Вы находитесь на странице: 1из 1

Alor BH‐02

Waingapu BH‐03

Namlea BH‐02
CALCULATION OF SHALLOW BEARING CAPACITY
Scope Title : Soil Investigation Namlea Made By :
Project Title : Mobile Power Plant & Fixed Type Gas Engine Power Plant Package II (Fixed Power Plant) PLTMG Namlea 10MW Prepared By : Siti Aisyah Anandayu
Borehole Number : BH‐02 Checked By : Zulfikar / Anita Lestari
Method  : Meyerhoff (1963) Approved By : Benny Iriawan
1. B x L = 1 x 1m, BH‐02 Hal.150 Hary Christadi
qultimate  qultimate  qallowable 
2
Depth Elevation Cu Ø Tan  (45 + Ø/2) γ D B L Nq Nc Nγ sc sq, sγ dc dq, dγ ic,iq, iγ Po qc qq qγ (Meyerhoff,  (Meyerhoff,  (Meyerhoff, 
1963) 1963) 1963), SF=3
NSPT
Faktor 
Tan2 (45 +  Faktor Bentuk  Faktor Kedalaman  sq.dq.iq.p sγ.dγ.iγ.0,5
m mMSL (kPa) 45 + Ø/2 (kN/m3) m m m Faktor Kapasitas Dukung Kemiringan  kN/m2 sc.dc.ic.c.Nc (kPa) T/m2 T/m2
Ø/2) Pondasi Pondasi o.Nq .B'.γ.Nγ
Beban
0 6.682 0 0 0 45 1.000 17.0 0 1 1 1.000 5.140 0.000 1.200 1.100 1.000 1.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.5 6.182 11 0 30 60.1 1.739 17.0 0.5 1 1 18.400 30.140 15.670 1.348 1.174 1.174 1.087 1.000 8.492 0.000 199.368 169.788 369.157 36.916 12.305
1 5.682 30 0 36 63 1.963 17.0 1 1 1 37.750 50.590 44.430 1.393 1.196 1.393 1.196 1.000 16.983 0.000 917.474 539.912 1457.386 145.739 48.580
1.5 5.182 46 0 40 65.2 2.164 17.0 1.5 1 1 64.200 75.310 93.690 1.433 1.216 1.649 1.325 1.000 25.475 0.000 2635.295 1281.935 3917.230 391.723 130.574
2 4.682 60 0 42 66.2 2.267 17.0 2 1 1 85.370 93.710 139.320 1.453 1.227 1.907 1.453 1.000 33.967 0.000 5170.262 2109.409 7279.671 727.967 242.656
2.5 4.182 60 0 42 66.2 2.267 17.0 2.5 1 1 85.370 93.710 139.320 1.453 1.227 2.134 1.567 1.000 42.459 0.000 6966.907 2273.936 9240.843 924.084 308.028
3 3.682 60 0 42 66.2 2.267 17.0 3 1 1 85.370 93.710 139.320 1.453 1.227 2.360 1.680 1.000 50.950 0.000 8965.184 2438.463 11403.647 1140.365 380.122

Serui BH‐01
CALCULATION OF SHALLOW BEARING CAPACITY
Scope Title : Soil Investigation Serui Made By :
Project Title : Mobile Power Plant & Fixed Type Gas Engine Power Plant Package II (Fixed Power Plant) PLTMG Serui 10MW Prepared By : Siti Aisyah Anandayu
Borehole Number : BH‐01 Checked By : Zulfikar / Anita Lestari
Method  : Meyerhoff (1963) Approved By : Benny Iriawan
1. B x L = 1 x 1m, BH‐01
qultimate  qultimate  qallowable 
2
Depth Elevation Cu Ø Tan  (45 + Ø/2) γ D B L Nq Nc Nγ sc sq, sγ dc dq, dγ ic,iq, iγ Po qc qq qγ (Meyerhoff,  (Meyerhoff,  (Meyerhoff, 
1963) 1963) 1963), SF=3
NSPT
Faktor 
Tan2 (45 +  Faktor Bentuk  Faktor Kedalaman  sc.dc.ic.c.N sq.dq.iq.p sγ.dγ.iγ.0,5
m mMSL (kPa) 45 + Ø/2 (kN/m3) m m m Faktor Kapasitas Dukung Kemiringan  kN/m2 (kPa) T/m2 T/m2
Ø/2) Pondasi Pondasi c o.Nq .B'.γ.Nγ
Beban
0 2.065 0 0 0 45 1.000 18 0 1 1 1.000 5.140 0.000 1.200 1.100 1.000 1.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.5 1.565 12 12.5 0 45 1.000 18 0.5 1 1 1.000 5.140 0.000 1.200 1.100 1.100 1.050 1.000 9.000 84.810 10.395 0.000 95.205 9.521 3.174
1 1.065 25 25 0 45 1.000 18 1 1 1 1.000 5.140 0.000 1.200 1.100 1.200 1.100 1.000 18.000 185.040 21.780 0.000 206.820 20.682 6.894
1.5 0.565 40 50 0 45 1.000 18 1.5 1 1 1.000 5.140 0.000 1.200 1.100 1.300 1.150 1.000 27.000 400.920 34.155 0.000 435.075 43.508 14.503
2 0.065 51 0 41 65.5 2.194 19.4 2 1 1 73.900 83.860 113.990 1.439 1.219 1.878 1.439 1.000 38.800 0.000 5030.968 1940.054 6971.022 697.102 232.367
2.5 ‐0.435 52 0 41 65.5 2.194 19.4 2.5 1 1 73.900 83.860 113.990 1.439 1.219 2.097 1.549 1.000 48.500 0.000 6768.232 2087.986 8856.218 885.622 295.207
3 ‐0.935 56 0 42 66 2.246 19.4 3 1 1 85.370 93.710 139.320 1.449 1.225 2.348 1.674 1.000 58.200 0.000 10184.278 2770.047 12954.325 1295.433 431.811

RESUME
Borehole Elevation Qall
Location
Point (m) (T/m2)
Alor BH-02 -1.5 170
Waingapu BH-03 -1.5 150
Namlea BH-02 -1.5 130.574
Serui BH-01 -1.5 14.503 So, the lowest Qall is from Serui = 14.503 ton/m2