Directorate of Education, under Priorty II. SH: C/o 162 Nos. of additional SPS class rooms
at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt.
S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under
Education Maintenance South West Division, PWD Delhi including internal & external
water supply, sanitary installation, electrical installations, development of site and fire
fighting system etc. (Package-H)
S.1NoItem
9.2NoBrief Description
Providing and laying in position cement Unit
cum Quantit
9.90 Co-1.30 Req ( in
12.87
concrete 1:5:10 y efficient Qtls.)
TOTAL (Qtls/ 12.87
Unit)
ADD 2% 0.26
TOTAL 13.13
BAGS 26.25
SAY 26.00
QUANTITY ISSUE BAGS
NAME OF THE WORK :Construction of additional SPS type classrooms in Govt. Schools,
Directorate of Education, under Priorty II. SH: C/o 162 Nos. of additional SPS class rooms
at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt.
S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under
Education Maintenance South West Division, PWD Delhi including internal & external
water supply, sanitary installation, electrical installations, development of site and fire
fighting system etc. (Package-H)
DOM 26.12.2019
DESCRIPTION No. LENGTH BREADTH DEPTH QUANTITY UNIT
SCAV C-Block Inderpuri
NOS LENGTH BREADTH AREA
Near primary class room 1 24.72 9.33 230.64
Play ground side 1 24.82 9.33 231.57
Play ground side 1 24.90 9.33 232.32
with B/w RHS 1 24.82 9.33 231.57
with B/w RHS 1 24.65 9.33 229.98
Main Gate LHS 1 24.82 9.33 231.57
Total A 1387.65 Sqm
C/o T.C.M.B/ Pg-
Item .Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5
No.1 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as
directed by Engineer-in-charge
DOM 01.03.2019
DESCRIPTION No. LENGTH BREADTH DEPTH QUANTITY UNIT
Dwarka 16A
Grit no 10/c F3 1 3.30 3.50 1.50 17.33
Grit no 9/c F2 1 4.00 4.20 1.50 25.20
Grid no 4/c,5/c,6/c,7/c,8,/c 5 3.80 4.00 1.50 114.00
F3
Total 156.53 CUM
C/o T.C.M.B/ Pg-
Item . Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up
No.9 to plinth level :
9.1 a)1:5:10 (1 cement :5 coarse sand (Zone -III) :10 graded stone aggregate 40 mm nominal size)
DOM 02.03.2019
DESCRIPTION No. LENGTH BREADTH DEPTH QUANTITY UNIT
Dwarka 16A
Footing 10/c 1 3.19 3.40 0.10 1.08
Footing 9/c 1 3.90 4.10 0.10 1.60
Footing 4/c,5/c,6/c,7/c,8/c 5 3.70 3.90 0.10 7.22
DOM 04.03.2019
DESCRIPTION No. LENGTH BREADTH DEPTH QUANTITY UNIT
Dwarka 16A
F3Grid 10/c 1 3.00 3.20 0.70 6.72
F2Grid 9/c 1 3.70 3.90 0.70 10.10
F1 Grid8/c,7/c,6/c,5/c,4/c 5 3.50 3.70 0.75 48.56
Padestal Grid 7 1.00 0.80 0.45 2.52
8/c,7/c,6/c,5/c,4/c,9/c,10/c
DOM 26.12.2018
DESCRIPTION No. LENGTH BREADTH DEPTH QUANTITY UNIT
SKV RajNagar-1
NOS LENGTH BREADTH AREA
Near raning class room 1 47.49 8.9 422.66
Total B 422.66 Sqm
TOTAL(B) 422.66 Sqm
C/o T.C.M.B/ Pg-
Steel Consumption Statement
1ST Running Bill
Name of Work: :Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 162 Nos.
of additional SPS class rooms at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt. S(Co.Ed)V, Inderpuri
(School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under Education Maintenance South West Division, PWD Delhi including internal
& external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-H)
Upto date Qty Consumed i/c + 2% 142.02 193.12 206.18 2624.87 555.62 442.61 4164.42
Variation
Upto date Qty Consumed i/c + 2% 136.45 185.55 198.09 2521.94 533.83 425.25 4001.11
Variation
Kgs Kgs Kgs Kgs Kgs Kgs Kgs
(C.P.W.A.-23 )
Certified that this Measurement Book contains 1 to pages and all are numbered
Executive Engineer,
Edu. Maint. Div.(SW)
Rama Road, Zakhira
New Delhi
Assistant Engineer
Executive Engineer
Test Check Statement
Division - Edu. Maint. Div.(South West) Sub Divn.- IV
Name of Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH:
work: C/o 162 Nos. of additional SPS class rooms at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid
Captain Amit Verma Govt. S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027)
under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary
installation, electrical installations, development of site and fire fighting system etc. (Package-H)
Certified that Test check done by AE is more than 50 % and EE test check is more than
10% ,hence in order
6 I.S.M.B 1 Lot One Test Each Lot 1 Lot 1 1 Test results awaited
(Final payment must invariably be made on forms Printed on Yeloow paper which should not be used intermediate payment)
[For Contractor: This form provides for (1) advance payments (2) Payments for Measured Works. The form of Account
Secured Advance which has been printed separtely should be attached, where necessary]
6.The Contractor has made his own arrangement for water & electricity.
7. The Contractor has engaged technical staff as per Clause-36 of agreement.
8. No Minor Labour has been employed by the contractor.
9. No QC/CTE Para Pending against this work
10. All the field & laboratory test have been carried out and the result found satisfactory.
11. All the field & laboratory test have been carried out and found satisfactory.
Carried Over
1 2 3 4 5 6 7
Rs.
N.B. -- When there are two or more entries in column 6 relating to each Sub-head of estimate they should, in case of work the accounts of which are kept by sub-heads, be totalled and the total recorded
in column 7 for posting the work abstract. II. Certificate & Signature
1. The measurement on which are based the entries in column 1 to 6 of account I were made by M/s Multi tech Construction Company. And checked by M/S Prashant Anand (J.E.) on and
are recorded at page 01 to of CMB No. - ........
2. *Certificated that in addition to and quite apart from the quantities of work actually executed as shown in column 4 of the account 1, some work has actually been doen in connection with several
items and the value of such work (after deducting thereform proportionate amount………NIL.………of secured advance if any ultimately recoverable on account of the quantities of the materials
1.Total value of work actually measured, as per Act.1, col.5 entry (A)
2.Total up-to-date, advance payment for work not yet measured, as per details given below:- (B)
Rs. P.
(a) Total as per Previous bill …………………………………………………………….
(b) Since Previous bill ……………….. as per page …………………of M.B. No. ………… (D)
3.Total "up-to-date secured advance on security of materials as per annexure (Form 26A) Col. 8 Entry (C)
4. Total items (1 + 2 + 3)
5. Deduct amount withold
(a) From previous bill as per last Running Account Bill…………….
(b) From this Bill…………….
4 SGST @ 1% on Rs. -
5 CGST @ 1% on Rs. -
Total (B)
By Cheque
(IV. Remarks)
This space is reserved for any remarks which the Disbursing Officer or the Divisional Officer may wish to record in respect of
the execution of the work, check of measurement or the state of contractor's amount).
FOR USE IN DIVISIONAL OFFICER
Checked
Audited Reviewed
Auditor Superintendent Gazetted officer Gazetted Officer
onal Accountant
Recoveries
Security Deposit @
2.5% Restricted to
tender amount
Now to be recovered 9827345.00
Income Tax @ 2% on
(A)
Now to be recovered 9827345.00
Labour Cess @ 1%
on (A)
Now to be recovered 9827345.00
Less SGST @1% on
(A)
Now to be recovered 9827345.00
Less CGST @1% on
(A)
Now to be recovered 9827345.00
17 Steel reinforcement for R.C.C. work including 56.60 56.00 Test Result Awaited
straightening, cutting, bending, placing in position
and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D
or more
19 Providing and laying in position machine batched 6446.45 6300.00 Curing is in progress
and machine mixed design mix M-25 grade cement
concrete for reinforced cement concrete work, using
cement content as per approved design mix,
including pumping of concrete to site of laying but
excluding the cost of centering, shuttering, finishing
and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to
accelerate, retard setting of concrete, improve
workability without impairing strength and durability
as per direction of Engineer-in-charge.(Note :-
Cement content considered in this item is @ 330
kg/cum. Nothing extra beyond using 330 kg/cum
shall be paid, however, less cement if used, shall be
recovered).
All works upto plinth level