to driver
are walking. Proper maintenance should Within 1 week
be done by supervisor
CONSEQUENCE: Vehicle may hit the Instead of reversing adapt Within 1 month
people or object which leads to damage around about system
of property ,injury to people or even Vehicle free zone and
fatality. Within 3 week
Pedestrian free zone must
be marked separately
Housekeeping should be
authorised by organisation Within 3 week
Clean up the spill at
15.HAZARD: Observed workplace with appropriate interval
Immediately
oil spillage on floor were workers are Proper lightning should be
doing machine maintenance activity provided Immediately
Proper maintenance of
machine should be done in Within 1 week
CONSEQUENCE: Slip hazard which regular interval
lead to head injury, bruises. Adequate PPE that is foot
wear with increased floor
resistance should be given Immediately
to workers
F:\final project.igc3.doc
Select right tool for the right
Immediately
job
F:\final project.igc3.doc
Machine should be replace Within 4 week
with less vibrant one
Training and supervision
19.HAZARD: Observed a worker using should be given to workers Within 3 week
drilling machine continuously for while using vibrating
prolong hours to bark the concrete equipment
Frequent break and job
CONSEQUENCE: Due to transmission rotation should be given to Regularly
of vibration to body leads to hand arm workers
vibration. It can also tendons, muscle Appropriate PPE should be
joints and nervous system provided like goggles,
Immediately
RPE, safety boot and hard
hat
Gas cylinder to be
20.HAZARD: Observed gas cylinder is repositioned away from the Within 1 week
placed near to welding activity workplace
Warning signage or symbol Immediately
CONSEQUENCE: Welding operation should be provided
spark hot slag may cause leakage of Training and supervision
gas when regular area in contact with should be given to workers Within 1 month
cylinder valve, which lead to fire and during welding
explosion.
F:\final project.igc3.doc
Train and supervise them
Within 1 month
23.HAZARD: Observed an young boy more than other workers
entering the work premises for implant Provide a senior worker to Immediately
training, curious about the activities mentor them and keep a
going on in excavation area. close eye on their activities
Do not expose them to Immediately
CONSEQUENCE: As boy is immature radiation
due to peer pressure he may risk his Provide specific health
life. Within 3 week
surveillance
F:\final project.igc3.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
The Health and Safety inspection was carried out by me on 9th October 2018
between 9:30 am to 11:30 am at area of work under LIMS constructions. The site is
approximately covered of 3 acre. The scope of the inspection is to highlight area of concern
of serious accidents and near misses in past month.
F:\final project.igc3.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
Executive Summary
The main objective of this inspection was to identify major hazards that
result in incidents in a work site for past month. During inspection following job were being
undertaken excavation work , drilling operation, welding activity, carpentry works, concrete
work, transportation of materials, and other machinery operation.
The inspection clearly indicates that there are many hazards which are
not taken seriously by management.
1) VEHICLE HAZARD: The vehicles travelling close to excavation region at high speed.
Due to lack of barricade in place , lack of supervision, no proper warning signage the
vehicle may fall into excavation region causing serious injury or even fatality to
workers.
2) WORKING AT HEIGHT: A person carrying out welding operation at approximately
5m height in an improper platform, the person may fall which result in serious injury
like bone fracture or even fatality.
3) ELECTRICITY HAZARD: The workers carrying out maintenance activity on a faulty
electrical equipment, as a result electric shock or shock burn may occur to electrician
which leads to serious injuries or even fatality.
4) FLAMMABLE CHEMICALS HAZARD: The flammable chemical substance stored
with other combustible materials near to work place were machinery operation is
going on, as a result sudden explosion may occur which leads to fatality.
5) MACHINERY HAZARD: A man working on a bench top grinder with unprotected
guard, which result in serious injury like cuts, amputation, and entanglement.
As per ILO C167 Health and Safety in Construction Convention 1988 and
Indian Factory Act 1948, implementation of control measures to reduce accidents in
work place have been recommended. The management have the moral responsibility
to take care of their workers under SSOW, give training and supervision to protect
people from serious injury as far as reasonably practicable. The management should
comply with legal laws to ensure that they don’t suffer from financial loss and to show
a positive health and safety culture.
F:\final project.igc3.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
Many vehicles are moving around an excavation area at high speed where no barricade in
place. The area is under a supervision of inspector, but he is not accessing the condition.
The workers were also busy in their on activity. The vehicles following an east route for
reaching the work site. The vehicles may be trapped in excavation region or there is a
possibility of skidding which result in serious injury or even fatality to people working in that
region. It may also lead to damage to underground buried service during the excavation
work causing explosion and flooding.
If the management failed to comply with this law, then they will face financial loss, legal
issues, and moreover workers morale will be lost. The loss of worker morale which impacts
productivity and quality. The financial loss that occurs to company due to accident and
property damage. The legal issues is to be faced like enforcement action that result in fines
and imprisonment or even both. It is recommended that management should give training
and warn driver to reduce speed near excavation region. Arrange a speed breaker and
hump to reduce speed, appoint a banks man for giving proper signal to driver. Provide a
prohibition signal board for vehicle .
The estimated cost for providing a speed breaker and hump is approximately Rs 40000,
otherwise management will face financial loss of Rs 2000
F:\final project.igc3.doc
2.OBSERVATION 7 (A person working at height in a improper platform ):
The worker at approximately 5m height carrying out welding activity in an improper platform.
The person is not noticed by anyone as he is working alone. At the ground level concrete
works have been going on. The person may fall due to any adverse environmental
conditions like wind , health condition or due to unawareness. As a result he will be seriously
injured or even fatality occurs. The workers at ground level can also be effected by fall from
height.
If the organisation failed to comply with the law, then they will face financial loss,
enforcement action. The workers trust towards management will be lost. The financial loss
due to fall from height or property damage. The legal issues that result in criminal offence,
civil claim, imprisonment and fine.
It is recommended that organisation should provide proper working platform like scaffold with
SWL, guard rails and toe board. The working at height should be undergone under PTW
system .The management should also provide adequate PPE like fall arrest equipment and
safety net to reduce consequence of fall.
The estimated cost for providing a scaffold as temporary working platform is Rs 60000,
otherwise the company will have a financial loss of Rs 300000.
F:\final project.igc3.doc
3.OBSERVATION 9 (Maintenance activity on faulty electrical equipment):
The workers carrying out maintenance activity on faulty electrical equipment which cause
electric shock and burns from contact with live parts and result in serious injury or even
fatality can occur when in contact with high voltage source. The workers were rushing to do
their job due to pressure from the supervisor. ELCB is not provided to incoming power
circuits to main electrical panel. The electrical equipment is not of double insulation.
According to ILO Convention 167 Article 26, all the electrical equipment and installations
shall be constructed, installed, and maintained by a competent person, and so used to guard
against danger. The laying and maintenance of electrical cables and apparatus on
construction site to be governed by standard applied at national level.
In the Indian Factory Act 1948, Article 24 states that in every construction site there should
be suitable devices for cutting of power in case of emergencies.
If the management failed to comply with the law, then they will face economic loss, legal
issues and moreover there will be high staff turnover. So it is recommended that
management should install ELCB and the electrical cable wire should be of double
insulation. The management should give training while accessing electrical equipment.
Proper PPE should be given to workers like gloves, goggles while working with electrical
equipment.
The estimated cost for providing ELCB is Rs15000, if management failed to provide then
they will have a financial loss of Rs 200000.
F:\final project.igc3.doc
4.OBSERVATION 10 (Flammable chemical substance stored near to workplace):
The flammable chemical substance stored together with other combustible materials near to
which the workers are doing machinery operation. Also observed lack of ventilation in the
room where these flammables are stored. The storage room was not given any signage or
warning. The flammable substance of different types are stored in single room. The room is
not provided with fire extinguisher near to it. As a result sudden explosion may occur or
chemical exposure to skin can cause skin cancer and lung cancer.
If the management violates the law then they will face financial loss as a result of fire and
explosion. The worker will not feel safe, and they move to other organisations. The company
also face enforcement action that will result in fines, imprisonment or both.
The estimated cost for the store room with proper ventilation to separate different
flammables is 150000, if not provided by the company can lead to financial loss of Rs
500000.
F:\final project.igc3.doc
5.OBSERVATION 6 (Bench top grinder with unprotected guard):
A man is working on a Bench top grinder, which is used to grind down sharp edges and
remove burrs from processed metals. Beside him different operations are going on. The
person was wearing loose clothe with inadequate PPE. The Bench top grinder is not
protected by guard, which can lead to contact with rotating wheel, drawing into the trap
between tool rest and wheel, also parts may get ejected from machine. As the person is
wearing loose clothes entanglement may occur which result in serious injury like cuts
amputation may occur. Also non mechanical hazard like noise, ergonomics, vibration,
electricity may occur.
If the management failed to comply with the law , severe actions would be faced like legal
issues that is enforcement notice that result in civil claim, criminal offence, fines and
imprisonment or eve both. The financial loss like compensation pay out to worker,
hospitalisation cost, first aid treatment arises. The loss of staff morale as they realise that
employer is not providing safe place to work or SSOW.
It is recommended that the company should provide fixed enclosing guards around motor
and abrasive wheel. Also LEV should be installed to control dust. Routine maintenance
should be be done to ensure safe working condition, also ensure that competent person
should be given the right to work
The estimated cost for providing fixed guard and LEV is approximately 40000, if
management failed to provide they will economic loss of 200000.
F:\final project.igc3.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
Conclusions:
The activities on the construction site were of more high risk factor and some low risk factor.
The company is violating several safety laws and regulations that are stated in The Indian
Factory Act ,1948 and ILO- C167-Safety and Health in Construction Convention,1988.
The major findings that has been observed in the construction site were:
The vehicles moving at high speed close to excavation area which is not barricaded.
The vehicle may get trapped in the area or due to over speed the vehicle may skid
and workers who are working in that excavation region will be seriously injured or
even fatality occurs. It may also cause damage to buried service cable resulting in
explosion or flooding.
The control measures that could be taken by management to control this incidence is
first of all the excavated are should be barricaded, drivers should undergo a training
session, speed breaker and hump should be installed by management to reduce over
speed, speed limit to be set by organisation, proper warning signage should be there
near to high risk work.
F:\final project.igc3.doc
The control measures to be taken are the worker should be provided a scaffold as
temporary working platform with SWL. The work at height should be done with PTW.
The management should provide adequate PPE like fall arrest equipment and safety
net to reduce consequence of fall.
The workers carrying out maintenance activity on faulty electrical equipment. The
workers may get electric shock from high voltage source.
ELCB must be installed and double insulation to be provided, Also competent person
should be allowed to work, IITS to be provided to workers who were newly appointed
are the control measures to be taken by management.
The flammable chemical substances stored together with other combustible materials
near to work place. As a result explosion may occur or even chemical exposure to
skin may lead to skin cancer.
There should be separate storage area for flammable materials and to be far away
from work place. Proper warning signage to be placed near to flammables. There
should be proper lighting and ventilation in storage area. Only authorised person
should have right to go to storage place. These are measures to be taken by the
management.
A man is working on a Bench top grinder with unprotected guard, which can lead to
cuts, amputation, and entanglement.
The five critical issues may lead the organisation to suffer from decreasing of
production rate, high insurance premium, uninsured cost and reduce morale of
workers. So by implementing corrective measures stated in recommendation table it
will help the company to reduce accidents in work site. It also help to increase the
productivity and reduce staff turnover. The recommendation to be taken within 4
months time period. It is also advised to review the report in upcoming HSE
management meeting, so that we can ensure a positive health and safety culture in
the organisation.
F:\final project.igc3.doc
UNIT GC3 – THE HEALTH AND Candidate report template
SAFETY PRACTICAL APPLICATION
F:\final project.igc3.doc
WORKING AT HEIGHT: Immediate action:
As the worker is doing welding Proper PPE should be
activity in an improper platform, a provided like fall arrest HIGH 13/10/2018
scaffold with SWL should be equipment and safety
provided by management. nets or safety landings
Adequate PPE should be provided to reduce consequence
to reduce consequence of fall. of fall.
PTW should be authorised by PTW should be issued
management. by organisation. HIGH 14/10/2018
Estimated cost is Rs 30000
Long term action:
Scaffold should be
erected HIGH 3/11/2018
IITS should be given to
workers by a competent LOW 1/11/2018
person.
Estimated cost is Rs 70000
F:\final project.igc3.doc
FLAMMABLE CHEMICAL HAZARD: Immediate action:
Separate storage area for Warning signage to be
flammable chemical substance. placed near flammable MEDIUM 11/10/2018
Warning signs to be placed near chemical substance.
storage area. Ventilation and lightning
Proper ventilation and lightning to be provided in HIGH 14/10/2018
should be provided. storage area.
Estimated cost is Rs 25000
Long term action:
Storage area should be
placed away from work HIGH 10/11/2018
place for different type
of flammables.
Estimated cost is Rs 80000.
MACHINERY HAZARD:
Fixed guard should be installed by Immediate action:
the management. PPE should be provided
LEV to be provided for collecting like goggles, hard hat HIGH 12/10/2018
dust from machinery. and aprons.
Adequate PPE and IITS to be Estimated cost is Rs 20000
provided by management Long term action:
A fixed guard to be
placed b/w motor and HIGH 25/10/2018
abrasive wheel
LEV to be installed by
management MEDIUM 29/10/2018
IITS should be provided
by management MEDIUM 6/11/2018
Estimated cost is Rs 70000
F:\final project.igc3.doc