Summary of PPP Projects

Update as of September 30, 2019

Mode of Project Cost


Stage Number
Procurement (in PhP Billion)

PPP Projects Under Solicited 15 242.77


Implementation Unsolicited 4 821.59
Sub-Total 19 1064.36

PPP Projects in the Solicited 15 0.38


Pipeline Unsolicited 35 2,941.47
Sub-Total 50 2,941.85

Note:
1. This list includes only those projects where the PPP Center is involved in either the development,
appraisal, procurement or implementation, and those projects not belonging to the former but which the
PPP Center is monitoring.

2. Pipeline refers to projects under development, or for approval, or for procurement.

3. Total amounts do not include projects that are still under development.

4. This list does not include Joint Ventures and PPP Projects prior to 2010.
Status of PPP Projects Under Implementation - Solicited
As of September 30, 2019

Solicited Projects issued with Notice of Award (NOA) to the winning private proponent(s).

APPROVED
IMPLEMENTING STAGE /
No. PROJECT TITLE PRIVATE PROPONENT REGION LATEST UPDATE PROJECT COST
AGENCY STATUS (in PhP Billion)

1 Daang Hari-SLEX Link Department of Ayala Corporation National Capital Region Operational Operational since July 24, 2015 2.23
Road (Muntinlupa- Public
Cavite Expressway) Works and The 1st Toll Rate Adjustment approved
Project Highways by TRB has been implemented on May
20, 2019.

2 PPP for School Department of Bright Future Educational Ilocos Region, Central Operational 9,296 classrooms completed and 9.89
Infrastructure Project Education Facilities Inc. (Region I) Luzon and CALABARZON delivered on December 4, 2015
(PSIP) Phase I and
Citicore - Megawide Ongoing first periodic maintenance
Consortium Inc. (Region works. 75.34% (7,004/9,296)
III and IV-A) classrooms completed as of
September 30, 2019

3 Automatic Fare Department of AF Payments, Inc. National Capital Region Operational Operational since December 16, 2015 1.72
Collection System Transportation (consortium of Ayala and
(AFCS) Project Metro Pacific Groups)

4 NAIA Expressway Department of Vertex Tollways National Capital Region Operational Phase 2A and Phase 2B operation 17.93
Project Public Development Inc. (VTDI) commenced on September 22, 2016
Works and and December 20, 2016, respectively
Highways

5 PPP for School Department of Pacakage A - Megawide Ilocos Region, Cagayan Under 4,070 classrooms (93.24%) completed; 3.86
Infrastructure Project Education Construction Corp. Valley, Central Luzon, Construction 241 classrooms (5.52%) ongoing
(PSIP) Phase II Pacakage E - Consortium Cordillera Administrative construction; 55 classrooms (1.24%)
of BSP Co. Inc. and Region, Northern under pre-construction phases as of
Vicente Lao Construction Mindanao, and Caraga August 31, 2019.
Region

6 Mactan-Cebu Department of GMR Infrastructure and Central Visayas Operational Construction 100% complete as of 17.52
International Airport Transportation; Megawide Consortium August 31, 2019.
(MCIA) Passenger Mactan Cebu
Terminal Building International Airport Terminal 2 commenced operations on
Project Authority June 30, 2018; Terminal 1 rehabilation
works completed on August 31, 2019

7 Paranaque Integrated Department of MWM Terminals, Inc., a National Capital Region Under Ongoing review of relevant documents 2.50
Terminal Exchange Transportation consortium of Megawide Construction by the IC for the issuance of the Final
(Southwest Integrated Construction Corp. and Acceptance Certificate
Transport System WM Property
Project) Management Inc. Issuance of Provisional Acceptance
Certificate and start of O&M on
November 08, 2018

8 Metro Manila Skyway Toll Regulatory Citra Central Expressway National Capital Region Under Construction on-going; 62.08% 37.43
(MMS) Stage 3 Project Board Corporation (CCEC) Construction complete as of July 25, 2019.

9 Bulacan Bulk Water Metropolitan SMC – K Water Central Luzon Under Issuance of Certificate of Final 24.41
Supply Project Waterworks and Consortium Construction Acceptance and start of operations on
Sewerage System Consortium Members: April 25, 2019.
San Miguel Holdings
Corp. and Korea Water
Resources Corporation

10 Civil Registry System Philippine Statistics Unisys Managed Services NCR (for CRS Central Under Central outlet operations officially 1.59
Information Authority Corporation Facility); Nationwide Construction transferred from Sta. Mesa, Manila
Technology Project location for CRS outlets location to the CRS Building on April
(Phase II) 01, 2019.

Ongoing Systems Development


activities.
APPROVED
IMPLEMENTING STAGE /
No. PROJECT TITLE PRIVATE PROPONENT REGION LATEST UPDATE PROJECT COST
AGENCY STATUS (in PhP Billion)

11 Cavite-Laguna Department of MPCALA Holdings , CALABARZON Under Ongoing construction of expressway 35.43
Expressway (CALAX) Public Works and Incorporated Construction bridges, clearings, testing of materials,
Project Highways (DPWH) bored piling, and tree-cutting activities
in Laguna Segment

As of July 18, 2019, 45.18% complete


for the Laguna Segment only.

Ongoing review and certification of the


remaining Detailed Engineering Design
by the IC; Ongoing ROW acquisition-
related activities.

12 Clark International Bases Conversion Megawide – GMR Joint Central Luzon Under Construction on-going; 78.72% 12.55
Airport Expansion and Development Venture Incorporated Construction complete as of August 31, 2019.
Project – Engineering, Authority (MGCJVI)
Procurement and
Construction (EPC)

13 LRT Line 1 Cavite Department of Light Rail Manila National Capital Region Under Pre- Ongoing soft renovation and upgrades 64.90
Extension and Transportation Corporation (consortium and CALABARZON Construction of LRT Line 1 existing system;
Operation & (DOTr) of Ayala Corporation,
Maintenance Metro Pacific Light Rail Ongoing soft renovation and upgrades
Corporation and of LRT Line 1 existing system;
Macquarie Infrastructure
Holdings) Construction of the Common Station
started on February 13, 2019.

Ongoing pre-construction activities:


ROW acquisition; Relocation of ISFs;
Utility diversion; Finalization of
alignment

Start of Works Ceremony held on May


07, 2019.

14 South Integrated Department of ARCA South Integrated National Capital Region Under Pre- Under Pre-Construction Activities 5.20
Transport System Transportation Terminal Incorporated Construction
(ITS) Project (Taguig (DOTr) (ASITI)
Integrated Terminal
Exchange)

15 Clark International Bases Conversion Luzon International Central Luzon Under Pre- Under Pre-Construction Activities 5.61
Airport Operations and and Development Premiere Airport Construction
Maintenance Project Authority Development Corporation
(LIPAD)
Status of PPP Projects Under Implementation - Unsolicited
As of September 30, 2019

Unsolicited Projects issued with Notice of Award (NOA) to the winning private proponent(s).

IMPLEMENTING PRIVATE APPROVED PROJECT


No. PROJECT TITLE REGION STAGE / STATUS LATEST UPDATE
AGENCY PROPONENT COST (in PhP Billion)

1 MRT Line 7 Project Department of SMC Mass Rail Central Luzon, Under 47.21% complete as of August 31, 2019. Civil Works 62.70
Transportation Transit 7, Inc National Capital Construction is 41.30% complete; and Rolling Stock and Electrical
Region & Mechanical Works is 53.60% complete.

2 NLEX-SLEX Connector Department of Manila North National Capital Under Pre- On-going pre-construction activities (Review of 23.20
Road Project Public Works and Tollways Region Construction DPWH of the DED and ROW acquisition)
Highways Corporation

3 Rehabilitation of Municipal Philippine Western Visayas Under Pre- On-going pre-construction activities 0.06
Municipal Government of Slaughterhouse Construction
Slaughterhouse, Kalibo Management Ground breaking ceremony held on June 13, 2019.
Operation and and Operations,
Maintenance of the Inc.
Whole Kalibo Meat
Plant

4 Bulacan International Department of San Miguel Central Luzon Under Pre- On-going Pre-construction activities 735.63
Airport Project (New Transportation Holdings Construction
Manila International Corporation
Airport)
Status of PPP Projects in the Pipeline - Solicited
As of September 30, 2019

Solicited Projects under early stages of development, approval and procurement.

APPROVED
No. PROJECT TITLE IMPLEMENTING AGENCY REGION STAGE / STATUS PROJECT COST
(in PhP Billion)
Road Transport Information Technology Department of Transportation (DOTr) National Capital Region Procurement Stage - Pre- 0.30
Infrastructure Project (Phase II) and Land Transportation Franchising qualification of Bidders
1
and Regulatory Board (LTFRB)

Baggao Water Supply Project Municipal Government of Baggao Cagayan Valley Procurement Stage - Pre- 0.08
2 qualification of Bidders

San Ramon Newport Project Zamboanga City Special Economic Zamboanga Peninsula Development Stage - Under TBD
3 Zone and Freeport Authority Redevelopment

NDC Admin and Commercial Complex National Development Corporation National Capital Region Development Stage - TBD
(formerly One DTI Building Complex Undergoing Studies
4
Project)

Central Luzon Link Expressway Department of Public Works and Central Luzon Development Stage - TBD
5 (CLLEX) Phase 1 O & M and Phase 2 Highways (DPWH) Undergoing Studies
Project
Philippine General Hospital (PGH) University of Philippines National Capital Region Development Stage - TBD
6 Diliman O & M PPP Project Undergoing Studies

Cebu City Solid Waste Management City Government of Cebu Central Visayas Development Stage - TBD
7 Project Undergoing Studies

General Santos Public Market Project City Government of General Santos SOCCSKSARGEN Development Stage - TBD
8 Undergoing Studies

Angat Hydroelectric Power Plant Metropolitan Waterworks and Sewerage Central Luzon Development Stage - TBD
(AHEPP) Project Rehabilitation, System Undergoing Studies
9 Operation and Maintenance of
Auxilliary #4 and #5

PGH Cancer Center Philippine General Hospital TBD Development Stage - TBD
10 Undergoing Studies

CCP Asset Development Project Cultural Center of the Philippines National Capital Region Development Stage - TBD
11 Undergoing Studies

Cagayan Valley Medical Center Cagayan Valley Medical Center/DOH Cagayan Valley Development Stage - Project TBD
12 Hemodialysis Unit Conceptualization

Baguio General Hospital Medical Baguio General Hospital and Medical Cordillera Administrative Region Development Stage - Project TBD
13 Center – Renal Center Building Project Center/Department of Health Conceptualization

UP Los Banos Agro-Insdustrial UP Los Banos CALABARZON Development Stage - TBD


Information and Technology Parks Undergoing Studies
14
Project

15 Water Supply Improvement and Bislig City Water District CARAGA Development Stage - Project TBD
Septage Project (Bislig City Water Conceptualization
District)
Status of PPP Projects in the Pipeline - Unsolicited
As of September 30, 2019

Unsolicited Projects under negotiation, approval and procurement.

IMPLEMENTING INDICATIVE PROJECT


No. PROJECT TITLE PRIVATE PROPONENT REGION STAGE / STATUS
AGENCY COST (in PhP Billion)

1 Quezon City Integrated Solid Quezon City Consortium composed of National Capital Region Procurement Stage - 22.00
Waste Management Facility Government Metro Pacific Investments Ongoing Challenge
Corporation, Covanta Energy Process
LLC, and Macquarie Capital
Limited

2 PEZA Electronic Payment and Philippine Economic I-Pay MYEG Philippines, Inc. National Capital Region Procurement Stage - 0.02
Collection System (EPCS) Zone Authority (IPMPI) Ongoing Preparation for
Project (PEZA) Challenge Process

3 Pasay City Reclamation Pasay City Ulticon Builders, Inc., Udenna National Capital Region Procurement Stage - 62.00
Project Government Corporation, and China Ongoing Challenge
Harbor Corporation Process
4 Pampanga Bulk Water Supply Provincial MetroPac Waters Investment Central Luzon Approval Stage - Under 15.80
Project (District 1, 3 & 4) Government of Corp. Negotiation
Pampanga
5 Pampanga Bulk Water Supply Provincial Manila Water Philippine Central Luzon Approval Stage - Under 6.50
(District 2) Government of Ventures Negotiation
Pampanga
6 Unsolicited Proposal for the Local Government of Philippine Primark Properties, Davao Region Approval Stage - Under 0.42
Redevelopment of the Panabo Panabo City (Davao Inc. Negotiation
Town Center del Norte)
7 East-West Rail Project Philippine National East West Rail Corporation National Capital Region Approval Stage - Under 55.46
Railways and AlloyMTD Evaluation by relevant
Approving Body

8 Manila Bay Integrated Flood Department of Public Coastal Development National Capital Region Approval Stage - Under 536.03 (not
Control, Coastal Defense and Works and Highways Consortium (San Miguel Evaluation by relevant including
Expressway Project * Holdings Corporation and New Approving Body reclamation cost)
San Jose Builders, Inc.)

9 50 year Integrated Mactan Cebu GMR-Megawide Central Visayas Approval Stage - Under 160.56
Development Plan for Mactan International Airport Evaluation by relevant
Cebu International Airport Authority Approving Body
(MCIA) Project *

10 Preservation and Laguna Lake San Miguel Holdings Corp CALABARZON, National Approval Stage - Under 905.12
Development of Laguna de Development (SMHC) and Muhibbah Capital Region Evaluation by relevant
Bay Project * Authority Engineering Philippines Corp Approving Body
(MEPC)

11 IT Project for the City of Naga, Naga City Local Cylis Technologies Central Visayas Approval Stage - Under 0.065
Cebu-UNLAD BAYAN Local Government Evaluation by relevant
Government Information Approving Body
System Project
12 Fort Bonifacio-Makati Skytrain Department of INFRACORP National Capital Region Approval Stage - Under 3.52
Project * Transportation Evaluation by relevant
Approving Body

13 C5 MRT-10 Project * Department of C5 Mass Transit Corporation National Capital Region Approval Stage - Under 80.17
Transportation Limited Evaluation by relevant
Approving Body

14 LRT 6 Cavite Line A * Department of Prime Asset Ventures Inc. CALABARZON Approval Stage - Under 56.27
Transportation (PAVI) Evaluation by relevant
Approving Body

15 Davao People Mover * Department of Udenna Corporation Davao Region Approval Stage - Under 30.00
Transportation Evaluation by relevant
Approving Body
16 Upgrade, Expansion, Department of Aboitiz InfraCapital, Inc. Central Visayas Approval Stage - Under 25.45
Operations and Maintenance Transportation Evaluation by relevant
of the New Bohol International Approving Body
Airport (Panglao) *
17 Davao International Airport Civil Aviation Chelsea Logistics Holdings Davao Region Approval Stage - Under 48.80
Development, Operation, and Authority of the Corp. Evaluation by relevant
Management * Philippines (CAAP) Approving Body

18 O & M and Facility Upgrade of Civil Aviation Mega 7 Construction Western Visayas Approval Stage - Under 3.84
Kalibo International Airport * Authority of the Evaluation by relevant
Philippines (CAAP) Approving Body
IMPLEMENTING INDICATIVE PROJECT
No. PROJECT TITLE PRIVATE PROPONENT REGION STAGE / STATUS
AGENCY COST (in PhP Billion)

19 MRT-11 Project * Department of Aerorail Integrated Transport National Capital Region Approval Stage - Under 71.10
Transportation Services, Inc. Evaluation by relevant
Approving Body

20 Cavite-Tagaytay-Batangas Department of Public MPCALA Holdings CALABARZON Approval Stage - Under 22.59
Expressway Project * Works and Highways Incorporated and Metro Pacific Evaluation by relevant
Tollways Corporation (MPTC) Approving Body

21 Upgrade, Expansion, Civil Aviation Aboitiz InfraCapital, Inc. Northern Mindanao Approval Stage - Under 42.70
Operations and Maintenance Authority of the Evaluation by relevant
of Laguindingan Airport Philippines (CAAP) Approving Body
("Laguindingan Airport
Project")*

22 Philippine Charity Philippine Charity Joint Venture of Verzontal National Capital Region Approval Stage - Under 2.50
Sweepstakes Office (PCSO) Sweepstakes Office Builders, Inc. (VBI) and Evaluation by relevant
Corporate Center Project (PCSO) Millennium Erectors Approving Body
Corporation (MEC)

23 Cebu Monorail Transit System Department of Udenna Infrastructure Central Visayas Approval Stage - Under 77.57
Project* Transportation Corporation Evaluation by relevant
Approving Body

24 North Luzon Express Terminal Department of North Luzon Express Central Luzon Approval Stage - Under 7.24
(NLET) Project* Transportation Terminal, Inc. Consortium Evaluation by relevant
Approving Body

25 Tourist Visa Section Online Bureau of Cloud Panda Ph Inc. National Capital Region Approval Stage - Under 20.20
System Project Immigration Evaluation by relevant
Approving Body

26 Ninoy Aquino International Department of NAIA Consortium (Aboitiz Infra National Capital Region Evaluation Stage - Project 350.00
Airport Project Transportation Capital, AC Infrastructure with Original Proponent
Holdings Corporation, Alliance Status
Global Group, Asia's
Emerging Dragon Corporation,
Filinvest Development
Corporation, JG Summit
Holdings, Metro Pacific
Investment Corporation)

27 Cavite LRT Line 6c and Sucat Department of Prime Asset Ventures Inc. CALABARZON Evaluation Stage - Project 157.02 (USD 3
Line 6b Projects Transportation (PAVI) with Original Proponent Billion;
Status USD1=PhP52.34)

28 Davao Sasa Port Philippine Ports Chelsea Logistics Holdings Davao Region Evaluation Stage - 18.70
Modernization Project Authority Corp. Proposal Under Evaluation
by Implementing Agency

29 Development, Operations and Philippine Ports Kudos Trucking Corp SOCCSKSARGEN Evaluation Stage - 4.00
Maintenance of General Authority Proposal Under Evaluation
Santos Port Project by Implementing Agency

30 No Contact Apprehension Quezon City TBD National Capital Region Evaluation Stage - TBD
Project (Quezon City) Government Proposal Under Evaluation
by Implementing Agency

31 Iloilo Commercial Port Philippine Ports International Container Western Visayas Evaluation Stage - 8.717
Complex and Port of Authority Terminal Services, Inc. (ICTSI) Proposal received by
Dumangas Development Implementing Agency
Project

32 Pay Parking and Commercial Marikina City Mr. Rodolfo P. Ang National Capital Region Evaluation Stage - 100.00
Building (Marikina City) Government Proposal received by
Implementing Agency

33 Management and Bicol University Wholegrain Land Inc. Bicol Region Evaluation Stage - TBD
Improvement of Bicol Proposal received by
University's Arcadia and Implementing Agency
Entrepreneurial Centrum

34 No Contact Apprehension Cauayan City, Qpax Traffic Systems, Inc., Cagayan Valley Evaluation Stage - 45.80
Program (Cauayan City, Isabela Proposal received by
Isabela) Implementing Agency

35 Integrated Waste Marikina City Manila Water Company, Inc. National Capital Region Evaluation Stage - 1.30
Management Project (Marikina Government and Manila Water Total Proposal received by
City) Solutions Corporation Implementing Agency
* Projects submitted directly to the Investment Coordination Committee (ICC), without PPP Center assistance prior to granting Original Proponent Status