Академический Документы
Профессиональный Документы
Культура Документы
650 7000
1500 2000
400
FOUNDATION FOR COOLING TOWER - 1
400
FOUNDATION FOR COOLING PUMP 400Lx400Wx500H x6 Nos
WEIGHT: 2150 Kg
3000Lx2000Wx250H mm 400Lx400Wx600H x1 Nos
WEIGHT: 756 Kg
5600
3000
500 FOUNDATION FOR COOLING TOWER - 2
250 400Lx400Wx500H x6 Nos
FOUNDATION FOR CONTROL PANEL WEIGHT: 2150 Kg
400Lx400Wx600H x1 Nos
800Lx500Wx250H mm
WEIGHT: 250 Kg
800
2050
FOUNDATION FOR SUMPIT PANEL
500 400
500Lx400Wx250H mm
400
WEIGHT: 40 Kg
C
400
2200Lx1300Wx1500H mm
1500 2200
HOLD
14000
20000
EXPOSED 650 7000 CT
FACTORY 01
280 kW, 880 L/min
GFL±0 GFL±0 1500 2000
400
400
EXPOSED
5600
GFL±0 GFL±0
3000
800 L/min
15
30 mH 2O
500
250
800
CT-PANEL
2050
500 400
C
SP-PANEL
400
CT
02
400 280 kW, 880 L/min
1300
008Ø
1500 2200
SUMPIT
50 l/min x2
Scale 1/40
12mH2O
20000
B
EXPOSED
FACTORY
GFL±0 GFL±0
20000
EXPOSED
FACTORY
GFL±0 GFL±0
2000
A
EXPOSED
GFL-100 GUTTER W150X150
GFL-100 ELECTRIC/MACHINE
EXPOSED
CH=4000 GFL±0 GFL±0
STAIRCASE 2
BUFFER
GFL±0 GFL-30
H=150 H=150 H=150 H=150 GFL±0~-150GFL±0~-150 CH=3000
OFFICE CH=3000
EXPOSED CH=GFL+2650 MEASUREMENT
GFL±0 GFL±0
EXPOSED CH=GFL+2650 GFL±0 GFL±0
COMPRESSOR TOILET-1
STAIRCASE 1 TOILET-2
GFL±0 GFL±0 GFL-50~-100 GFL-150
GFL±0 GFL-30 GFL-50~-100 GFL-150 BRICK WALL H200
H=150 H=150 H=150 CERAMIC TILE
H=150
CERAMIC TILE
H=200 FLOOR DRAIN
GFL-130 GFL-130
A1
R150
R150
0
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
SITE PLAN
Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
B. Approved as noted KAJIMA VIETNAM CO.,LTD SMC Manufacturing (Vietnam) 1nd Factory - Factory 10 Engineer :
PHAM ANH TUAN
Date Issued :
29 OCT.19
SMC-14004-TSV-DD-RFB-01
Status C. Re submit SMC MANUFACTURING SUB-CONTRACTOR : Building name : Drawing Title : Job No.
NGUYEN H.V. BAO 29 OCT.19
By: (VIETNAM ) CO.,LTD. COOLING TOWER
Date: TAKASAGO VIETNAM CO., LTD FACTORY 10
REQUEST FOUNDATION
Approved :
REI MIURA
Scale : 1/250
1/500
CDA-LA-100 A
BOP=6180
A B C D
1000Wx300H 700Wx300H
LA-20A
FOR : FF 50A, CDA 40A, FOR : PCWS 150A 375
WW 40A, PWW 50A PCWR 150A
BV-25A & WS 50A 1000 2700 700
CDA-LA-100 A CDA-LA-100 A CDA-LA-100 A
15 BOP=6180 BOP=6180 BOP=6180
A D E
PIPE RACK
500 500
3000
1/20
B
550
BRICK WALL OPENING
1000Wx300H
CRANE WORKING AREA
FOR : FF 50A, CDA 40A, 15460
10000
CLEANING ROOM
GLF 0= EL+42.70
625
A
1500
SSD 2820
PVC 100φ W/VALVE
1 250 250
300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300
1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100
Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-02 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > OPENING REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200
PIPE RACK TO FAC 10
DESIGN BY KVN
A D E
PIPE RACK
500 500
3000
1/20
B
550
CRANE WORKING AREA
15460
WASTE STORAGE
GFL±0=EL+42.70
10000
10000
CLEANING ROOM
GLF 0= EL+42.70
1500
SSD
PVC 100φ W/VALVE
1
300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300
1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100
Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-03 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > PIPE RACK REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200
A D E
PIPE RACK
500 500
3000
1/20
B
250
550
2330
2500
OPENING Ø60mm OPENING Ø60mm
FOR CDA PIPING FOR WS PIPING
600
WASTE STORAGE
GFL±0=EL+42.70
10000
10000
CLEANING ROOM
GLF 0= EL+42.70
OPENING Ø60mm
FOR WS PIPING OPENING Ø60mm
OPENING Ø60mm OPENING Ø60mm FOR CDA PIPING
FOR WS PIPING FOR CDA PIPING
250
250
A
1500
SSD 750 500 4500 7050 1950
PVC 100φ W/VALVE
1
300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300
1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100
Legend:
Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-04 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > CEILING OPENING REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200