T=W+R+S Mechanical Availability (MA) Phisycal Availability (PA) Use of Availability (UA) Effective Utilization (EU)

W = Jam jalan/operasi
R = Jam perbaikan/perawatan W W + S W W
MA= x 100% PA= x 100% UA = x 100% EU = x 100%
S = Jam Standby W + R T W + S T
T = Jam tersedia

CONTOH
W = 15 15 15 + 2 15 15
MA= x 100% PA= x 100% UA = x 100% EU = x 100%
R=4 15 + 4 21 15 + 2 21
S=2
T = 21 MA= 78.9% PA= 81.0% UA = 88.2% EU = 71.4%

AVAILABLE HOURS
OPERATION HOURS DELAY TIME IDLE BREAKDOWN REPAIR
24 jam perhari - (Standby+Repair) - P5M - no operator - PM (preventive maintenance)
(Record from Unit Hour meters ) - P2H - rain and slipery - BO (breack down yang sedang berjalan)
- transport
wait unit late - meal and rest - B1 (tunggu mekanik)
- hauling
wait unit - praying - B2 (tunggu spare part)
- loading - shift change - BS (breakdown schedule)
- waiting blast - cloudly - BS (breakdown unplanned)
- travel/manuver - no job / other
WORKED HOURS (W) STANBY HOURS (S) REPAIR HOURS (R)