Вы находитесь на странице: 1из 4

RFB-01

650 7000

1500 2000

400
FOUNDATION FOR COOLING TOWER - 1

400
FOUNDATION FOR COOLING PUMP 400Lx400Wx500H x6 Nos
WEIGHT: 2150 Kg
3000Lx2000Wx250H mm 400Lx400Wx600H x1 Nos
WEIGHT: 756 Kg

5600
3000
500 FOUNDATION FOR COOLING TOWER - 2
250 400Lx400Wx500H x6 Nos
FOUNDATION FOR CONTROL PANEL WEIGHT: 2150 Kg
400Lx400Wx600H x1 Nos
800Lx500Wx250H mm
WEIGHT: 250 Kg
800

2050
FOUNDATION FOR SUMPIT PANEL
500 400

500Lx400Wx250H mm

400
WEIGHT: 40 Kg
C

400

SUMPIT FOR COOLING DRAIN WATER


1300
008Ø

2200Lx1300Wx1500H mm

1500 2200

HOLD

14000
20000
EXPOSED 650 7000 CT
FACTORY 01
280 kW, 880 L/min
GFL±0 GFL±0 1500 2000

400

400
EXPOSED

FACTORY 10 - FOUDATION FOR COOLING TOWER


FACTORY CP
x3
01

5600
GFL±0 GFL±0

3000
800 L/min

15
30 mH 2O

500

250
800
CT-PANEL

2050
500 400
C
SP-PANEL

400
CT
02
400 280 kW, 880 L/min

1300
008Ø

1500 2200
SUMPIT
50 l/min x2

Scale 1/40
12mH2O

20000
B

EXPOSED
FACTORY
GFL±0 GFL±0

20000
EXPOSED
FACTORY
GFL±0 GFL±0

2000

A
EXPOSED
GFL-100 GUTTER W150X150
GFL-100 ELECTRIC/MACHINE
EXPOSED
CH=4000 GFL±0 GFL±0
STAIRCASE 2
BUFFER
GFL±0 GFL-30
H=150 H=150 H=150 H=150 GFL±0~-150GFL±0~-150 CH=3000
OFFICE CH=3000
EXPOSED CH=GFL+2650 MEASUREMENT
GFL±0 GFL±0
EXPOSED CH=GFL+2650 GFL±0 GFL±0
COMPRESSOR TOILET-1
STAIRCASE 1 TOILET-2
GFL±0 GFL±0 GFL-50~-100 GFL-150
GFL±0 GFL-30 GFL-50~-100 GFL-150 BRICK WALL H200
H=150 H=150 H=150 CERAMIC TILE
H=150
CERAMIC TILE
H=200 FLOOR DRAIN
GFL-130 GFL-130

A1

R150
R150

0
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SITE PLAN

Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
B. Approved as noted KAJIMA VIETNAM CO.,LTD SMC Manufacturing (Vietnam) 1nd Factory - Factory 10 Engineer :
PHAM ANH TUAN
Date Issued :
29 OCT.19
SMC-14004-TSV-DD-RFB-01
Status C. Re submit SMC MANUFACTURING SUB-CONTRACTOR : Building name : Drawing Title : Job No.
NGUYEN H.V. BAO 29 OCT.19
By: (VIETNAM ) CO.,LTD. COOLING TOWER
Date: TAKASAGO VIETNAM CO., LTD FACTORY 10
REQUEST FOUNDATION
Approved :
REI MIURA
Scale : 1/250
1/500
CDA-LA-100 A
BOP=6180
A B C D

STEEL OPENING STEEL OPENING


BV20A Drain
EXISTING

1000Wx300H 700Wx300H

LA-20A
FOR : FF 50A, CDA 40A, FOR : PCWS 150A 375
WW 40A, PWW 50A PCWR 150A
BV-25A & WS 50A 1000 2700 700
CDA-LA-100 A CDA-LA-100 A CDA-LA-100 A
15 BOP=6180 BOP=6180 BOP=6180

A D E

PIPE RACK
500 500

3000
1/20
B

550
BRICK WALL OPENING
1000Wx300H
CRANE WORKING AREA
FOR : FF 50A, CDA 40A, 15460

WW 40A, PWW 50A


WASTE STORAGE & WS 50A 1000
GFL±0=EL+42.70
10000

10000
CLEANING ROOM
GLF 0= EL+42.70

BRICK WALL OPENING BRICK WALL OPENING


250Wx200H 250Wx200H
FOR : WW 40A, PWW 50A FOR : WS 25A, CDA 25A

625
A

1500
SSD 2820
PVC 100φ W/VALVE
1 250 250

300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300

SUMP PIT SCRUBBER FOUNDATION


W1.5m x D1.5m x H1.5m W3000 X L11200, w/RC CURB H250
FOUNDATION FOR PUMP
W1.0m x L2.5m x H0.2m

1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100

Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-02 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > OPENING REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200
PIPE RACK TO FAC 10
DESIGN BY KVN
A D E

PIPE RACK
500 500

7225 1150 625

3000
1/20
B

550
CRANE WORKING AREA
15460

WASTE STORAGE
GFL±0=EL+42.70
10000

10000
CLEANING ROOM
GLF 0= EL+42.70

1500
SSD
PVC 100φ W/VALVE
1

300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300

SUMP PIT SCRUBBER FOUNDATION


W1.5m x D1.5m x H1.5m W3000 X L11200, w/RC CURB H250
FOUNDATION FOR PUMP
W1.0m x L2.5m x H0.2m

1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100

Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-03 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > PIPE RACK REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200
A D E

PIPE RACK
500 500

3000
1/20
B

250
550
2330

2500
OPENING Ø60mm OPENING Ø60mm
FOR CDA PIPING FOR WS PIPING

CRANE WORKING AREA


15460

600
WASTE STORAGE
GFL±0=EL+42.70
10000

10000
CLEANING ROOM
GLF 0= EL+42.70

OPENING Ø60mm
FOR WS PIPING OPENING Ø60mm
OPENING Ø60mm OPENING Ø60mm FOR CDA PIPING
FOR WS PIPING FOR CDA PIPING

250

250
A

1500
SSD 750 500 4500 7050 1950
PVC 100φ W/VALVE
1

300
290
3000
1000 1900 1500 SUMP PIT 11200
300X300X300

SUMP PIT SCRUBBER FOUNDATION


W1.5m x D1.5m x H1.5m W3000 X L11200, w/RC CURB H250
FOUNDATION FOR PUMP
W1.0m x L2.5m x H0.2m

1 2 3 4 - CDA SYSTEM
SUB-BUILDING 5 6 7 8
Scale 1/100

Legend:

CEILING OPENING Ø60mm FOR WATER SUPPLY PIPING x4 Nos


CEILING OPENING Ø60mm FOR CDA PIPING x2 Nos

Rev Description Date CONTRACTOR : Project Title : Drawn by : Date Drawn : Shop Drawing No. Revisions
A. Approved CLIENT
PHAM ANH TUAN 18-Nov-19
B. Approved as noted SMC Manufacturing (Vietnam) 1nd Factory - Factory 10
Status SMC MANUFACTURING Engineer : Date Issued : SMC1.10-14004-TSV-DD-RFB-04 00
C. Re submit
SUB-CONTRACTOR : Building name : Drawing Title : N H V BAO 18-Nov-19 Job No.
By: (VIETNAM ) CO.,LTD.
Date: TAKASAGO VIETNAM CO., LTD < SUB-BUILDING > CEILING OPENING REQUEST Approved :
REI MIURA
Scale : A1: 1/100
A3: 1/200

Вам также может понравиться