Exhibit 4 - Microwave AT Format

Product Name
The responsibilities specified shall apply as from
MSP if not otherwise stated.
The ambit of this ATP is to specify ATP for MW
Link & Network Performance, or as may be
amended or added to in accordance with Mutual
Agreement.

Unless agreed otherwise, all amendments to this


ATP must be recorded in writing and
implemented in accordance with the agreement.

Site Details

Planned
Site A
Site ID MUL3570
Site Name Shastri Nagar
Site Address Kalewadi Phata, Gajanan Nagar
Site Type (Indoor/Outdoor/IBS) OUTDOOR
Locator ID
TOCO( Indus,Infratel.GTL, Bharti Owned) Indus
ToCo Site ID IN-1362794
Site Lat/Long 18.60397/73.78107
Azimuth to other site 7.05
Tower Height 30
Antenna Size (0.3, 0.6, 0.9, 1.2, 1.8 Mtrs) ML15 0.6m HP
Antenna Height (AGL- meters ) 29
Antenna Polarization (Horizontal / Vertical) (As per V
planning guidelines)

No. of Strut Rods installed (0/1/2) for 1.2/ 1.8 mtr


antennas (1.8M-2 Rods, 1.2M- 1 Rod is mandatory) NA

Path Length (kms) 0.48


FM Engg Name Rajiv Ranjan
Zone MH&G
Functional Test/Commissioning and
Acceptance

Planned
Site A
Type of Equipment (MLE/MLTN, HC, FHY, FHO,
Ceragon, NEC, Huawei, DragonWave Etc.) Ceragon

TDM Link Capacity (4E1, 16E1,32E1, 75E1 Etc.) 4,E1


Ethernet Link Capacity (Mbps Etc.) 233
Software Version IDU
(latest available version) 27K

Software Version ODU


(latest available version) R1E

IDU/Magazine ( New/Existing) EXITING


System Configuration ( PDH/ SDH/ Hybrid/ Packet) PACKET

Link configuration ( 1+0 / 1+1 / 2+0/ XPIC/1G) 1+0


Switch card redundancy (Y/N) N
Optical card redundancy (Y/N) N
Power card redundancy (Y/N) N
IDU Model IP10
Sl. No. of IDU NA
ODU Model NA
Sl. No. of ODU NA
Power Supply to ODU through PoE or direct
External Power Injector (Y/N)
Type of external Power Injector (2/4/8 port,
Indoor/outdoor)

Planned
Site A

Number of outdoor weatherproof CAT-6 cables 1

Outdoor weatherproof CAT-6 cables are armoured


(Y/N) Y

Unused ODU ports are weatherproof capped (Y/N) Y

Protection Conduit for Patch Cords ,Interconnections,


OD power cable and E1 cable routing between 2
shelters or 2 different Cabinets.
Card type in IDU Slot No
MMU4A

Frequency Tx (MHz) 15047


Frequency Rx (MHz) 14627
Tx Power (dBm) 2
RSL(dBM) (<=2 dB Deviation permitted)* -37.24
Modulation 28MHZ
Fade Margin
ATPC Enabled? (Y/N) N
ACM Enabled (Y/N) N
Hi Lo Violation (Y/N) (No violation accepted) N
RSL at near End when Far End Tx Power Mute (Pl note 54.6
value)
HOP visible in NMS (Y/N) (NMS Visibility is
Mandatory) Yes

HOP ID (standard nomenclature to be configured in


NMS also) Sarjepura_AHM2956-RYASHWNT_4963
IP Address/Subnet Mask
Link is alarm free (Y/N) (No Alarm accepeted
Mandatory) Y
External Alarms extended for Outdooor cabinets

Management IP address (if applicable)


Management VLAN ID (for DCN)

Conflict in Management & Traffic VLAN (Y/N) N

Unused VLAn configured in IDU (Y/N) N

Broadcast Limit configured on all Ethernet Ports (Y/N) N

All configured VLANs belongs to only one Fiber POP


(Y/N) N

Management of connecting 3rd party MW equipment

Number of Ethernet ports used for traffic

QoS configured (Y/N) (As per planning Instruction) N

Loopback (RF, IF, NW) testing done (Y/N) Y

All Ethernet config as pe planning instruction (Y/N)

All TDM config as pe planning instruction (Y/N)

Ethernet throughput (in Mbps)


Optical receive level at optical IF ports
Clock Synchronization define (Y/N) (As per planning
Instruction)
Latency ( End to end path )- Ring/ Chain
Packet Drop ( End to end path )- Ring/ Chain
BH E1 till HO Point in ring protection((Y/N)) (Deviation
to be captured separately)
Ring testing ( in case of ring) - SNCP/ ERPS Switching
( OK/ NOT OK)

Auto Switching of traffic (Incase of TN/SDH Hop-Ring)


(OK/not OK) (forceful switching testing mandatory)

Installation Checklist

Site A

Tx rack is fastened to floor & is clean.(No Shaking &


dust free) Yes Y No

MW/ Tx rack DDU/ DCDB / Tx equipments supply


from critical LVD Yes Y No

Verify all MCBs on DDU/ DCDB/ SMPS are labelled


(Legible labelling) Yes Y No

Position of IDU magazine (Tx rack, BTS , wall mount)

IDU & Magazine installaton


(nuts tighten & cards jacked completely in slots) OK O Not OK
K
Labelling of IF cable at Both End, ODU, IDU, Power O
cable , Ethernet cables, PCM ( E1) cable, DDF, MCB etc OK Not OK
is verified. (Legible labelling) K
Check All cables are routed inside the Tx rack
(Ethernet cables, E1 cables, power cable, earthing OK O Not OK
cable etc) (No loose hanging) K

Protection Conduit for Patch Cords ,Interconnections, OK Not OK


OD power cable and E1 cable routing between 2
shelters or 2 different Cabinets.
IF cable/CAT6 routing is secured with IF clamps/Ties O
on cable tray. OK Not OK
K
Earthing of Tx rack is present & connected Yes O No
K
Earthing of Magazine, DDU, IDU, Fan unit & any other
TX equipment is present & connected Yes Y No

IDU Power Cable routing/ Labeling verified (Legible


labeling, crimped Lugs & coloured PVC tape used) OK Y Not OK

IDU Grounding cable connection/ Labeling verified


(crimped Lugs/Legible Labelling) OK Not OK

Earthing from Equipment bus bar of IDU connected


(Crimped Lugs) OK Y Not OK

ODUs are mounted with all nuts & bolt in place and
securely tightened Yes Y No

Verify DDF Rack & Krone Module grounded to the


equipment earth Yes Y No

Verify IF connectors/RJ45 are locked while terminated


at IDU and ODU Yes Y No

Down bent given to IF cable/CAT6 at shelter entry Yes Y No

At ODU end the 1 Mtrs extra cable loop tightened


with tower. Yes Y No

At ODU the IF cable/CAT6 should not hang, otherwise


it will load ODU N type connector OK Not OK
Y
IF cable/CAT6 length (Mtrs)

Earthing of IF Cable/CAT6 connected to Rack/ EGB Yes Y No

Weather proofing of IF cable/CAT6 at earthing point


done Yes Y No

Sealing of IF cable entry point to Shelter & roxtec


Yes No
sealing at entry point to shelter done Y
Antenna Clamps tightened with mounting pole (No
loose clamping permitted) Yes No
Y
Antenna is tightened with Pole (All nuts & bolts
fixing the antenna are tightened) Yes No
Y
The aligned positions of antenna, fixing clamps, fine Y
alignment rods, vertical alignment rods and strut Yes No
marked with thin paint lines at multiple places

ODU is grounded (Y/N) Yes Y No

ODU/Antenna is marked with far end Site ID (Y/N) Yes Y No

Weather proofing of IF connector at ODUs (Water


should not ingress) OK Y Not OK

MW Coupler/Strut rods fixing for 1.2,1.8 Mtr MW Y


Antenna as per installation guidelines (90 degree +- Yes No
15 degree)
All Dummies Installed (Y/N) Yes Y No
Fan units installed & working for magzine for all types
of equipments Yes Y No

Power Backup Available (Y/N) (pl note no of hrs of


backup)
Verify IDU Connected with Dual Power Source Yes Y No

Grounding of Mast Yes Y No


Lightening arrestor Installed. Yes No
Grounding of Lightening arrestor Yes No
SACFA ID (Note Online ID)
All Nuts & Bolts used are ar per specification
& recommendations only
All the deviation (if any) must be captured
separately in Deviation format and to be
approved by Circle CTO only

Stability Test: Statistics During 24 Hrs Test


(On Need basis)

Parameters

Result of 24 hrs. BER Test Acceptance (Y/N) Y


TT ( Total Time)
AT ( Available Time)
ES ( Error Secods )
BBE ( Background BER )
SES ( Severly Error Seconds)
EB ( Error block)
Test to be error free

Site Layout Diagram Enclosed (Y/N)


MW BOQ sheet attached with wiring diagram &
attached to MW Rack (Y/N)

Planning Design data sheet attached (Y/N)


Site Photograph for MW Ant, Cabling and Eqpt
Attached (Y/N)

Signoff :

Project Engineer Name & Sign ( MC Partner)

Engg FM Name & Sign ( MS Partner)

Project Manager Name & Sign (Bharti)

Mobile Number

* EXCEPTIONAL CASES ONLY


Exhibit 4 - Microwave AT Format

Date:- 11/10/2019

Actual Planned Actual Additional Remarks

Site A Site B Site B


MUL3570 5406 5406
Shastri Nagar EPUNRAHATNI EPUNRAHATNI
Kalewadi Phata, Gajanan Hotel Kpila Great Punjab Hotel Kpila Great Punjab Hotel, S. No. 59/1A/2, CTS
OUTDOOR OUTDOOR OUTDOOR

Indus Indus Indus


IN-1362794 IN-1053685 IN-1053685
18.60397/73.78107 18.6083/73.7816 18.6083/73.7816
7.05 187.05 187.05
30 40 40
ML15 0.6m HP ML15 0.6m HP ML15 0.6m HP
29 27 27

V V V

NA NA NA

0.48 0.48 0.48


Rajiv Ranjan Rajiv Ranjan Rajiv Ranjan
MH&G MH&G MH&G

Actual Planned Actual Additional Remarks

Site A Site B Site B

Ceragon Ceragon Ceragon

4,E1 4,E1 4,E1


233 233 233

27K

R1E R1E R1E

EXITING
PACKET PACKET PACKET

1+0 1+0 1+0


N
N
N
IP10
NA NA NA
NA NA NA
NA NA NA

Actual Planned Actual Additional Remarks

Site A Site B Site B

1 1 1

Y Y Y Y

Y Y Y

Slot No

15047 15047 15047


14627 14627 14627
2 2 2
-37.24 -37.24 -37.24
28MHZ 28MHZ 28MHZ

N N N
N N N
N

54.6 54.6 54.6

Yes

Sarjepura_AHM2956-RYASHWNT_4963
Sarjepura_AHM2956-RYASHWNT_4963
Sarjepura_AHM2956-RYASHWNT_4963

Y
FAN Faulty & Door Open
alarms of O/D Cabinet to
be extended through
MW IDU

If yes to be taken up
N N N
with planning
N N N If yes to be removed

As per Planning/OEM
N N N
suggestion

No Management/Traffic
VLAN of different Fiber
N N N POP to be configured in
one IDU

N N N

Y Y Y

Site B Additional Remarks

Yes Y No

Yes Y No

Yes Y No

OK Not OK
Y

OK Y Not OK
OK O Not OK
K

OK Not OK

OK O Not OK
K
Yes No
Y
Yes Y No

OK Y Not OK

OK Not OK

OK Y Not OK

Yes Y No

Yes Y No

Yes Y No

Yes
Y No
Y
Yes Y No

OK Not OK
Y

Yes Y No

Yes Y No

Yes Y No

Yes No
Y
Yes No
Y

Y
Yes No

Yes Y No

Yes Y No

OK Y Not OK

Yes
Y No

Yes Y No

Yes Y No
Yes Y No

Yes Y No
Yes No
Yes No

Site A Site B Additional Remarks

Y Y

OPS SPOC Name & Sign (Bharti)

Project Manager Name & Sign (SP)

Mobile Number
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
Physical
Physical
Physical
Physical
Physical

SOFT/Physical

Physical
Physical
SOFT/Physical
SOFT/Physical

SOFT/Physical
SOFT
SOFT

SOFT

SOFT
SOFT/Physical
SOFT/Physical
SOFT/Physical
Physical
Physical
Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
Physical
Physical

Physical

Physical

Physical

Physical

Physical

SOFT/Physical

SOFT
SOFT
SOFT
SOFT
SOFT
SOFT
SOFT
SOFT
SOFT/Physical

SOFT

SOFT/Physical

SOFT/Physical
SOFT/Physical

SOFT/Physical
SOFT/Physical
SOFT

SOFT
SOFT

SOFT

SOFT

SOFT
SOFT

SOFT
SOFT

SOFT

SOFT
SOFT
SOFT

SOFT
SOFT
SOFT

SOFT

SOFT

SOFT

Physical

Physical

Physical

Physical

Physical

Physical
Physical

Physical

Physical
Physical

Physical

Physical

Physical

Physical

Physical

Physical

Physical

Physical

Physical

Physical
Physical

Physical

Physical

Physical

Physical

Physical

Physical
Physical

Physical

Physical

Physical
Physical

Physical

Physical
Physical
Physical
Physical
Physical
Physical

SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SOFT/Physical
SR.NO
1
2
3
4
5
6
7
8
9
10
11
Snaps requried for Microwave Physical AT
ODU/Antenna is marked with far end Site ID
Labelling of IF cable at Both End, ODU, IDU, Power cable, Patch Cords ,Ethernet cables, PCM ( E1) cable, DDF, MCB e
Earthing of Magazine, ODU, IDU, Fan unit ,IF Cable/CAT6 connected to Rack/ EGB & any other TX equipment is presen
IF CONNECTOR WEATHERPROOF AND LABELLING
At ODU end the 1 Mtrs extra cable loop tightened with tower.
ODU IP SEAL IN CASE OF XPIC
IF MW >=1.2 ,SUPPORT ROD SNAP REQUIRED
In case of XPIC Huawei (CNT(cable) & OMT (Hardware )) snap required )
Protection Conduit for Patch Cords ,Interconnections, OD power cable and E1 cable routing between 2 shelters or 2 diff
IF cable/CAT6 routing is secured with IF clamps/Ties on cable tray.
Lightening arrestor Installed & Grounding of Lightening arrestor .
Installation Snap
1. OD MW SHOWING SITE ID-to B 2. OD MW SHOWING SITE ID- To A

5. MW Installation Showing Labeling, Proper


4. DCDB LABELING- A END Routing & Grounding-A End

7. IDU END LABELING-A Site 8. IDU END LABLING-B SITE

10.IDU Grounding-B SITE 11. IF CONNECTOR WEATHERPROOF-A SITE


ap
3. DCDB LABELLING- B END

6. MW Installation Showing Labeling, Proper


Routing & Grounding-B End

9. IDU Grounding-A SITE

12. IF CONNECTOR WEATHERPROOF-B SITE