Вы находитесь на странице: 1из 4

Project:

Location:
Qty
No. of
Item Detail L W H Elements Total Qty
A. Coffee Table
Post 1.2 6 7.2
FootRest 3.425 1 3.425
Slab Support (angle bar) 6.1 1 6.1
Slab 2.7 1 2.7

B. Coffee Stool
Post 0.9 12 10.8
Support 0.6 12 7.2
Slab 0.36 3 1.08

Total (Footing Qty)


Total Concrete Qty
TABLE
6 6

COFFEE TABLE
Quantity inc. 1-1/2 x 1-1/2
Openings Net Qty Allowance Allowance Unit 2x2 HSS Angle Bar

7.2 1 7.2 m 1.2


3.425 1 3.425 m 0.57083333
6.1 1 6.1 m 1.0166666667
2.7 1 2.7 m

10.8 1 10.8 m
7.2 1 7.2 m
1.08 1 1.08 m

38.505 38.505 1.77083333 1.0166666667


#REF! m3 #REF! #REF!

4.77083333 2.2166666667
CHAIR
3 6 6 3

FFEE TABLE BAR STOOL


1-1/2 x 1- Stepboar
Stepboard/Wo 1/2 Angle d/Wood
od Slab 2x2 HSS Bar Slab

0.9

1.8
1.2 1.2
0.36

0.9 3 1.2 0.36


#REF! #REF! #REF!

1.26
PROJECT: COFFEE BAR CONSTRUCTION
LOCATION: CONEL, GEN. SANTOS CITY
SUBJECT:

Scope of Works Description Qty Unit

1. COFFEE TABLE
Tubular Steel.2x2x1.5mm 2.00 pcs
Angle Bar.1-1/2" x 1-1/2" x 1.5mm 1.00 pcs
Stepboard 1.00 pcs
Sub-Materials Cost

2. BAR STOOL
Tubular Steel.1x2x1.5mm 1.00 pcs
Angle Bar.1-1/2" x 1-1/2" x 1.5mm 2.00 pcs
Stepboard 1.00 pcs
Sub-Materials Cost

3. CONSUMABLES
Plastic Varnish.Maple 2.00 bottles
Paint Brush.#1-1/2" 2.00 pcs
Teks Screw.#1-1/2" 1.00 pack
Epoxy Primer 1.00 quart
Paint.Gray 1.00 quart

Total Material Cost

Labor cost :
Designation Qty Rate/Day # of days
1. Skilled 1 4
Toatal labor cost =

Total Project cost =