Question

The problems of congestion, bottlenecks and backtracking can not be visualized by using
templates and models.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer


Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Process capability of machine , Delivery Dates , Order Quantity

Multiple Choice Single Answer


Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Both forecast and pending orders

True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of
layout
Correct Answer
False
Your Answer
True

Multiple Choice Single Answer


Question
In exponential smoothing method,for a stable demand pattern and better smoothing effect,
value of fraction( Alpha) selected is
Correct Answer
0.05 to 0.10
Your Answer
0.05 to 0.10

True/False
Question
Recording of movement is not necessary in case of method study in any form.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer


Question
Which of the following may be the objectives of project crashing?
Correct Answer
To complete the project in the least possible time , To reduce project cost below it's normal
cost , To achieve uniformity in requirement of resources
Your Answer
To complete the project in the least possible time , To reduce project cost below it's normal
cost , To achieve uniformity in requirement of resources

Multiple Choice Single Answer


Question
Which is the next stage to the inspection based quality control in the historical development
of quality management.
Correct Answer
Quality assurance
Your Answer
Total Quality management

Select The Blank


Question
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance

Multiple Choice Single Answer


Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity

Select The Blank


Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring

True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought out
components, subcontract items prior to any operation, assembly.
Correct Answer
True
Your Answer
True

Select The Blank


Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level

Multiple Choice Single Answer


Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements

Multiple Choice Multiple Answer


Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible
delays in delivery date commitment to sales department , Devising cures to keep rate of
production in line with schedule
Your Answer
Progress chasing to identify delays which may hold up production , Communicating possible
delays in delivery date commitment to sales department , Devising cures to keep rate of
production in line with schedule

Select The Blank


Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control

True/False
Question
A load chart specifies the work to be carried out by each person of company during shift
hours.
Correct Answer
False
Your Answer
False

Match The Following


Question
Correct Answer
Your Answer
Pessimistic time
b
b
Expected time
Te
Te
Optimistic time
a
a
Most likely time
m
m

True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer
False
Your Answer
True

Select The Blank


Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer
Maintenance
Your Answer
Maintenance

Multiple Choice Single Answer


Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs

Select The Blank


Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk

Multiple Choice Multiple Answer


Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer


Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost

Multiple Choice Multiple Answer


Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings

True/False
Question
short cycle job should be studied for macroscopic motions.
Correct Answer
False
Your Answer
True

Select The Blank


Question
The ________ is a set of tools and techniques by which products are made to comply with
the specifications at minimum cost to the firm.
Correct Answer
Quality control system
Your Answer
Quality control system