Вы находитесь на странице: 1из 6

A

Report
Of

Industrial Training
Starting date of training: 15/05/2019
End date of training: 25/06/2019

Submitted to,
MSBTE
In Partial Fulfilment of Requirement of Diploma Of
Civil Engineering Final Year
2019-2020
Under I Scheme
Submitted by,

Under the guidance of,


Mr. P. D. Naik

FOR ACADEMIC YEAR 2018-2019

YASHWANTRAO BHAONSALE POLYTECHNIC,


SAWANTWADI.
Maharashtra State
Board of Technical Education

Certification of Completion
Of Industrial Training
(By respective Head of the Institute and Head of the Department)

This is to certify that Ms. Sejal Santosh Kumar Dalvi with Enrolment No. 1717420001 has
successfully completed Industrial Training (220490) in Shree Mahalaxmi Architect and
Structural Consultancy from 15 May 2019 to 25 June 2019 for partial fulfilment towards
completion of diploma in civil Engineering from Yashwantrao Bhonsale Polyethnic
Institute Code 1742.

Signature Signature
Head of Department Head of the Institute

Seal of
Institute
Abstract:

This industrial training of 6 week duration was introduced to all diploma programmers with
an objective to develop the traits of industry culture among the students before we enter into
the world of industry. By exposing and interacting with the real life industrial setting,
students will appreciate and understand the actual working of an industry, best practises
adopted in industry. The industrial skills like, soft skills, life skills and hands-on will be
inculcated among the student. This short association with industry will be instrument in
orienting the students in transforming us into industry ready output after completion of
diploma programme.
Acknowledgement:
As per our Msbte syllabus we took summer training at an industry. The internship
opportunity I had with Shree Mahalakshmi architect and structural consultancy was a great
chance for learning and professional development. Therefore, I consider myself as a very
lucky induvial as I was provided with an opportunity to be a part of it.

I am using this opportunity to express my deepest gratitude and special thanks to Mr.
Madhukar Shirshat sir our supervisor and Mr. P. D. Naik sir our mentor who in spite of being
busy with their duties, took time out to guide and explain me the construction procedure up to
the plinth level allowing me to carry out my report work during the training.

Lastly, I would like to thank the institute and my parents for their moral support and my
friends with whom I shared my day to day experience and received lots of suggestion that
improved my quality of work.

Sejal S. Dalvi
V semester
Civil engineering Department
Sawantwadi
1.0 Organizational structure of industry

Shree Mahalaxmi Architect And Structural Consultancy

Mr. Madhukar Suryakant Sirsat Mr. Mahadev Shripad Walke


(B.E.Civil, A.MIE, C. Engg.) (Arch
Chapter 9
Description of the project
Excavation
Solling
Pcc

Excavation
Excavation work on the site was being done by the JCB machine and excavated soil was
transferred using dumpers.
Excavation procedure for foundation construction requires site clearance, setting out,
excavation and safety measures based on depth of excavation
Site clearance before excavation for foundation
Before the excavation for the proposed foundation, the site was being cleared of vegetation,
brushwood, stumps of trees etc. roots of the trees was beign removed to atleast 30 cm below
the foundation level. The pits formed due to roots of trees, old foundation etc. was beign
filled up with soil and compacted.
Setting out foundation layout for excavation
For setting out layout of foundation excavation, a benchmark was being established at the site
by a masonry pillar and connected to the nearest standard benchmark.
The centre lines of the walls were marked by stretching strings across wooden planks driven
at the boundary.